niusouti.com

单选题A technician needs to replace the processor on a server’s motherboard. The motherboardsupports Socket 478 processors. Which of the following processors would be compatible with this motherboard?()A AMD AthlonB Pentium IIIC AtomD Pentium 4

题目
单选题
A technician needs to replace the processor on a server’s motherboard. The motherboardsupports Socket 478 processors. Which of the following processors would be compatible with this motherboard?()
A

AMD Athlon

B

Pentium III

C

Atom

D

Pentium 4


相似考题
更多“A technician needs to replace the processor on a server’s mo”相关问题
  • 第1题:

    A technician wants to compare a new servers performance over a period of time. Which of the following should the technician do FIRST?()

    • A、 Monitor processor performance logs
    • B、 Constantly check the task manager
    • C、 Use performance server logs
    • D、 Establish a baseline for the server

    正确答案:D

  • 第2题:

    A technician needs to build a server with at least 16GB of RAM and Windows 2008R2 as the operating system. Which of the following processors should the technician choose?()

    • A、32-bit AMD processor
    • B、32-bit Intel P4 processor
    • C、64-bit Intel processor
    • D、64-bit ARM processor

    正确答案:C

  • 第3题:

    A technician purchases a new 120 GB IDE hard disk to use in an old server as a swap drive. After adding the drive to the server, the technician discovers that the operating system does not detect the drive.   After rebooting the server, the technician notices the drive is missing from POST and comes to the conclusion that the BIOS needs to be updated. The technician downloads the latest version of the BIOS update from the manufacturer website.   Which action should the technician take next?()

    • A、 backup the BIOS configuration to use later
    • B、 install the BIOS update from a command prompt
    • C、 create a bootable floppy and copy the BIOS update tools to the floppy
    • D、 read the manufacturer’s guidelines and recommendations on installing the update

    正确答案:D

  • 第4题:

    A technician needs to replace the processor on a server’s motherboard. The motherboardsupports Socket 478 processors. Which of the following processors would be compatible with this motherboard?()

    • A、AMD Athlon
    • B、Pentium III
    • C、Atom
    • D、Pentium 4

    正确答案:D

  • 第5题:

    A technician wants to use an existing DHCP server for three additional VLANs. Which of the following features needs to be configured to allow for this addition?()

    • A、DHCP server
    • B、Proxy server
    • C、Repeater
    • D、DHCP relay

    正确答案:D

  • 第6题:

    A user reports that their hard drive has failed and needs to be replaced. Which of the following should the technician do FIRST?()

    • A、Run the hard disk manufacturer’s diagnostic program
    • B、Re-image the drive
    • C、Replace the hard drive and load Windows
    • D、Ask the user diagnostic questions

    正确答案:D

  • 第7题:

    The technician needs to map a network share to the user’s Windows 7 computer from thecommand prompt. Which of the following commands will the technician execute?()

    • A、NET SEND
    • B、NET CONFIG
    • C、NET USE
    • D、NET NAME

    正确答案:C

  • 第8题:

    A technician needs to replace a computer’s hard drive. Which of the following should thetechnician do FIRST?()

    • A、Remove network connections
    • B、Remove the RAM
    • C、Self ground on the computer case
    • D、Disconnect power to PC

    正确答案:D

  • 第9题:

    单选题
    Companycom is trying to communicate with the service processor of the a new p5 590. However, the customer can not access the service processor. What needs to be done to fix this problem?()
    A

    Enable DHCP server on the HMC

    B

    Configure host name and IP address on DNS server

    C

    Manually set the IP address of the service processor

    D

    Connect a RS-232 cable from the HMC to the service processor


    正确答案: D
    解析: 暂无解析

  • 第10题:

    单选题
    A technician is installing a processor upgrade onto an Intel 775 socket motherboard. Which of the following extra power connectors needs to be plugged in for the board to power on?()
    A

    ATX 4-pin

    B

    Molex

    C

    PCIe 6-pin

    D

    PCIe 8-pin


    正确答案: C
    解析: 暂无解析

  • 第11题:

    单选题
    A new processor was recently installed on a one year old motherboard, replacing the original processor. The processor is on the motherboard’s supported processor list and was double checked for proper installation. However, the PC refuses to POST properly and displays no video onscreen. Which of the following is the MOST likely issue?()
    A

    Too much thermal paste was used on the processor and it is preventing boot.

    B

    The motherboard needs to have its PWD jumper removed before the first boot.

    C

    The motherboard needs to have the most recent BIOS version installed.

    D

    The motherboard needs to have a newer CMOS chip installed.


