A customer is planning on having a single Virtual I/O Server (VIOS) configuration in a Power 750. They haveselected a 4-port 1Gb Integrated Virtual Ethernet (IVE). There will be no other network cards installed in the system. One IVE logical port will be used in the VIO Server and will be used as the physicalport in a Shared Ethernet Adapter (SEA). What is the maximum number of IVE logical ports available to use inother LPARs?()
第1题:
Companycom will be using Virtual IO Server to share Ethernet adapters. What can be done to prevent network failure of the client if a Virtual IO Server goes down?()
第2题:
A customer is planning to buy a two enclosure Power 770, and will implement 4 LPARs with the following requirements:Each LPAR must have a private, dedicated connection to the network.The adapter for this network connection must be hot-swappable.The customer wants to minimize the number of I/O slots used. Which of the following fulfills the customer requirements?()
第3题:
A customer is debating whether to use Shared Ethernet versus Virtual Ethernet. Which of the following best describes a key difference between Shared and Virtual Ethernet?()
第4题:
A customer has just purchased an 8-core POWER 570 which has two dual port 1 Gbps Integrated Virtual Ethernet (IVE) adapters. The customer wants to implement queue pairs (QPs) to take advantage of parallel processing of network traffic to its client logical partitions. Assuming that the system is to utilize the IVEs in both CECs, which configuration will allow a logical partition to utilize the entire eight cores for network traffic processing?()
第5题:
What is the theoretical maximum number of logical ports that a one port of a 2-port 10Gb IVE can provide if no VIO Server is connected to the IVE()?
第6题:
A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached; One 4-port 1Gbps IVE adapterPowerVM Standard Edition; They need to add a GX++ adapter and cable it to an I/O drawer. Which of the following must also be ordered?()
第7题:
A customer needs to create a number of LPARs on a new POWER6 server with some LPARs requiring a dedicated network and other LPARs utilizing Virtual Ethernet via a VIO server. Which limitation must be considered when planning the system configuration?()
第8题:
You are an enterprise administrator for Cer-tech .com. All the servers on the network run Windows Server2008. The network consists of a Server that has the Windows Server virtualization role service installed.You create a new virtual machine, installed Windows Server 2008 on it, and configure it to use the physicalnetwork card of the host server. After this installation and configuration the virtual machine, you wereunable to access network resources from the virtual machine. Which of the following options would youchoose to ensure that the virtual host can connect to the physical network?()
第9题:
1
7
15
31
第10题:
2
4
8
16
第11题:
2
4
8
16
第12题:
The I/O workload needs of the client LPARs
The processing requirements of the client LPARs
The memory requirements of the client LPARs
The virtual Ethernet requirements between client LPARs
第13题:
An administrator has a Power 570 in default configuration with a 4 port 1 Gbps Integrated Virtual Ethernet (IVE) adapter. A new application requires that the MCS value for the first port group of the IVE adapter be set to 1. If this change is made what is the maximum number of logical ports, across both port groups, that the IVE adapter can provide? ()
第14题:
Which of the following would be the FIRST step to configure a Virtual I/O Server(VIOS)?()
第15题:
When configuring a dual port gigabit Integrated Virtual Ethernet adapter (IVE), what value must be assigned to Multiple Core Scaling (MCS) to enable 8 logical ports in total? ()
第16题:
A customer has a 4-core POWER6 570 with 4 partitions and a 2-port 1Gbps Integrated Virtual Ethernet (IVE) Adapter. They are having problems with throughput on the Ethernet adapter and want to improve performance. Which of the following solutions will help the customer with this issue for the least cost and with the least interruption?()
第17题:
Company.com has two POWER5 servers. They want the two servers’ virtual Ethernets to appear on the same IP subnet. Which of the following will connect the client virtual Ethernet adapters to the physical Ethernet switch connecting the two servers?()
第18题:
Companycom tells the technical sales specialist that recent announcements state that virtual lan in the datacenter is the best option. The customer wants to use interpartition communication to save on adapters and increase performance. The systems are going to have shared and dedicated processor partitions. Some of the partitions will be running AIX 5.2 and some will be running AIX 5.3. The second p5 590 will be running a mixture of AIX 5.3 and Linux partitions with 2.6 kernel. What limitations of vlan/interpartition communication should be discussed with this customer?()
第19题:
An administrator has a Power 570 in default configuration with a 4 port 1 Gbps Integrated Virtual Ethernet (IVE) adapter. A new application requires that the MCS value for the first port group of the IVE adapter be set to 1. If this change is made, what is the maximum number of logical ports, across both port groups, that the IVE adapter can provide?()
第20题:
You work as an administrator at ABC.com. The ABC.com network consists of a single domain named ABC.com. All servers in the ABC.com domain, including domain controllers, have Windows Server 2012 R2 installed.ABC.com has a Hyper-V server, named ABC-SR13, which hosts multiple virtual machines. You have enabled the use of Single-root I/O virtualization.Which of the following is TRUE with regards to using Single-root I/O virtualization?()
第21题:
A second IVE adapter
A second processor card
PowerVM Enterprise Edition
An additional cable-management arm
第22题:
4
16
20
32
第23题:
Shared Ethernet runs on POWER4 systems
Virtual Ethernet runs on POWER4 systems
Shared Ethernet requires a Virtual I/O server and Advanced Power Virtualization
Virtual Ethernet requires a Virtual I/O server and Advanced Power Virtualization