Use DLPAR to avoid an outage.
Deploy a redundant VIO server in the POWER5 system.
Add additional Host Bus Adapters and Network adapters to the VIO server.
Implement a standby server and move all partitions to it before applying future updates.
第1题:
A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system. How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()
第2题:
Which action enables an administrator to make a VIO Server automatically activate when the physical machine is powered on?()
第3题:
A customer uses third party storage and would like to connect it to a Virtual IO server on a Power 550. How can the third party storage device drivers be installed? ()
第4题:
Company.com recently experienced an unanticipated system outage when the VIO server was upgraded. The current p5-570 has six Micro-Partitions and a VIO server partition. How can a similar outage be avoided in the future?()
第5题:
Company.com is ordering a new p5-570 and planning for the option of using Capacity on Demand to activate additional resources in the future. Which of the following is a prerequisite to support the addition of CPUs or memory without an outage?()
第6题:
Create a VLAN between the web server and database server.
Purchase APV and install the VIOS.
Increase the priority of the Web server.
Create separate LPARs for Web and database workloads.
第7题:
Use DLPAR to avoid an outage.
Deploy a redundant VIO server in the POWER5 system.
Add additional Host Bus Adapters and Network adapters to the VIO server.
Implement a standby server and move all partitions to it before applying future updates.
第8题:
A VIO server requires a dedicated LHEA port.
There is a limit of 32 LPARs per virtual LAN.
Two VIO servers will be required. A single VIO server can only provide virtual storage or virtual Ethernet.
Two VIO servers will be required. One to provide virtual networking and another to provide dedicated networking.
第9题:
mksysb -t vio /mountpoint
backupios -file /mountpoint
mksysb -i /mountpoint/vio.mksysb
backupios -mksysb -file /mountpoint/vio.mksysb
第10题:
Use smitty install on the client partitions.
Use padmin command in the VIO Server.
Use the oem_setup_env environment in the VIO Server.
Use cfgmgr to detect/configure the devices within the client AIX partition.
第11题:
NPIV andvSCSI both require multipathing in VIO Server only.
NPIV requiresmultipathing software on client LPARs, vSCSI requires multipathing software on VIO Server.
NPIV requiresmultipathing software on VIO Server, vSCSI requires multipathing software on client LPARs.
NPIV requiresmultipathing and MPIO software on VIO Server LPARs, vSCSI requires multipathing software on VIO Server and MPIO on client LPARs.
第12题:
Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.
Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.
Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.
Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.
第13题:
An administrator has recently added a VLAN to the VIO server and wants to update the documentation. Which command displays the current VIO server VLAN configuration?()
第14题:
Companycom has five LPARs, but only one CD drive. How should the CD drive be shared among all the users without system administrator action?()
第15题:
Company.com has a p5-570 with an application running on each of three Micro-Partitions. The disk I/O is shared through a VIO server. A technical specialist has been asked to upgrade the VIO server. Which of the following procedures should be taken to maintain the integrity of the partitions?()
第16题:
A customer needs to create a number of LPARs on a new POWER6 server with some LPARs requiring a dedicated network and other LPARs utilizing Virtual Ethernet via a VIO server. Which limitation must be considered when planning the system configuration?()
第17题:
Shut down all client partitions before updating the VIO server.
Disconnect the client partitions from any IP networks before updating the VIO server.
Update the client partitions to the latest OS maintenance level before updating the VIO Server.
Update the VIO server while the partitions are running, but reboot each client partition at a convenient time after the update.
第18题:
Use DLPAR to avoid an outage.
Deploy a redundant VIO server in the POWER5 system.
Add additional Host Bus Adapters and Network adapters to the VIO server.
Implement a standby server and move all partitions to it before applying future updates.
第19题:
Use SUMA to obtain the drivers.
Use smitty install on the client partitions.
Use oem_setup_env environment in the VIO server.
Use cfgmgr to configure the devices within the client partition.
第20题:
CDAT
Configuration and Options Guide (COG)
Physical Alarm Sounding in Data Center
IBM Systems Director
第21题:
lsmap -all
lsmap -net
lsmap -ent
lsmap -vlan
第22题:
Increase the memory on the server.
Reconfigure drives to a RAID 0+1.
Install a battery backed write cache module in the system.
Instruct the user to save to the local system instead of to the server.
第23题:
Ensure the /etc/auto_start file exists on the VIos
Ensure the ’cfgdev -a boot=yes’ command has been executed.
Select the ’Automatically start when the managed system is powered on’ option within the vio Server lpar profile.
Add the VIO Server to the ’Automatically start when the managed system is powered on’ field on the managed System properties.
第24题:
Allocate the CD to the VIO Server and NFS export the CD to the user LPARs
Allocate the CD to one of the user LPARs and config the VIO Server to NFS import it
Allocate the CD to the VIO Server and the LPARs will share it as a Virtual SCSI device
Allocate the CD to one of the user LPARs and NFS export it to the remaining user LPARs