单选题Industry standard single 1U, 2U or 3U/4U Intel, AMD, or POWER servers respectively require 600 to 1300 Watt power supplies.  What size power supplies is used by the IBM BladeCenter H to power up to fourteen servers, media components, and network switch

题目
单选题
Industry standard single 1U, 2U or 3U/4U Intel, AMD, or POWER servers respectively require 600 to 1300 Watt power supplies.  What size power supplies is used by the IBM BladeCenter H to power up to fourteen servers, media components, and network switch modules? ()
A

1400 Watt

B

3200 Watt

C

2900 Watt

D

2000 Watt


相似考题
更多“单选题Industry standard single 1U, 2U or 3U/4U Intel, AMD, or POWER servers respectively require 600 to 1300 Watt power supplies.  What size power supplies is used by the IBM BladeCenter H to power up to fourteen servers, media components, and network switch”相关问题
  • 第1题:

    An administrator has a single 14U rack.  The administrator needs to install fifteen servers; rack-mounted redundant uninterruptible power supplies (UPSs), a network switch, and a KVM.  Which of the following server types would be BEST suited for this scenario?()

    • A、Blade servers
    • B、Rackmount servers
    • C、Tower servers
    • D、Web servers

    正确答案:A

  • 第2题:

    Which feature of the IBM p5 servers enables customers to be confident that data within two distinct partitions on the server will be isolated?()

    • A、POWER Hypervisor
    • B、Virtual LAN
    • C、POWER5 processor
    • D、Redundant Power and Cooling

    正确答案:A

  • 第3题:

    What IBM resource will give you details concerning the total power requirements of a server environment?()

    • A、IBM System x and BladeCenter Power Configurator Tool
    • B、IBM Standalone Solutions Configuration Tool (SSCT)
    • C、IBM xREF Sheets
    • D、IBM ServerProven

    正确答案:A

  • 第4题:

    An IT director is eager to adopt POWER7 servers because of their relative performance ratings and energy efficiency, but is concerned about migrating applications which require AIX 5.3. Which of the following will address his concern?()

    • A、POWER7 servers running AIX 5.3 operate in POWER5+ mode.
    • B、POWER7 servers running AIX 5.3 operate in POWER6 and POWER6+ mode.
    • C、POWER7 servers running AIX 5.3 operate in POWER5 and POWER6 modes.
    • D、POWER7 servers running AIX 5.3 operate in POWER6 and POWER7 modes.

    正确答案:B

  • 第5题:

    A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()

    • A、Purchase a second HMC and use this to manage the new servers.
    • B、Connect all of the new servers to the existing private HMC network.
    • C、Configure a second private network on their existing HMC for the new servers.
    • D、Connect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.

    正确答案:B

  • 第6题:

    What is an advantage of using an HMC rather than IVM for system management?()

    • A、Support for a single VIO Server environment
    • B、Adapters can be dedicated or virtual for each LPAR environment
    • C、Interfaces with Systems Director to manage the Power Systems servers
    • D、Supports multiple Power Systems servers from a single point of control

    正确答案:D

  • 第7题:

    A customer has a BladeCenter E installed and plans to migrate their current Blades to the BladeCenter H.  What options will migrate from the BladeCenter E to the BladeCenter H chassis? ()

    • A、SAN Switch modules
    • B、Blowers
    • C、Power supplies
    • D、Battery backup units

    正确答案:A

  • 第8题:

    单选题
    Which of the following is the BEST case scenario for power fault tolerance within a server?()
    A

    Redundant power supplies with one power supply connected and one power supply as a hot spare.

    B

    Redundant power supplies with each connected to a separate power circuit.

    C

    Redundant power supplies connected via a Y-cable.

    D

    Redundant power supplies with each connected to the same power circuit.


