niusouti.com

单选题An administrator has a legacy cluster running version 4.5/ES and would like to update to version 5.5.Which of the following is a valid upgrade path?()A 1. Upgrade from 4.5 to 5.12. Upgrade from 5.1 to 5.5B 1. Upgrade from 4.5 to 5.22. Upgrade from 5.2 

题目
单选题
An administrator has a legacy cluster running version 4.5/ES and would like to update to version 5.5.Which of the following is a valid upgrade path?()
A

1. Upgrade from 4.5 to 5.12. Upgrade from 5.1 to 5.5

B

1. Upgrade from 4.5 to 5.22. Upgrade from 5.2 to 5.5

C

1. Upgrade from 4.5 to 5.32. Upgrade from 5.3 to 5.5

D

1. Upgrade from 4.5 to 5.4.12. Upgrade from 5.4.1 to 5.5


相似考题
参考答案和解析
正确答案: A
解析: 暂无解析
更多“单选题An administrator has a legacy cluster running version 4.5/ES and would like to update to version 5.5.Which of the following is a valid upgrade path?()A 1. Upgrade from 4.5 to 5.12. Upgrade from 5.1 to 5.5B 1. Upgrade from 4.5 to 5.22. Upgrade from 5.2 ”相关问题
  • 第1题:

    An administrator is planning an upgrade of a major software package on an application server.The software has been identified, the project approved and the upgrade purchased. Which of the following steps should the administrator take NEXT?()

    • A、Create a test environment for the new version.
    • B、Determine system requirements for the upgrade.
    • C、Request bids from other competing vendors in the product space.
    • D、Document the upgrade.

    正确答案:A

  • 第2题:

    A blade server has been configured to boot from SAN.  After an HBA firmware upgrade the blade was rebooted and cannot find the operating system.  Which of the following should the administrator do NEXT to troubleshoot the issue?()

    • A、Verify all HBA settings.
    • B、Upgrade the blade firmware.
    • C、Upgrade the OS level HBA drivers.
    • D、Set the system to boot from the local disk.

    正确答案:A

  • 第3题:

    In order to upgrade from AIX Version 4.3 to AIX Version 5.2, which of the following actions should be performed?()

    • A、Run smit update_all
    • B、Run smit install_all
    • C、Boot from the installation media
    • D、Run update_all from the mounted CD

    正确答案:C

  • 第4题:

    An administrator will be performing a PowerHA upgrade on a cluster from version 5.3 to version 5.5. Which ofthe following tasks will verify a successful migration?()

    • A、Use the clstat command and verify the cluster is in a stable state
    • B、After each node is upgraded, run a verification and synchronization
    • C、After all nodes are upgraded, run a verification and synchronization
    • D、Take a snapshot of each node and verify the configuration is the same

    正确答案:C

  • 第5题:

    A System p administrator in a manufacturing customer plans to migrate an AIX 5.2 system to a new LPAR on an existing System p using VIOS.  Which of the following must be completed prior to this migration ()

    • A、Upgrade system firmware to latest level
    • B、Upgrade to AIX 5.3
    • C、Upgrade HMC to version 6.1
    • D、Convert rootvg filesystems to JFS2

    正确答案:B

  • 第6题:

    You perform the following activities during the database upgrade from Oracle Database 10g to Oracle Database 11g: 1. Capture plans for a SQL workload into a SQL Tuning Set (STS) before upgrade. 2. Load these plans from the STS into the SQL plan baseline immediately after the upgrade. What is the reason for performing these activities? ()

    • A、to minimize plan regression due to the use of a new optimizer version
    • B、to completely avoid the use of new plans generated by a new optimizer version
    • C、to prevent plan capturing when the SQL statement is executed after the database upgrade
    • D、to keep the plan in the plan history so that it can be used when the older version of the optimizer is used

    正确答案:A

  • 第7题:

    单选题
    An administrator will be performing a PowerHA upgrade on a cluster from version 5.3 to version 5.5. Which ofthe following tasks will verify a successful migration?()
    A

    Use the clstat command and verify the cluster is in a stable state

    B

    After each node is upgraded, run a verification and synchronization

    C

    After all nodes are upgraded, run a verification and synchronization

    D

    Take a snapshot of each node and verify the configuration is the same


    正确答案: D
    解析: 暂无解析

  • 第8题:

    单选题
    You have a computer that runs Windows 7 Home Premium. You need to upgrade the computer to Windows7 Ultimate. You must achieve this goal in the minimum amount of time.  What should you do?()
    A

    Perform a Windows Anytime Upgrade.

