niusouti.com

Which two steps are the result of associating a blade server?()A、The compute node reboots and is then connected to the CMCB、A compute node is assigned to a service profileC、if the association is successful the cisco UCS manager boots the cisco UUOS to con

题目

Which two steps are the result of associating a blade server?()

  • A、The compute node reboots and is then connected to the CMC
  • B、A compute node is assigned to a service profile
  • C、if the association is successful the cisco UCS manager boots the cisco UUOS to configure the compute  node
  • D、The compute node reboots to reload and then loads NX OS and establishes connections to both the CMC  and the IOMs

相似考题
更多“Which two steps̳”相关问题
  • 第1题:

    Which two are correct steps in taking a binary backup of MyISAM tables?()

    • A、Always stop the server prior to the backup
    • B、Stop the server or lock the tables prior to the backup
    • C、Stop the server or lock the databases prior to the backup
    • D、Make a copy of the .frm, .myd, and the .myi files
    • E、Make a copy of the binary log and tablespace files

    正确答案:B,D

  • 第2题:

    Which of the following step libraries is included in the license for IPCC Express Standard? ()

    • A、ICM steps  
    • B、e-mail steps  
    • C、media steps 
    • D、database steps

    正确答案:C

  • 第3题:

    What are two steps needed to define a QoS policy for a traffic class?()

    • A、 Determine a minimum bandwidth guarantee.
    • B、 Determine interfaces to which to apply policy.
    • C、 Assign priorities to the class.
    • D、 Configure access control lists.

    正确答案:A,C

  • 第4题:

    Which statement is true about the digital to analog conversion process?()

    • A、the two steps of digital to analog conversion are decompression and reconstruction of the analog signal
    • B、the two steps of digital to analog conversion are decoding and filtering
    • C、the two steps of digital to analog conversion are decompression and filtering of the analog signal
    • D、the two steps of digital to analog conversion are quantization and decoding

    正确答案:B

  • 第5题:

    Which of the following steps should be done FIRST when deploying a Virtual I/O server on a p5-550, which will host three logical partitions: a NIM server and two application servers?()

    • A、Create and install the NIM server
    • B、Create and install the Virtual I/O Server
    • C、Create and install the application servers
    • D、Activate Advanced POWER Virtualization

    正确答案:D

  • 第6题:

    多选题
    Which two steps are the result of associating a blade server?()
    A

    The compute node reboots and is then connected to the CMC

    B

    A compute node is assigned to a service profile

    C

    if the association is successful the cisco UCS manager boots the cisco UUOS to configure the compute  node

    D

    The compute node reboots to reload and then loads NX OS and establishes connections to both the CMC  and the IOMs


    正确答案: C,A
    解析: 暂无解析

  • 第7题:

    单选题
    Which statement is true about the digital to analog conversion process?()
    A

    the two steps of digital to analog conversion are decompression and reconstruction of the analog signal

    B

    the two steps of digital to analog conversion are decoding and filtering

    C

    the two steps of digital to analog conversion are decompression and filtering of the analog signal

    D

    the two steps of digital to analog conversion are quantization and decoding


    正确答案: C
    解析: 暂无解析

  • 第8题:

    单选题
    What are two steps that are taken when a router converts a voice signal from analog to digital form?()
    A

     sampling

    B

     packetization

    C

     quantization

    D

     serialization


    正确答案: A
    解析: 暂无解析

  • 第9题:

    多选题
    Which two of these steps are minimum requirements to configure OSPFv3 under IPv6?()
    A

    Configure a routing process using the command ipv6 router ospf [process-id].

    B

    Add the network statement for the interfaces on which OSPF will run.

    C

    Configure OSPF on the interface that it will run on.

    D

    Use the passive-interface command on the interfaces on which OSPF should not run.

    E

    Enable routing.


