A technician is installing a memory upgrade for a remote user. The technician notes that the machine is not reporting the correct amount of memory that was installed during the POST step. Which of the following actions should the technician perform FIRST?()
第1题:
A technician is installing an Express Card 54 device into a laptop. How will the device MOST likely be installed?()
第2题:
A technician is installing a parallel PCI card. Which of the following is the IEEE standard for parallel?()
第3题:
Mike, a technician, is installing a wireless router for a client. Which of the following is MOST important when installing a wireless router?()
第4题:
A technician is dispatched to install additional RAM in a computer. The technician unplugs thesystem from the power source, and removes the cover of the PC. Which of the following shouldthe technician do NEXT?()
第5题:
A technician is installing a basic router for a SOHO network. After installing the router the PCs connected to it are not able to acquire an IP address. Which of the following did the technician fail to configure correctly?()
第6题:
When installing a wireless access point, which of the following should the technician perform FIRST?()
第7题:
ATX 4-pin
Molex
PCIe 6-pin
PCIe 8-pin
第8题:
backup the BIOS configuration to use later
install the BIOS update from a command prompt
create a bootable floppy and copy the BIOS update tools to the floppy
read the manufacturer’s guidelines and recommendations on installing the update
第9题:
Frequent reboots
Delayed processor times
Disabled Internet connection
Denied access to share drives
第10题:
Jill, a technician, is installing several PCs in a home that is pre-wired with Ethernet to seven rooms. In the wiring closet all the Ethernet cables are hanging free and are not labeled. Which of the following tools would the technician use to locate the cable that runs to each room?()
第11题:
After installing a new SATA hard drive the technician notices the drive is hot to the touch and is giving off a slight odor. Which of the following should the technician do? ()
第12题:
A technician is installing a new power supply into a computer. One of the power supply connectors that the technician needs to connect to the motherboard is square and contains 4-pins. This connector is known as which of the following?()
第13题:
A technician is installing new memory in a server. The technician would consult the HCL to ensure which of the following?()
第14题:
A technician is installing a printer that uses a parallel cable to connect to a computer. Which of the following pin configurations might the technician encounter? ()
第15题:
Perform a full system backup.
Follow up with the customer, verifying satisfaction.
Ask their manager to contact the customer.
Perform a complimentary virus scan.
第16题:
Run a full scan on the local disk.
Remove infected files.
Update antivirus signatures.
Quarantine infected files
第17题:
Press the F8 Key
Press the F3 Key
Press the F2 Key
Press the F6 Key
第18题:
Power Users
Users
Guests
Administrato