In the plan phase, network readiness assessment addresses which customer need? Select exactly 1 answer(s) from the following:()。A、an assessment of the preparedness of the customers existing system infrastructure to support a propose solutionB、a comprehens

题目

In the plan phase, network readiness assessment addresses which customer need? Select exactly 1 answer(s) from the following:()。

  • A、an assessment of the preparedness of the customers existing system infrastructure to support a propose solution
  • B、a comprehensive design that has been customized based on the operations processes, network management processes, and tools of its system
  • C、an in-depth assessment of the operational environment required to support the operation of both the current and planned solutions
  • D、the optimal technologies for supporting its business requirements and objectives

相似考题
参考答案和解析
正确答案:A
更多“In the plan ph”相关问题
  • 第1题:

    What is the relationship between the estimate and the plan?__________.

    A.The plan depends on the estimate
    B.The estimate depends on the plan
    C.The plan has nothing to do with the estimate
    D.The estimate and the plan depend on each other

    答案:D
    解析:
    本题考查的仍是对短文个别段落和中心意思的理解能力。短文第三段集中讲的就是和建房方案之间的关系。A项只说出了建房方案对预算的依赖关系;B项只说出预算对建房方案的依赖关系,而忽略它们相互作用的一面,因此都是片面的。而C项说的是建房方案与预算毫不相干,这与短文交代的事实背道而驰,故予以排除。

  • 第2题:

    The communication management plan determines the information and communications needs of the stakeholders. In the following statements related to communication management plan. ( ) is false.

    • A、The communication management plan is contained in or is a subsidiary plan of, the project management plan.
    • B、The  communication  management  plan  can  be  formal  or informal, highly detailed or broadly framed, and based on the needs of the project.
    • C、The  communication  manamgement  plan  organize  and summarize the information gathered,and present the results of any analysis as comparedthe performance measurement baseline.
    • D、The communication management plan can include guidelines project status meetings,project team meetings,e-meetines,and e-mail

    正确答案:C

  • 第3题:

    催化剂预处理单元成型机给料泵(10801-P401)密封冲洗形式为()

    • A、PLAN11
    • B、PLAN23
    • C、PLAN53
    • D、PLAN01

    正确答案:C

  • 第4题:

    Which service components develops a plan that identifies the necessary steps to move from an existing system to the Cisco Unified Communications system()

    • A、Migration Plan Development
    • B、Detailed Design Development
    • C、Staging Plan Development
    • D、Implementation Plan Development

    正确答案:A

  • 第5题:

    Which of these correctly identifies the six phases of the Cisco Lifecycle Services framework? ()

    • A、Prepare, Plan, Create, Implement, Operate, and Improve
    • B、Prepare, Plan, Design, Implement, Operate, and Optimize
    • C、Prepare, Plan, Design, Apply, Operate, and Manage
    • D、Prepare, Plan, Design, Implement, Operate and Manage

    正确答案:B

  • 第6题:

    Using Oracle Scheduler you have scheduled two jobs, JOB_A and JOB_B, to run at 9:00 p.m. every Friday. You want both the jobs to use a single resource plan, WEEKEND_PLAN. Which task must have already been performed to enable you to achieve this objective?()

    • A、 A window must have been created with the WEEKEND_PLAN resource plan.
    • B、 A program must have been created with the WEEKEND_PLAN resource plan.
    • C、 A job class must have been created with the WEEKEND_PLAN resource plan.
    • D、 A windows group must have been created with the WEEKEND_PLAN resource plan.

    正确答案:A

  • 第7题:

    单选题
    The Database Resource Manager is not currently active in your database that is up and running. You created a resource plan named DAY_PLAN that contains two sub-plans named MANAGERS_PLAN and CLERKS_PLAN. You decided to activate DAY_PLAN by executing the following statement:       SQL>ALTER SYSTEM SET RESOURCE_MANAGER_PLAN = ’managers_plan’;  What will be the outcome of this statement?()
    A

     The statement will deactivate DAY_PLAN.

    B

     The statement will activate DAY_PLAN as the top plan.

    C

     The statement will activate MANAGERS_PLAN as the top plan.

    D

     The statement will return an error because MANAGERS_PLAN is not the top plan.


    正确答案: D
    解析: 暂无解析

  • 第8题:

    单选题
    Which statement describes the effect of the execution of the above PL/SQL block?()
    A

    The plan baselines are verified with the SQL profiles.

