niusouti.com
更多“Everyone knew that the project would be completed and we’d a”相关问题
  • 第1题:

    I have a small token of our gratitude________

    A.that the process can be made simpler.

    B.when we look at this question.

    C.which is the Mark 2 project.

    D.which I would like you to have.


    参考答案:D

  • 第2题:

    is the process of obtaining the stakeholdrs'formal acceptance of the completed project scope. Verifying the scope includes reviewing deliverables and work results to ensure that all were completed satisfactorily.

    A.WBS Creation

    B.Scope definition

    C.Project acceptance

    D.Scope verification


    正确答案:D

  • 第3题:

    The earned value technique is a commonly used method of performance measurement.It integrates project scope,schedule,and cost measures to help the project management team assess project performance.If a project’s Cost Performance Index(CPI=EV/AC)value less than 1.0,it means that( )。 A.the cost savings for work completed B.the project is ahead of its planned schedule C.the cost overrun for work completed D.1ess work was completed than was planned


    正确答案:C
    挣值管理(EVM)是一种常用的绩效测量方法。它综合考虑项目范围、进度与成本指标,帮助项目管理团队评估项目绩效。如果某个项目的成本绩效指数(CPI=EV/AC)值小于1.0,则说明已完成的工作的成本超支(the cost overrun for work completed)。

  • 第4题:

    We would like to () you in this research project.

    A、draw

    B、call on

    C、involve

    D、call at


    参考答案:C

  • 第5题:

    We () the project on time without your kind assistance.

    A、hadn t had completed

    B、didn t have completed

    C、couldn t have completed

    D、cannot have completed


    参考答案:C

  • 第6题:

    Validate Scope is the process of formalizing acceptance of completed().

    A.project deliverables

    B.WBS

    C.activities

    D.milestones


    正确答案:A

  • 第7题:

    A project manager believes that modifying the scope of the project may provide added value service for the customer. The project manager should ( )

    A.assign change tasks to project members
    B.call a meeting of the configuration control board
    C.change the scope baseline
    D. postpone the modification until a separate enhancement project is fundedafter this project is completed according to the original baseline

    答案:D
    解析:
    项目经理认为调整项目范围可以给客户提供增值的服务,项目经理应该怎么做。
    选项A是安排任务变更到项目成员,选项B是召集变更控制委员会会议,选项C是变更项目基线,选项D是按照原先的基线,在确定完成一项改进项目会得到客户的相应资金前,暂缓修改。
    由于是在原内容基础上增加增值服务内容,超出原先范围,应先确定客户认可和增加新资金。因此应选择D。

  • 第8题:

    What does A.CPI of 80%mean?( ).

    A.As of now we expect the total project cost of 80%more than planned
    B.When the project is completed,we will have spent 80%more
    C.Your project is only progressing at 80%of that planned
    D.Your project is only getting 80 cents out of every RMB invested

    答案:D
    解析:
    翻译:
    CPI等于80%,意味着?(74)
    A.目前我们预计比原计划多出80%的项目总成本
    B.当项目完成后,我们会多花费80%
    C.项目进度是只在80%的计划进度
    D.项目只获得80美分每支出人民币1元。

  • 第9题:

    The manager said he believed we would win the contract, but I knew that we didn’t really stand a/an____.

    A.chance
    B.opportunity
    C.probability
    D.possibility

    答案:A
    解析:
    本题考查近义词辨析。选项A、B意为“机会”,选项C、D意为“可能性”。题目意为“经理说他相信我们会赢下这份合同,但我知道我们根本没有机会。”固定搭配“stand a chance”意为“有机会,有可能,有希望”。
      

  • 第10题:

    A project manager believes that modifying the scope of the project may provide added value service for the customer. The project manager should ( ) .

