第1题:
A wooden float placed between a ship and a dock to prevent damage to both is called a ______.
A.camel
B.dolphin
C.rat guard
D.wedge
第2题:
On a ship,a door that is required to be marked KEEP CLOSED is designed to ______.
A.prevent the passage of flammable gases
B.prevent the passage of poisonous vapors
C.delay the spread of heat and flames
D.maintain watertight integrity
第3题:
Cribbing is ______.
A.wooden blocks or dunnage placed between a deck load and the deck
B.the chains and shackles used to secure a deck cargo
C.a crate in which a deck cargo is packaged
D.cardboard separation pieces placed between deck loads to prevent chafing
第4题:
The ship is to ()to buoys.
第5题:
after drydocking,while the hull is moist
after drydocking,and the hull has dried
afloat,where it is leaking
afloat,in all accessible areas
第6题:
proceeding
overloading
collision
flooding
第7题:
sea valve chest, sect valve, thruster
bilge motherboard, steering and the shaft system
sea water system
fresh water system
第8题:
steerageway is not taken off
the bow doesn't close the dock first
the bow closes the dock first
the ship has no headway at the time
第9题:
disposal
control
operation
option
第10题:
wooden blocks or dunnage placed between a deck load and the deck
the chains and shackles used to secure a deck cargo
a crate in which a deck cargo is packaged
cardboard separation pieces placed between deck loads to prevent chafing
第11题:
pump from the damaged tank
fight a fire
abandon the rig
use the crossover system
第12题:
ensure the bight is not fouled between the ship and the dock by taking up slack
pay out slack smartly and keep free for running
secure more turns to hold the line against any strain,then clear the area
surge the line so that it maintains a strain without parting
第13题:
______ is not an item of the communication between the ship and shore.
A.agreed procedure to STOP cargo operations
B.Personnel responsible for terminal cargo operations
C.agreed procedure for draught checking
D.agreement between the ship's Master and the terminal representative
第14题:
A deck beam does NOT ______.
A.act as a beam to support vertical deck loads
B.lessen the longitudinal stiffness of the vessel
C.act as a tie to keep the sides of the ship in place
D.act as a web to prevent plate wrinkling due to twisting action on the vessel
第15题:
class super { public float getNum() {return 3.0f;} } public class Sub extends Super { } Which method, placed at line 6, will cause a compiler error?()
第16题:
as a connecting strap between the butted ends of plating
to stiffen areas under points of great stress between beams
to prevent the anchor from fouling when the brake is released
to provide an extra heavy fitting in a heavy lift cargo rig
第17题:
manual mode
automatic mode
remote mode
follow-up mode
第18题:
overspeed;overload
overload;overspeed
over mechanical load;over thermal load
over torque;overspeed
第19题:
at high water
when there is a following current
at slack water
at flood
第20题:
Ballast bags
A keel
Strikes
Sea anchor
第21题:
filling completely
developing free surface
developing free surface moment
collapsing
第22题:
as a connecting strap between the butted ends of plating
to stiffen areas under points of great stress between beams
to prevent the anchor from fouling when the brake is released
to provide an extra heavy fitting in a lift cargo released
第23题:
Liquids should never be transferred between tanks without consulting the dock master
If sea valves have been disassembled, all bonnets must be checked for leakage when the ship is re-floated
Before re-floating, all sea chest strainers should be verified as having been replaced
All of the above