POWER Hypervisor
Virtual LAN
POWER5 processor
Redundant Power and Cooling
第1题:
A customer wants to take advantage of IBM’s Micro-Partitioning capabilities for their new AIX applications. The pSeries technical specialist should recommend purchasing which of the following?()
第2题:
A customer has requested five rack mounted servers, and a rack. They want redundant power connections. Which of the following is required to meet these requirements?()
第3题:
Micro-Partitioning can be defined as().
第4题:
The administrator of a Power 595 server is required to concurrently host LPARs for two different customers. Both customers’ LPARs have the same VLAN ID and subnet range, but their traffic must be isolated from each other. Which feature within the system would provide this functionality?()
第5题:
Which of the following steps should be done FIRST when deploying a Virtual I/O server on a p5-550, which will host three logical partitions: a NIM server and two application servers?()
第6题:
A customer plans to consolidate to high-end enterprise level servers using multiple partitions. They are evaluating an IBM POWER5 solution for their server consolidation environment. Which of the following best describes the value of the IBM solution as compared with the competition?()
第7题:
Create capped partitions for the database servers.
Create workload partitions for the database servers.
Create a separate shared processor pool for the database servers.
Create virtual processors equal to the entitlement for database servers.
第8题:
Redundant power supplies with one power supply connected and one power supply as a hot spare.
Redundant power supplies with each connected to a separate power circuit.
Redundant power supplies connected via a Y-cable.
Redundant power supplies with each connected to the same power circuit.
第9题:
802.1Q
Virtual switch
Logical Host Ethernet (LHE) Adapter
Shared Ethernet Adapter (SEA) Trunking
第10题:
POWER4
POWER5
POWER6
POWER5+
第11题:
Create and install the NIM server
Create and install the Virtual I/O Server
Create and install the application servers
Activate Advanced POWER Virtualization
第12题:
Configure a Shared Ethernet Adapter on the Virtual I/O Server.
Use the same virtual LAN ID on each LPAR.
Set up IP routing through an LPAR on each system.
Set up an IP firewall through an LPAR on each system.
第13题:
Companycom currently has three p650 servers in their environment and they are implementing a p5 595. The p650 servers are running in an SMP environment, but are connected to a pair of HMCs. In order to follow best practices in the enterprise server environment and maintain HMC connectivity to the p650s, what else will needs to be ordered in addition to the p5 595?()
第14题:
Company.com has purchased a 2-way p5-520 and would like to create three Micro-Partitions on the server. Which feature of Advanced POWER Virtualization would allow them to create the desired number of partitions?()
第15题:
Company.com has two POWER5 servers. They want the two servers’ virtual Ethernets to appear on the same IP subnet. Which of the following will connect the client virtual Ethernet adapters to the physical Ethernet switch connecting the two servers?()
第16题:
What is the minimum version of POWER architecture which supports capped and uncapped partitions in the same shared processor pool?()
第17题:
Which of the following best describes Simultaneous Multi-threading (SMT)?()
第18题:
Include a new HMC in the order to connect to the p5 595
Include a pair of new HMCs in the order to connect to the p5 595
Include a media set for POWER5 HMC in the order to upgrade one of the existing HMC’s to POWER5 capabilities
Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC to POWER5 capabilities Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC? To POWER5 capabilities
第19题:
Redundant power supplies on the servers
Redundant PDUs in the rack
edundant power supplies in the servers and redundant PDUs in the rack
Redundant power supplies in the servers, redundant PDUs in the rack, and Active Energy Manager (AEM)
第20题:
The POWER5 system has greater memory and processor granularity and can also run both Linux and AIX at the same time in different LPARs.
The POWER5 system supports more partitions, processors, and memory than any competitor’s solution.
The POWER5 system has the lowest partitioning overhead and can also run both Linux and AIX at the same time in different LPARs.
The POWER5 system supports more partitions and has the lowest partitioning overhead.
第21题:
A POWER5 microprocessor feature that allocates two processors to each application
A Workload Manager feature that allows two processing threads to be executing on a single processor
An AIX v5.2 feature that allows two processing threads to be executing on a single processor concurrently
A POWER5 microprocessor feature that allows two processing threads to be executing on a single processor concurrently
第22题:
multiple partitions that share the processing power of a set of physical processors where a partition can be assigned as little as 1/2 of a physical processor's resource.
multiple partitions that share the processing power of a set of physical processors where a partition can be assigned as little as 1/100th of a physical processor's resource.
an advanced virtualization feature of POWER5 systems with Linux (SUSE and Red Hat for POWER) and AIX 5L Version 5.3 that allows multiple partitions to share the processing power of a set of physical processors.
an advanced virtualization feature of POWER5 systems with Linux (SUSE and Red Hat for POWER) and AIX 5L Version 5.2 or 5.3 that allows multiple partitions to share the processing power of a set of physical processors.
第23题:
Virtual Ethernet
Micro-Partitioning
Virtual I/O Server
Capped and uncapped partitions