    B

    Download and run the Windows 7 Upgrade Advisor.

    C

    Insert the Windows 7 installation media. From the Install Windows dialog box, select the Upgrade option.

    D

    Start the computer from the Windows 7 installation media. From the Install Windows dialog box, selectthe Upgrade option.


    正确答案: A
    解析: 暂无解析

  • 第9题:

    单选题
    Companycom has a system running AIX 5.2 and wants to upgrade to AIX 5.3. What method would provide the quickest recovery if the upgrade failed?()
    A

    Use alt_disk_install

    B

    Backup image to NIM server

    C

    Backup using mksysb to DVD-RAM

    D

    Apply the upgrade and do not commit


    正确答案: C
    解析: 暂无解析

  • 第10题:

    单选题
    In order to upgrade from AIX Version 4.3 to AIX Version 5.2, which of the following actions should be performed?()
    A

    Run smit update_all

    B

    Run smit install_all

    C

    Boot from the installation media

    D

    Run update_all from the mounted CD


    正确答案: C
    解析: 暂无解析

  • 第11题:

    单选题
    A system administrator needs to upgrade the Oracle database from Version 7 to Version 8.  Which of the following scheduling concerns should be considered?()
    A

    Schedule enough down time to backup, upgrade and reboot. 

    B

    Backup, upgrade, then schedule enough down time to reboot the system.

    C

    Backup, then schedule enough down time to upgrade and reboot the system. 

    D

    There are no scheduling concerns because no down time is required.


    正确答案: B
    解析: 暂无解析

  • 第12题:

    单选题
    A company would like to upgrade an old server to a multi-processor box. The server currently has a single 3.0GHz 1Mb cache processor in it with a single empty socket. The only processor that is available from a manufacturer is a 3.0GHz 2Mb cache model. Which of the following is the BEST reason why this upgrade will not work?()
    A

    The socket size does not match

    B

    The cache is from a different manufacturer

    C

    The processors do not match

    D

    Processors cannot be upgraded after server has been deployed


    正确答案: B
    解析: 暂无解析

  • 第13题:

    A company would like to upgrade an old server to a multi-processor box. The server currently has asingle 3.0GHz 1Mb cache processor in it with a single empty socket. The only processor that is available from a manufacturer is a 3.0GHz 2Mb cache model.  Which of the following is the BEST reason why this upgrade will not work?()

    • A、 The socket size does not match
    • B、 The cache is from a different manufacturer
    • C、 The processors do not match
    • D、 Processors cannot be upgraded after server has been deployed

    正确答案:C

  • 第14题:

    A system must be upgraded from AIX 5.1 to 5.2.  Which of the following scheduling processes should be performed? ()

    • A、 Schedule enough down time to backup, upgrade and reboot. 
    • B、 Backup, upgrade, then schedule enough down time to reboot the system. 
    • C、 Backup, then schedule enough down time to upgrade and reboot the system. 
    • D、 No scheduling processes are necessary because no down time is required.

    正确答案:A

  • 第15题:

    A customer is having problems after an AIX version upgrade from 5.2 to 5.3.  Which of the following should the pSeries technical specialist recommend that the customer call?()

    • A、IBM Techline
    • B、IBM Supportline
    • C、IBM Software Distribution
    • D、IBM Hardware Support

    正确答案:B

  • 第16题:

    A system administrator needs to upgrade the Oracle database from Version 7 to Version 8.  Which of the following scheduling concerns should be considered?()

    • A、Schedule enough down time to backup, upgrade and reboot. 
    • B、Backup, upgrade, then schedule enough down time to reboot the system.
    • C、Backup, then schedule enough down time to upgrade and reboot the system. 
    • D、There are no scheduling concerns because no down time is required.