    正确答案: B
    解析: 暂无解析

  • 第12题:

    单选题
    A technician is building a Windows 2008 server and has installed a motherboard, processor, and power supply. Which of the following optical drives should the technician install?()
    A

    Flash Drive

    B

    DVD-RW

    C

    CD-ROM

    D

    SSD


    正确答案: C
    解析: 暂无解析

  • 第13题:

    A technician needs to ping a client’s machine that the technician is working on, to ensure that thenetwork card is functioning correctly. Which of the following IP addresses should be used?()

    • A、10.76.0.1
    • B、127.0.0.1
    • C、192.168.0.1
    • D、255.255.255.0

    正确答案:B

  • 第14题:

    A technician works for a company that has recently been affected by a virus. The virus entered the network by using port 6000. Port 6000 is used by an application located on a server. The technician has been asked to block this port on all servers and computers except for the one server which uses this port. Which of the following should the technician do?()

    • A、Update the antivirus application
    • B、Install critical update security patches
    • C、Adjust the software firewall settings
    • D、Replace the current antivirus program

    正确答案:C

  • 第15题:

    A technician is building a Windows 2008 server and has installed a motherboard, processor, and power supply. Which of the following optical drives should the technician install?()

    • A、Flash Drive
    • B、DVD-RW
    • C、CD-ROM
    • D、SSD

    正确答案:B

  • 第16题:

    A technician wants to compare a new server performance over a period of time. Which of the following should the technician do FIRST?()

    • A、Monitor processor performance logs
    • B、Constantly check the task manager
    • C、Use performance server logs
    • D、Establish a baseline for the server

    正确答案:D

  • 第17题:

    A technician needs to install the first SCSI controller in an application server. The SCSI card is factory-configured with a SCSI ID of 1. Which SCSI ID should the technician configure the card before installation?()

    • A、 0
    • B、 1
    • C、 4
    • D、 7

    正确答案:D

  • 第18题:

    A new processor was recently installed on a one year old motherboard, replacing the original processor. The processor is on the motherboard’s supported processor list and was double checked for proper installation. However, the PC refuses to POST properly and displays no video onscreen. Which of the following is the MOST likely issue?()

    • A、Too much thermal paste was used on the processor and it is preventing boot.
    • B、The motherboard needs to have its PWD jumper removed before the first boot.
    • C、The motherboard needs to have the most recent BIOS version installed.
    • D、The motherboard needs to have a newer CMOS chip installed.

    正确答案:C

  • 第19题:

    A technician has a laptop that is running slow and notices the fan is on high. Which of the following should the technician try FIRST?()

    • A、Clean the heatsink assembly of debris.
    • B、Turn the fan off when the AC adapter is attached.
    • C、Turn the fan to low in the BIOS.
    • D、Replace the processor and fan.

    正确答案:A

  • 第20题:

    Companycom is using shared processor LPARs exclusively, including the Virtual IO Server. The users are complaining about response time. The application LPARs can be heavy processor users. The Virtual IO Server has been measured to be processor constrained. How should the Virtual IO Server's shared processor LPAR be configured?()

    • A、Capped and with a lower share
    • B、Uncapped and with a lower share
    • C、Uncapped and with a higher share
    • D、Capped and with no change in share

    正确答案:C

  • 第21题:

    单选题
    While troubleshooting a network problem,a technician discovers that the current copy of the Cisco IOS is outdated and needs to be updated.Which of the following commands would the technician issue to replace the Cisco router IOS with the newer version?()
    A

    Router#copy tftp flash

    B

    Router(config)#restore flash

    C

    Router(config)#repair flash

    D

    Router#copy flash run

    E

    Router>copy start flash

    F

    Router#copy start flash


    正确答案: D
    解析: 暂无解析

  • 第22题:

    单选题
    A technician wants to compare a new servers performance over a period of time. Which of the following should the technician do FIRST?()
    A

     Monitor processor performance logs

    B

     Constantly check the task manager

    C

     Use performance server logs

    D

     Establish a baseline for the server


    正确答案: B
    解析: 暂无解析

  • 第23题:

    单选题
    A technician purchases a new 120 GB IDE hard disk to use in an old server as a swap drive. After adding the drive to the server, the technician discovers that the operating system does not detect the drive.   After rebooting the server, the technician notices the drive is missing from POST and comes to the conclusion that the BIOS needs to be updated. The technician downloads the latest version of the BIOS update from the manufacturer website.   Which action should the technician take next?()
    A

     backup the BIOS configuration to use later

    B

     install the BIOS update from a command prompt

    C

     create a bootable floppy and copy the BIOS update tools to the floppy

    D

     read the manufacturer’s guidelines and recommendations on installing the update


    正确答案: B
    解析: 暂无解析

  • 第24题:

    单选题
    A technician needs to build a server with at least 16GB of RAM and Windows 2008R2 as the operating system. Which of the following processors should the technician choose?()
    A

    32-bit AMD processor

    B

    32-bit Intel P4 processor

    C

    64-bit Intel processor

    D

    64-bit ARM processor


    正确答案: C
    解析: 暂无解析