Use the Workload Estimator capacity planning tool.
Use prtconf output from legacy systems.
Use the LPAR Validation Tool.
Use Performance Management Services.
第1题:
A customer has two Power 770 systems with 4 enclosures each. Thirty two cores and 1TB of memory are activated on each system. Each system has 3 database partitions and each partition has 10 cores and 300GB of memory. Which solution will provide automated recovery of unplanned outages at least cost?()
第2题:
A graphics card has been added and the system rebooted. When running the lsdev-Cc adapter, the graphics card is not listed in the output. Which of the following actions should be performed?()
第3题:
Company.com has a single pSeries server with two shared processor logical partitions. The first partition has peak resource requirements during weekdays. The second partition has peak resource requirements during weekends. During the peak times, the total workload between the partitions does NOT exceed the capacity of the server. However, the partitions are not able to utilize the full capacity of the system during peak times, because the necessary CPU and memory resources are not always allocated to the busiest partition. Which of the following options would best balance these resources?()
第4题:
How can resource allocations for an active partition on a Power 750 be changed immediately and permanently?()
第5题:
Companycom is planning a p5 595 running AIX 5L 5.3 LPARs. They would like to design the system using physical resources with maximum resource efficiency. One LPAR requires a peak load of 30 processors during the week with a low of 1 processor required on the weekend. The other LPAR requires only a single processor most of the time, but needs at least 24 processors at the beginning of the weekend to finish its weekly processing in the window allocated. Which of the following solutions is most appropriate to continuously maximize resource use for these two LPARs?()
第6题:
Your network has a single domain with 1,000 client computers that run Windows Vista. All client computers are members of the domain. You are planning to deploy Windows 7. You need to create a report that shows hardware and device compatibility on all client computers. You need to perform this action without installing any additional software on the client computers. Which tool should you use?()
第7题:
Your company is planning to deploy Windows 7 to all client computers. You have the following requirements: Test an application to detect potential compatibility issues caused by User Account Control (UAC). Monitor an application’s operating system use. You need to select the appropriate method to detect application compatibility issues. What should you do?()
第8题:
Use either s1 or s2 port configured as a TTY interface with a NULL Modem cable.
Use the s2 serial port on each system configured as a TTY interface with a NULL modem cable.
Use the s1 port on each system configured as a TTY interface with a standard serial modemcable.
Verify with IBM support which native serial ports for the server model can be used for HACM pheartbeats.
第9题:
CPUs
Disk
Memory
NetworkX
第10题:
vmstat and iostat data from the older machines
The number of CPUs that were installed in the original machines
Data from Workload Estimator (WLE) and IBM Performance Management (PM)
Performance data that is collected from the new system after it has been put into production
第11题:
Using a Windows PE boot media, use ImageX to apply the image from a network share to the client computers.
Use System Center Configuration Manager 2007 R2 to perform a zero-touch installation.
Use the Microsoft Deployment Toolkit to perform a lite-touch installation.
Use Windows Deployment Services on a network server to deploy Windows 7 by using an install image.
第12题:
Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.
Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.
Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.
Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.
第13题:
A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system. How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()
第14题:
A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()
第15题:
A customer is installing an HMC-managed Power 720 with two partitions, one for Production the other for Testing. They plan to use the Testing partition only occasionally and want to minimize hardware. Which of the following meets these requirements?()
第16题:
Company.com is ordering a new p5-570 and planning for the option of using Capacity on Demand to activate additional resources in the future. Which of the following is a prerequisite to support the addition of CPUs or memory without an outage?()
第17题:
Which statements are true regarding system-partitioned tables?()
第18题:
You are planning to deploy Windows 7 Enterprise to all of your company’s client computers. You have the following requirements: Create two custom partitions on each client computer’s hard disk, one for the operating system and the other for data. Automatically create the partitions during Windows Setup. You need to design an image that meets the requirements. What should you do?()
第19题:
Use the Workload Estimator capacity planning tool.
Use prtconf output from legacy systems.
Use the LPAR Validation Tool.
Use Performance Management Services.
第20题:
vmstat and iostat data from the older machines
The number of CPUs that were installed in the original machines
Data from Workload Estimator (WLE) and IBM Performance Management (PM)
Performance data that is collected from the new system after it has been put into production
第21题:
Purchase PowerVM Enterprise Edition.Use System Director to automate Live Partition Mobility to recover from partition failure
Create additional shared processor partitions as standby nodes.Use PowerHA SystemMirror to activate and use CoD resources when a failover occurs
Purchase an additional 32-core Power 750 with PowerHA SystemMirror Standard Edition.Use the new system as standby node with the XD component of PowerHA
Purchase an additional Power 770 system.Locate production and standby database partitions on each system.Use DB2 pureScale to provide automated partition monitoring and failover
第22题:
Configure AIX Workload Manager
Configure Partition Load Manager
Configure eServer Workload Manager
Use DLPAR from the HMC
第23题:
IBM eConfig
IBM Performance Monitor
IBM Workload Estimator (WLE)
IBM System Planning Tool (SPT)
第24题:
Create a system profile for each partition. Assign all needed resources as 'required'.
Define all system resources as 'desired' on the Testing partition. Activate only as needed.
Create two shared processor pools. Assign the minimal I/O resources required for each partition to the shared pools.
Create both partitions with minimal 'required' resources, and optional resources as 'desired'. Activate each partition as necessary.