    B

    All fixed plan baselines are converted into nonfixed plan baselines.

    C

    All the nonaccepted SQL profiles are accepted into the plan baseline.

    D

    The nonaccepted plans in the SQL Management Base are verified with the existing plan baselines.


    正确答案: A
    解析: 暂无解析

  • 第9题:

    单选题
    Using Oracle Scheduler you have scheduled two jobs, JOB_A and JOB_B, to run at 9:00 p.m. every Friday. You want both the jobs to use a single resource plan, WEEKEND_PLAN. Which task must have already been performed to enable you to achieve this objective?()
    A

     A window must have been created with the WEEKEND_PLAN resource plan.

    B

     A program must have been created with the WEEKEND_PLAN resource plan.

    C

     A job class must have been created with the WEEKEND_PLAN resource plan.

    D

     A windows group must have been created with the WEEKEND_PLAN resource plan.


    正确答案: B
    解析: 暂无解析

  • 第10题:

    单选题
    You have created a resource plan, DB_PLAN, using DBMS_RESOURCE_MANAGER.CREATE_SIMPLE_PLAN and you want to impose a restriction on utilization of resources by the database users. Which step must be performed before you can start using the resource plan?()
    A

     assign users to consumer groups

    B

     set the resource plan for the instance

    C

     configure a simple resource plan and specify plan directives

    D

     configure a complex resource plan and specify plan directives


    正确答案: A
    解析: 暂无解析

  • 第11题:

    单选题
    Within a resource-plan definition, what differentiates a top-level plan from a subplan?()
    A

    A subplan has the PLAN_SUB parameter value set to SUB

    B

    A top-level plan has the GROUP_OR_PLAN parameter set to the name of the subplan in the resource-plan definition

    C

    There is no difference in the resource-plan definition

    D

    A subplan always has the CPU_MTH parameter value set to RATIO

    E

    The string TOP_LEVEL is appended to the name of top-level resource plans


    正确答案: A
    解析: 暂无解析

  • 第12题:

    单选题
    You have created a resource plan, DB_PLAN, using DBMS_RESOURCE_MANAGER.CREATE_SIMPLE_PLAN and you want to impose a restriction on utilization of resources by the database users.   Which step must be performed before you can start using the resource plan?()
    A

    assign users to consumer groups

    B

    set the resource plan for the instance

    C

    configure a simple resource plan and specify plan directives

    D

    configure a complex resource plan and specify plan directives


    正确答案: A
    解析: 暂无解析

  • 第13题:

    The communication management plan determines the information and communications needs of the stakeholders. In the following statements related to communication management plan. ( ) is false.

    A.The communication management plan is contained in or is A.subsidiary plan of, the project management plan.
    B.The communication management plan can be formal or informal, highly detaileD.or broadly framed, and based on the needs of the project.
    C.The communication manamgement plan organize and summarize the information gathered, and present the results of any analysis as comparedthe performance measurement baseline.
    D.The communication management plan can include guidelines project status meetings, project team meetings, e-meetines, and e-mail.


    答案:C
    解析:
    沟通管理计划用于确定项目干系人的信息需求和沟通方法,以下关于沟通管理计划的叙述中,错误的是:沟通管理计划定期收集、对比和分析基准与实际数据,以便了解和沟通项目进展与绩效情况。A.沟通管理计划是项目管理计划的一部分或子计划 B.沟通管理计划可以根据项目需求是正式或非正式的、非常详细或高度概括的C.沟通管理计划定期收集、对比和分析基准与实际数据,以便了解和沟通项目进展与绩效情况。D.沟通管理计划可包括关于状态会议、项目团队回忆、网络会议和电子邮件等的指南。

  • 第14题:

    Which three are the valid statements in relation to SQL plan baselines?()

    • A、The plans can be manually loaded to the SQL plan baseline.
    • B、The plans in the SQL plan baseline are verified and accepted plans.
    • C、The plans generated for every SQL statement are stored in the SQL plan baseline by default.
    • D、The plan baselines are stored temporarily in the memory as long as the database instance is running.
    • E、  For the SQL plan baselines to be accessible to the optimizer, the SYSAUX tablespace must be online.