    A.assign change tasks to project members
    B.call A.meeting of the configuration control board
    C.change the scope baseline
    D.postpone the modification until A.separate enhancement project is fundeD.after this project is completeD.according to the original baseline

    答案:D
    解析:
    项目经理认为调整项目范围可以给客户提供增值的服务,项目经理应该怎么做。

    选项A是安排任务变更到项目成员,选项B是召集变更控制委员会会议,选项C是变更项目基线,选项D是按照原先的基线,在确定完成一项改进项目会得到客户的相应资金前,暂缓修改。

    由于是在原内容基础上增加增值服务内容,超出原先范围,应先确定客户认可和增加新资金。因此应选择D。

  • 第11题:

    ()is the process of obtaining the stakeholders’ formal acceptance of the completed project scope.Verifying the scope includes reviewing deliverables and work results to ensure that all were completed satisfactorily.

    • A、Project acceptance
    • B、Scope verification
    • C、Scope definition
    • D、WBS Creation

    正确答案:B

  • 第12题:

    单选题
    Everyone knew that the project would be completed and we’d all have to return to our own separate departments ______ .
    A

    primarily

    B

    precisely

    C

    eventfully

    D

    ultimately


    正确答案: B
    解析:
    每个人都知道这项计划最终将要完成,而我们也会回到自己原来各自的部门去。
    primarily主要地,根本地。precisely正好。eventfully重要地,多事地。ultimately最终地。根据句意,应选D项。

  • 第13题:

    The bad weather prevented us ________ the project on time.

    A. to complete

    B. completed

    C. from complete

    D. completing


    参考答案:D

  • 第14题:

    A project manager believes that modifying the scope of the project may provide added value service for the customer.The project manager should______.

    A.assign change tasks to project members

    B.call a meeting of the configuration control board

    C.change the scope baseline

    D.postpone the modification until a separate enhancement project is funded after this project is completed according to the original baseline


    正确答案:D
    解析:项目经理认为调整项目范围可以给客户提供增值的服务,项曰经理应该怎么做。
      选项A是安排任务变更到项目成员,选项B是召集变更控制委员会会议,选项C是变更项目基线,选项D是按照原先的基线,在确定完成一项改进项目会得到客户的相应资金前,暂缓修改。
      由于是在原内容基础上增加增值服务内容,超出原先范围,应先确定客户认可和增加新资金,因此应选择D。

  • 第15题:

    Since everyone we knew could sew ________, praise was rarely handed out for the commonly practiced craft.

    A、competently

    B、competent

    C、stitch

    D、apronlike


    参考答案:A

  • 第16题:

    The air surrounding us is important to everyone. Without air, we could not (1) Everyone understands that. But air is necessary(2)many other ways that are not always so obvious or widely known. For example, if we did not have air, (3) would be no sound. Sound travels through air. Where there is no air, there is no sound. (4)air, there would be no fire. There would be no automobiles, (5) motors need air in order to operate. Without air there would be no wind or clouds. There would be no (6), as we know it. The night time would be very(7), the days very hot. We would be forced to seek shelter from the sun, (8)there would be no atmosphere to protect us from the sun’s deadly rays. The atmosphere is all the air surrounding the (9) . Atmosphere pressure is the weight of all that air against the (10)of the earth. If we did not have atmospheric pressure, we could not have automobile tires. The tires would swell or burst if they did not have the pressure of the atmosphere against their surface.

    1、 A. living B. lively C. exist D. alive

    2、 A. under B. of C. on D. in

    3、 A. there B. they C. it D. we

    4、 A. Despite B. With C. As D. Without

    5、 A. however B. but C. since D. and

    6、 A. air B. weather C. breeze D. climate

    7、 A. warm B. cool C. cold D. hot

    8、 A. as B. so C. that D. so that

    9、 A. floor B. ground C. land D. earth

    10、 A. top B. surface C. face D. coverage


    参考答案1-5CDADC  6-10BCADB

  • 第17题:

    When the railway is completed, we _____ get to town much easily.

    A、is able to

    B、will be able to

    C、shall be able to

    D、would be able to


    正确答案:B

  • 第18题:

    What does a CPI of 80% mean? ( ) .