    正确答案:A

  • 第17题:

    A System p administrator needs to upgrade a system from AIX 5.2 to AIX 5.3.  Which of the following installation methods would minimize downtime()

    • A、Migration installation
    • B、Partition Mobility
    • C、alt_disk_install
    • D、update_all smit fastpath and reboot during the next scheduled outage

    正确答案:C

  • 第18题:

    单选题
    A System p administrator needs to upgrade a system from AIX 5.2 to AIX 5.3.  Which of the following installation methods would minimize downtime()
    A

    Migration installation

    B

    Partition Mobility

    C

    alt_disk_install

    D

    update_all smit fastpath and reboot during the next scheduled outage


    正确答案: A
    解析: 暂无解析

  • 第19题:

    单选题
    A customer is having problems after an AIX version upgrade from 5.2 to 5.3.  Which of the following should the pSeries technical specialist recommend that the customer call?()
    A

    IBM Techline

    B

    IBM Supportline

    C

    IBM Software Distribution

    D

    IBM Hardware Support


    正确答案: D
    解析: 暂无解析

  • 第20题:

    单选题
    You perform the following activities during the database upgrade from Oracle Database 10g to Oracle Database 11g: 1. Capture plans for a SQL workload into a SQL Tuning Set (STS) before upgrade. 2. Load these plans from the STS into the SQL plan baseline immediately after the upgrade. What is the reason for performing these activities? ()
    A

    to minimize plan regression due to the use of a new optimizer version

    B

    to completely avoid the use of new plans generated by a new optimizer version

    C

    to prevent plan capturing when the SQL statement is executed after the database upgrade

    D

    to keep the plan in the plan history so that it can be used when the older version of the optimizer is used


    正确答案: C
    解析: 暂无解析

  • 第21题:

    单选题
    An administrator has a legacy cluster running version 4.5/ES and would like to update to version 5.5.Which of the following is a valid upgrade path?()
    A

    1. Upgrade from 4.5 to 5.12. Upgrade from 5.1 to 5.5

    B

    1. Upgrade from 4.5 to 5.22. Upgrade from 5.2 to 5.5

    C

    1. Upgrade from 4.5 to 5.32. Upgrade from 5.3 to 5.5

    D

    1. Upgrade from 4.5 to 5.4.12. Upgrade from 5.4.1 to 5.5


    正确答案: A
    解析: 暂无解析

  • 第22题:

    单选题
    Which of the following steps does a customer use to upgrade the firmware on the AMM to the latest level?()
    A

    Open a Web browser and log on to the IMM; in the navigation frame, click IMM Firmware Update under IMM Control; click Browse; select the .exe file; click the Upgrade/Update button 

    B

    TFTP to the AMM; from the Main Menu, select Update; browse to the downloaded .exe file 

    C

    Telnet to AMM; from the Main Menu, select Update; browse to the downloaded .pkt file 

    D

    Open a Web browser and log on to the AMM; in the navigation frame, click AMM Firmware Update under AMM Control; click Browse; select the .pkt file; click the Upgrade/Update button


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    An administrator is planning an upgrade of a major software package on an application server.The software has been identified, the project approved and the upgrade purchased. Which of the following steps should the administrator take NEXT?()
    A

    Create a test environment for the new version.

    B

    Determine system requirements for the upgrade.

    C

    Request bids from other competing vendors in the product space.

    D

    Document the upgrade.


    正确答案: B
    解析: 暂无解析

  • 第24题:

    单选题
    A system must be upgraded from AIX 5.1 to 5.2.  Which of the following scheduling processes should be performed? ()
    A

     Schedule enough down time to backup, upgrade and reboot. 

    B

     Backup, upgrade, then schedule enough down time to reboot the system. 

    C

     Backup, then schedule enough down time to upgrade and reboot the system. 

    D

     No scheduling processes are necessary because no down time is required.


    正确答案: A
    解析: 暂无解析