VLAN
Virtual Ethernet
Virtual I/O Server Support
Capped and Uncapped Partitions
第1题:
Company.com would like to share CPU resources between AIX V5.3 and Linux partitions. Which solution would best satisfy this customer requirement?()
第2题:
A customer wants to take advantage of IBM’s Micro-Partitioning capabilities for their new AIX applications. The pSeries technical specialist should recommend purchasing which of the following?()
第3题:
The system administrator at a university has many stand-alone machines and wants to consolidate them, minimizing the amount of time to upgrade all of the operating systems. Which of the following solutions supports the requirement?()
第4题:
A large customer is consolidating their pSeries systems onto a p5 590. They will have a requirement for a single device (disk, lun) to have multiple paths through different adapters in a single LPAR. The primary applications were written for AIX 5.2. Which of the following would be the recommended solution to satisfy this requirement?()
第5题:
Which of the following steps should be done FIRST when deploying a Virtual I/O server on a p5-550, which will host three logical partitions: a NIM server and two application servers?()
第6题:
Companycom has a p5 595 running 12 LPARs. They are interested in high bandwidth, secure communication between two of the LPARs within the p5 595 server. They do not have any unused Ethernet adapters. Which of the following recommendations will best meet this requirement?()
第7题:
Utilize the integrated 10/100/1000 network interface
Implement Virtual Ethernet to enable inter-partition communication
Implement shared Ethernet with the Ethernet adapters utilized in the other LPARs
Implement a Point to Point protocol serial communication between the p5 595 serial ports
第8题:
Change to a 4-way p5-550
Use Capacity on Demand
Configure a fourth logical partition
Add memory to the configuration
第9题:
Micro-Partitioning
Partition Load Manager
eWLM
Grid Toolbox
第10题:
Create and install the NIM server
Create and install the Virtual I/O Server
Create and install the application servers
Activate Advanced POWER Virtualization
第11题:
HMC command line
Uncapped processors
Partition Load Manager
Enterprise Workload Manager
第12题:
Configure a Shared Ethernet Adapter on the Virtual I/O Server.
Use the same virtual LAN ID on each LPAR.
Set up IP routing through an LPAR on each system.
Set up an IP firewall through an LPAR on each system.
第13题:
A customer would like to share the processor resources automatically between logical partitions. Which of the following would accomplish this requirement without user interaction? ()
第14题:
Company.com has four pSeries servers in their data center and wants to deploy multiple Micro-Partitions. Which of the following data center servers can be used for this purpose?()
第15题:
Which feature allows multiple partitions to share access to the network through the same physical adapter?()
第16题:
Company.com is ordering a new p5-570 and planning for the option of using Capacity on Demand to activate additional resources in the future. Which of the following is a prerequisite to support the addition of CPUs or memory without an outage?()
第17题:
Company.com would like to have the processor resources on their system efficiently shared between logical partitions, but does not require management of memory or I/O resources. Which of the following would accomplish this requirement?()
第18题:
Assign the adapters to a Virtual IO partition
Use the MPIO function included in AIX 5.2
Migrate the application to AIX 5.3 and use the MPIO function
Set up two Virtual IO partitions and attach both partitions to the device
第19题:
Use Micro-Partitioning
Configure a Virtual I/O Server
Configure dynamic logical partitions
Activate Advanced POWER Virtualization
第20题:
p5 hardware, AIX 5.2, Virtual I/O Server
POWER4 hardware, AIX 5.3, Virtual I/O Server,
p5 hardware, AIX 5.3, Advanced POWER Virtualization feature
POWER4 hardware, AIX 5.2, Advanced POWER Virtualization feature
第21题:
p5-520 running Virtual I/O Server
p690 running AIX 5L V5.3
p5-510 running AIX 5L V5.2
p5-520 running two dedicated processor partitions
第22题:
VLAN
Virtual Ethernet
Virtual I/O Server Support
Capped and Uncapped Partitions
第23题:
Dynamic LPARs
On/Off Capacity on Demand
Uncapped Micro-Partitioning
Enterprise Workload Manager
第24题:
VLAN
Virtual Ethernet
Virtual I/O Server Support
Capped and Uncapped Partitions