Create a dedicated LPAR for the existing workload and a Micro-Partition for the Web server.
Create a dedicated LPAR for the existing workload and a dedicated LPAR for the Web server.
Create a Micro-Partition for the existing workload and a dedicated LPAR for the Web server.
Create a Micro-Partition for the existing workload and a Micro-Partition for the Web server.
第1题:
The administrator has just installed a new memory module into the server. Now, the server is not showing the new memory. Which of the following should the administrator perform FIRST?()
第2题:
he system administrator is making system wide changes to a server, which will add to the PATH variable for the server environment. Where is the PATH variable found for the system?()
第3题:
A system administrator has just finished upgrading a system to AIX 5.2. If there are future problems, the system administrator would like to add an entry to the AIX errorlog to record this event. Which of the following commands can be issued for this purpose?()
第4题:
The system administrator is making system wide changes to a server, which will add to the PATH variable for the server environment. Where is the PATH variable found for the system?()
第5题:
A system administrator is deploying a new POWER5 server. The application requires AIX 5L V5.2. Which of the following virtualization technologies can be used?()
第6题:
Recently traffic to the company web server has more than doubled, resulting in slower response times from the server. An administrator has decided to add a second, identical 10/100/1000 NIC to the server. The server is presently connected to a 10/100/1000 switch, with four open ports on the switch. Which of the following is the BEST solution to speed up web traffic?()
第7题:
/profile
/etc/envpath
/etc/profile
/etc/environment
第8题:
telinit -q
startsrc -s bootpd
refresh -s inetd
第9题:
Free up more ports on the switch
Enable server load balancing
Move the second network adapter to a new subnet
Enable network adapter teaming
第10题:
Create a dedicated LPAR for the existing workload and a Micro-Partition for the Web server.
Create a dedicated LPAR for the existing workload and a dedicated LPAR for the Web server.
Create a Micro-Partition for the existing workload and a dedicated LPAR for the Web server.
Create a Micro-Partition for the existing workload and a Micro-Partition for the Web server.
第11题:
EIDE
SATA
Serial
Video
第12题:
Use alt_disk_install to install AIX on all logical partitions.
Configure the DVD as a desired resource on all partitions.
Configure all resources as shared resources between all partitions.
Create a separate NIM server to manage the installation of all partitions.
第13题:
A server has 500GB of data that must be backed up nightly. The administrator has upgraded the oldLTO2 drive to an LTO3, but the data still will not fit on a single tape. Which of the following additional stepsshould the administrator perform to accommodate the data?()
第14题:
Company.com has four pSeries servers in their data center and wants to deploy multiple Micro-Partitions. Which of the following data center servers can be used for this purpose?()
第15题:
Company.com has a two-way p5-520 that will be running three shared processor Micro-Partitions consuming 60 percent of system resources. Immediately prior to shipment, the customer discovered they need to run a fourth server that requires AIX 5L V5.2. Which of the following will satisfy this requirement?()
第16题:
Company.com has a single pSeries server with two shared processor logical partitions. The first partition has peak resource requirements during weekdays. The second partition has peak resource requirements during weekends. During the peak times, the total workload between the partitions does NOT exceed the capacity of the server. However, the partitions are not able to utilize the full capacity of the system during peak times, because the necessary CPU and memory resources are not always allocated to the busiest partition. Which of the following options would best balance these resources?()
第17题:
Which of the following should be done FIRST when setting up a new p5-520 to be managed by a new HMC via a private network?()
第18题:
DLPAR
Micro-Partitioning
Virtual Storage
Virtual Ethernet
第19题:
/usr/bin/errmsg System upgraded to AIX 5.2
/usr/bin/errlog System upgraded to AIX 5.2
/usr/bin/errupdate System upgraded to AIX 5.2
/usr/bin/errlogger System upgraded to AIX 5.2
第20题:
SPOT
lpp_source
mksysb
install CD
第21题:
alog
errpt
lscfg
installp
第22题:
/profile
/etc/envpath
/etc/profile
/etc/environment
第23题:
Configure AIX Workload Manager
Configure Partition Load Manager
Configure eServer Workload Manager
Use DLPAR from the HMC