    正确答案: D,A
    解析: 暂无解析

  • 第10题:

    单选题
    Which of the following step libraries is included in the license for IPCC Express Standard? ()
    A

    ICM steps  

    B

    e-mail steps  

    C

    media steps 

    D

    database steps


    正确答案: A
    解析: 暂无解析

  • 第11题:

    单选题
    Final exams were incredibly comprehensive, and went on for two weeks, which length made it seem as if they would never end.
    A

    comprehensive, and went on for two weeks, which length made

    B

    comprehensive and since they went on for two weeks, that made

    C

    comprehensive and, since they went on for two weeks, to make

    D

    comprehensive and went on for two weeks, which made

    E

    comprehensive and, by going on for two weeks, it made


    正确答案: B
    解析:
    原句中“which”的使用不正确。D项表意最清晰。E项中的“it”指代模糊。C项语法上不正确。

  • 第12题:

    单选题
    The ladder shall().
    A

    be secured in a position so that it rests firmly against the ship's side from which the discharge operations are carried out

    B

    have at least two replacement steps which are secured in position by a method different from that used in the original construction

    C

    have battens made of hardwood,or other material of equivalent properties,in one piece and not less than 1.80metres long provided at such intervals as will prevent the pilot ladder from twisting

    D

    have steps made of softwood,or other material of equivalent properties,made in one piece free of knots,having an efficient slip surface


    正确答案: A
    解析: 暂无解析

  • 第13题:

    Lower the ladder two steps() ,please !

    • A、too
    • B、more
    • C、little
    • D、few

    正确答案:B

  • 第14题:

    Which two steps check out a database connection from the connection pool?()

    • A、DB Get  
    • B、DB Read  
    • C、DB Write  
    • D、DB Release

    正确答案:B,C

  • 第15题:

    Which two of the following steps are necessary to configure inter-VLAN routing between multilayer switches?()

    • A、Configure a dynamic routing protocol.
    • B、Configure SVI interfaces with IP addresses and subnet masks.
    • C、Configure switch ports with network addresses.
    • D、Configure switch ports with the autostate exclude command.
    • E、Document the MAC addresses of the switch ports.

    正确答案:A,B

  • 第16题:

    A technician installed a new application on a Windows XP desktop. After the application wasinstalled, the technician rebooted the desktop and received a bluescreen error. Which of thefollowing steps should the technician perform?() (Select TWO).

    • A、Boot into Safe Mode
    • B、Replace the motherboard
    • C、Uninstall the application
    • D、Replace the hard drive
    • E、Install more RAM

    正确答案:A,C

  • 第17题:

    多选题
    Which two steps are required for a Kompella Layer 2 VPN?()
    A

    Configure a site ID for each CE

    B

    Configure a VPN label for each VPN

    C

    Configure a MP-BGP session to each PE

    D

    Configure an Extended LDP Session to each PE


    正确答案: A,C
    解析: 暂无解析

  • 第18题:

    多选题
    Which are the two options to which a menu can be assigned?() (Choose two.)
    A

    menu

    B

    functions

    C

    data group

    D

    responsibility

    E

    functional group


    正确答案: B,E
    解析: 暂无解析

  • 第19题:

    多选题
    Which two statements are true about analog to digital conversion of voice signals for use in digital telephony networks?()
    A

    The three required steps in the analog to digital conversion are sampling,encoding,and compression.

    B

    The three required steps in the analog to digital conversion are sampling,quantization,and compression.

    C

    The three required steps in the analog to digital conversion are sampling,quantization,and encoding.

    D

    The output of the sampling process is a pulse code modulation (PCM) signal.

    E

    The output of the sampling process is a pulse amplitude modulation (PAM) signal.


    正确答案: B,E
    解析: 暂无解析

  • 第20题:

    多选题
    Which two steps are performed when configuring a zone?()
    A

    Define a default policy for the zone.

    B

    Assign logical interfaces to the zone.

    C

    Assign physical interfaces to the zone.

    D

    Define the zone as a security or functional zone


    正确答案: D,B
    解析: 暂无解析

  • 第21题:

    多选题
    Which two are correct steps in taking a binary backup of MyISAM tables?()
    A

    Always stop the server prior to the backup

    B

    Stop the server or lock the tables prior to the backup

    C

    Stop the server or lock the databases prior to the backup

    D

    Make a copy of the .frm, .myd, and the .myi files

    E

    Make a copy of the binary log and tablespace files


    正确答案: B,A
    解析: 暂无解析

  • 第22题:

    多选题
    Which two steps check out a database connection from the connection pool?()
    A

    DB Get

    B

    DB Read

    C

    DB Write

    D

    DB Release


    正确答案: B,D
    解析: 暂无解析

  • 第23题:

    多选题
    Which three steps are considered part of the initial configuration?()
    A

    SNMP

    B

    hostname

    C

    root password

    D

    user password

    E

    management access interface


    正确答案: B,A
    解析: 暂无解析