    正确答案:A,B,E

  • 第15题:

    数据结构里,定义名称为plan结构体,其有5个元素的结构体数组的定义方式是()。

    • A、struct plan数组名[5];
    • B、struct plan数组名[10];
    • C、plan struct数组名[5];
    • D、plan数组名[5];

    正确答案:A

  • 第16题:

    Which service component in the design phase describes developing a detailed, site-specific plan for implementing the new technology system or solution()

    • A、Implementation Plan Development
    • B、Detailed Design Development
    • C、Systems Acceptance Test Plan Development
    • D、Staging Plan Development

    正确答案:A

  • 第17题:

    The Database Resource Manager is not currently active in your database that is up and running. You created a resource plan named DAY_PLAN that contains two sub-plans named MANAGERS_PLAN and CLERKS_PLAN. You decided to activate DAY_PLAN by executing the following statement:       SQL>ALTER SYSTEM SET RESOURCE_MANAGER_PLAN = ’managers_plan’;  What will be the outcome of this statement?()  

    • A、 The statement will deactivate DAY_PLAN.
    • B、 The statement will activate DAY_PLAN as the top plan.
    • C、 The statement will activate MANAGERS_PLAN as the top plan.
    • D、 The statement will return an error because MANAGERS_PLAN is not the top plan.

    正确答案:C

  • 第18题:

    Which statement describes the effect of the execution of the above PL/SQL block?()

    • A、The plan baselines are verified with the SQL profiles.
    • B、All fixed plan baselines are converted into nonfixed plan baselines.
    • C、All the nonaccepted SQL profiles are accepted into the plan baseline.
    • D、The nonaccepted plans in the SQL Management Base are verified with the existing plan baselines.

    正确答案:D

  • 第19题:

    单选题
    PPI is().
    A

    a plan-position indicator system

    B

    pulse-plan integration

    C

    pulse-pulse input

    D

    power-plan input


    正确答案: D
    解析: 暂无解析

  • 第20题:

    单选题
    The stowage factor should be calculated().
    A

    before the stowage plan is made

    B

    when the stowage plan is made

    C

    after the stowage plan is made

    D

    before loading


    正确答案: A
    解析: 暂无解析

  • 第21题:

    单选题
    You run the SQL Tuning Advisor (STA) to tune a SQL statement that is part of a fixed SQL plan baseline. The STA generates a SQL profile for the SQL statement, which recommends that you accept the profile. Which statement is true when you accept the suggested SQL profile?()
    A

    The tuned plan is not added to the SQL plan baseline.

    B

    The tuned plan is added to the fixed SQL plan baseline as a fixed plan.

    C

    The tuned plan is added to the fixed SQL plan baseline as a nonfixed plan.

    D

    The tuned plan is added to a new nonfixed SQL plan baseline as a nonfixed plan.


    正确答案: C
    解析: 暂无解析

  • 第22题:

    多选题
    The OPTIMIZER_USE_PLAN_BASELINES parameter is set to TRUE. The optimizer generates a plan for a SQL statement but does not find a matching plan in the SQL plan baseline. Which two operations are performed by the optimizer in this scenario?()
    A

    The optimizer adds the new plan to the plan history.

    B

    The optimizer selects the new plan for the execution of the SQL statement.

    C

    The optimizer adds the new plan to the SQL plan baseline as an accepted plan.

    D

    The optimizer adds the new plan to the SQL plan baseline but not in the ENABLED state.

    E

    The optimizer costs each of the accepted plans in the SQL plan baseline and picks the one with the lowest cost.


    正确答案: D,C
    解析: 暂无解析

  • 第23题:

    单选题
    Within a resource-plan definition, what differentiates a top-level plan from a subplan?()
    A

     A subplan has the PLAN_SUB parameter value set to SUB

    B

     A top-level plan has the GROUP_OR_PLAN parameter set to the name of the subplan in the resource-plan definition

    C

     There is no difference in the resource-plan definition

    D

     A subplan always has the CPU_MTH parameter value set to RATIO

    E

     The string TOP_LEVEL is appended to the name of top-level resource plans


    正确答案: C
    解析: 暂无解析

  • 第24题:

    多选题
    Which three are the valid statements in relation to SQL plan baselines?()
    A

    The plans can be manually loaded to the SQL plan baseline.

    B

    The plans in the SQL plan baseline are verified and accepted plans.

    C

    The plans generated for every SQL statement are stored in the SQL plan baseline by default.

    D

    The plan baselines are stored temporarily in the memory as long as the database instance is running.

    E

      For the SQL plan baselines to be accessible to the optimizer, the SYSAUX tablespace must be online.


    正确答案: A,E
    解析: 暂无解析