    A.As of now we expect the total pr gject cost of 80% more than planned

    B.When the project is completed, we will have spent 80% more

    C.Your project is only progressing at 80% of that planned

    D.Your project is only getting 80 cents out of every RMB invested


    正确答案:D
    CPI等于80%,意味你的项目只获得80美分的每元投资

  • 第19题:

    Louise decided to lend money to the author because__________.

    A.She wanted to join his company
    B.She knew he would build a team
    C.She knew his plan would succeed
    D.She wanted to help promote his sales

    答案:C
    解析:
    由文章倒数第五段“She knew l was dying for money and I had prospects…”可知,Louise认为作者的公司很有希望。故选C项。

  • 第20题:

    A critical path for a project is the series of activities that determine( )by which the project can be completed.

    A.the earliest time
    B.the latest time
    C.the total time
    D.the free time

    答案:A
    解析:
    翻译:关键路径通常由一系列决定项目工期的活动组成,它们决定了整个项目的( )。A.最早完成时间 B.最迟完成时间 C.总时间 D.自由时间

  • 第21题:

    A project is a[temporary]( )of unique,complex,and connected activities having one goal or purpose and that must be completed by a specific time,within budget,and according to( ).Project management is the process of scoping,planning,staffing,organizing,directing,and controlling the development of a(n)(请作答此空)system at a minimum cost within a specified time frame.For any systems development project,effective project management is necessary to ensure that the project meets the( ),is developed within an acceptable budget,and fulfills customer expectations and specifications,Project management is a process that starts at the beginning of a project,extends through a project,and doesn't culminate until the project is completed.The prerequisite for good project management is a well-defined system development process.Process management is an ongoing activity that documents,manages the use of,and improves an organization s chosen methodology(the“process”)for system development,Process management is concerned with the activities,deliverables,and quality standards to be applied to( )project(s).

    A.perfect
    B.acceptable
    C.controlled
    D.completed

    答案:B
    解析:
    表示可接受的、认可的、令人满意的意思。
    附(参考翻译):一个项目是一个独特的、复杂的、相互关联的活动的[临时]序列,有一个目标或目的,必须在特定的时间、预算内和根据规范完成。项目管理是一个范围界定、计划、人员配置、组织、指导和控制可接受系统开发的过程,在规定的时间内以最低的成本进行。对于任何系统开发项目,有效的项目管理都是必要的,以确保项目在截止日期前完成,在可接受的预算内开发,并满足客户的期望和规范,项目管理是从项目开始时开始的过程,延伸到一个项目中,直到项目完成才达到顶点。良好的项目管理的先决条件是定义良好的系统开发过程。过程管理是一项持续的活动,它记录、管理和改进组织为系统开发所选择的方法(“过程”),过程管理涉及应用于所有项目的活动、可交付成果和质量标准。

  • 第22题:

    ( )When we saw his face,we knew_______was bad.

    A.the news
    B.some news
    C.a news
    D.news

    答案:A
    解析:

  • 第23题:

    单选题
    () is the process of obtaining the stakeholders' formal acceptance of the completed project scope .verifying the scope includes reviewing deliverables and work results to ensure that all were completed satisfactorily.
    A

    projectacceptance

    B

    scopeverification

    C

    scopedefinition

    D

    WBS Creation


    正确答案: B
    解析: 该题的关键词为"obtaining the stakeholders' formal acceptance、 verifying the scope",其语句结构为" (主语)1S(谓语)the process of obtaining the stakeholders' formal acceptance ofthe completed project scope",含义为"什么过程是为已完成的项目范围获取干系人的正式验收",选项B对项目的范围进行验证,其他选项容易排除。

  • 第24题:

    单选题
    Many people_________ in the project at both research and editingstages and we would like to thank them all here.
    A

    have involved

    B

    have been involved

    C

    having involved

    D

    having been involved


    正确答案: C
    解析: