第1题:
Company.com has a single pSeries server with two shared processor logical partitions. The first partition has peak resource requirements during weekdays. The second partition has peak resource requirements during weekends. During the peak times, the total workload between the partitions does NOT exceed the capacity of the server. However, the partitions are not able to utilize the full capacity of the system during peak times, because the necessary CPU and memory resources are not always allocated to the busiest partition. Which of the following options would best balance these resources?()
第2题:
Which functionality would a customer use to share available CPU resources between AIX and Linux partitions on a Power system?()
第3题:
Companycom has a requirement for an LPAR in their p5 595 to run SUSE Linux. They also require an adapter that is not currently supported in Linux. Which of the following would be the best solution to recommend?()
第4题:
Companycom is planning a p5 595 running AIX 5L 5.3 LPARs. They would like to design the system using physical resources with maximum resource efficiency. One LPAR requires a peak load of 30 processors during the week with a low of 1 processor required on the weekend. The other LPAR requires only a single processor most of the time, but needs at least 24 processors at the beginning of the weekend to finish its weekly processing in the window allocated. Which of the following solutions is most appropriate to continuously maximize resource use for these two LPARs?()
第5题:
A customer has a requirement for a storage solution that meets the following criteria: (1)Heterogeneous hosts attached (2)Support for block I/O (3)High Speed (4)Scalable Which solution would satisfy the customer’s requirement?()
第6题:
Reserve Capacity on Demand
Utility Capacity on Demand
Capacity Upgrade on Demand
Uncapped Capacity on Demand
第7题:
DS8700 system with three frames
DS8800 system with threeframe
DS8700 system with two frames
DS8800 system with two frames
第8题:
Loadleveler
AIX Workload Manager
Partition Load Manager
Tivoli Provisioning Manager
第9题:
Assign the adapter to an IO Hosting partition
Use AIX 5L affinity to move the application from SUSE to AIX
Use AIX 5.3 drivers to install the adapter in the Linux LPAR
Assign the adapter to an AIX 5.3 partition running Linux Affinity
第10题:
HMC command line
Uncapped processors
Partition Load Manager
Enterprise Workload Manager
第11题:
Remove the physical Ethernet adapters from the LPARs
Activate Advanced POWER Virtualization
Update microcode for the virtual adapters
Upgrade AIX V5.2 LPAR to AIX V5.3
第12题:
Use alt_disk_install to install AIX on all logical partitions.
Configure the DVD as a desired resource on all partitions.
Configure all resources as shared resources between all partitions.
Create a separate NIM server to manage the installation of all partitions.
第13题:
Company.com would like to configure a virtual Ethernet between an AIX V5.3 LPAR and an AIX V5.2 LPAR. Which of the following options is necessary to complete this task?()
第14题:
A large customer is consolidating their pSeries systems onto a p5 590. They will have a requirement for a single device (disk, lun) to have multiple paths through different adapters in a single LPAR. The primary applications were written for AIX 5.2. Which of the following would be the recommended solution to satisfy this requirement?()
第15题:
Companycom is considering a partitioned solution with one of the LPARs utilizing 12 CPUs. Multiple applications will be loaded on this large LPAR. However, the customer wants to ensure some tasks will have higher priority access to the CPU and memory resources. Which of the following solutions would best satisfy the requirement?()
第16题:
Company.com would like to have the processor resources on their system efficiently shared between logical partitions, but does not require management of memory or I/O resources. Which of the following would accomplish this requirement?()
第17题:
Assign the adapters to a Virtual IO partition
Use the MPIO function included in AIX 5.2
Migrate the application to AIX 5.3 and use the MPIO function
Set up two Virtual IO partitions and attach both partitions to the device
第18题:
Dynamic LPAR
Micro Partitions
Entitled capacity
Multiple Shared Processor Pools
第19题:
Micro-Partitioning
Partition Load Manager
eWLM
Grid Toolbox
第20题:
SAN
NAS
SCSI
iSCSI
第21题:
Configure AIX Workload Manager
Configure Partition Load Manager
Configure eServer Workload Manager
Use DLPAR from the HMC
第22题:
Dynamic LPARs
On/Off Capacity on Demand
Uncapped Micro-Partitioning
Enterprise Workload Manager
第23题:
Use AIX 5.3 which supports micro-partitioning for both the test and training LPARS
Use DLPAR to move resources from the test LPAR to training when training is active
Install Partition Load Manager to share resources between the test and training environments
Install Advanced Power Virtualization and then use micro-partitioning for both the test and training LPARs