    正确答案: A
    解析: 暂无解析

  • 第9题:

    单选题
    A customer has requested five rack mounted servers, and a rack. They want redundant power connections. Which of the following is required to meet these requirements?()
    A

    Redundant power supplies on the servers

    B

    Redundant PDUs in the rack

    C

    edundant power supplies in the servers and redundant PDUs in the rack

    D

    Redundant power supplies in the servers, redundant PDUs in the rack, and Active Energy Manager (AEM)


    正确答案: C
    解析: 暂无解析

  • 第10题:

    单选题
    Effective systems management for all processor types that is easy to implement and use is needed.  What processors are supported by the IBM BladeCenter?()
    A

    Intel/AMD/Power/Cell

    B

    Intel/Motorola/Zilog

    C

    Opteron/Dual Core/Quad Core

    D

    Celeron/Pentium/Xeon


    正确答案: D
    解析: 暂无解析

  • 第11题:

    单选题
    An administrator has a single 14U rack.  The administrator needs to install fifteen servers; rack-mounted redundant uninterruptible power supplies (UPSs), a network switch, and a KVM.  Which of the following server types would be BEST suited for this scenario?()
    A

    Blade servers

    B

    Rackmount servers

    C

    Tower servers

    D

    Web servers


    正确答案: B
    解析: 暂无解析

  • 第12题:

    单选题
    What IBM resource will give you details concerning the total power requirements of a server environment?()
    A

    IBM System x and BladeCenter Power Configurator Tool

    B

    IBM Standalone Solutions Configuration Tool (SSCT)

    C

    IBM xREF Sheets

    D

    IBM ServerProven


    正确答案: A
    解析: 暂无解析

  • 第13题:

    Which of the following is the BEST case scenario for power fault tolerance within a server?()

    • A、 Redundant power supplies with one power supply connected and one power supply as a hot spare.
    • B、 Redundant power supplies with each connected to a separate power circuit.
    • C、 Redundant power supplies connected via a Y-cable.
    • D、 Redundant power supplies with each connected to the same power circuit.

    正确答案:B

  • 第14题:

    A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information,  what additional items does the customer need to purchase? ()

    • A、An IBM BladeCenter H chassis for the JS22 Blade servers
    • B、A concurrent KVM daughter card
    • C、A pair of IBM BladeCenter Power Supplies
    • D、A second Management Module

    正确答案:C

  • 第15题:

    Effective systems management for all processor types that is easy to implement and use is needed.  What processors are supported by the IBM BladeCenter?()

    • A、Intel/AMD/Power/Cell
    • B、Intel/Motorola/Zilog
    • C、Opteron/Dual Core/Quad Core
    • D、Celeron/Pentium/Xeon

    正确答案:A

  • 第16题:

    A customer has requested five rack mounted servers, and a rack. They want redundant power connections. Which of the following is required to meet these requirements?()

    • A、Redundant power supplies on the servers
    • B、Redundant PDUs in the rack
    • C、edundant power supplies in the servers and redundant PDUs in the rack
    • D、Redundant power supplies in the servers, redundant PDUs in the rack, and Active Energy Manager (AEM)

    正确答案:C

  • 第17题:

    A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()

    • A、PowerVM Standard Edition
    • B、VMControl Standard Edition
    • C、Hardware Management Console
    • D、IBM Systems Director Standard Edition

    正确答案:D

  • 第18题:

    Industry standard single 1U, 2U or 3U/4U Intel, AMD, or POWER servers respectively require 600 to 1300 Watt power supplies.  What size power supplies is used by the IBM BladeCenter H to power up to fourteen servers, media components, and network switch modules? ()

    • A、1400 Watt
    • B、3200 Watt
    • C、2900 Watt
    • D、2000 Watt

    正确答案:C

  • 第19题:

    单选题
    A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information,  what additional items does the customer need to purchase? ()
    A

    An IBM BladeCenter H chassis for the JS22 Blade servers

    B

    A concurrent KVM daughter card

    C

    A pair of IBM BladeCenter Power Supplies

    D

    A second Management Module


    正确答案: C
    解析: 暂无解析

  • 第20题:

    单选题
    A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()
    A

    Purchase a second HMC and use this to manage the new servers.

    B

    Connect all of the new servers to the existing private HMC network.

    C

    Configure a second private network on their existing HMC for the new servers.

    D

    Connect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.


    正确答案: B
    解析: 暂无解析

  • 第21题:

    单选题
    Which of the following is the BEST case scenario for power fault tolerance within a server?()
    A

     Redundant power supplies with one power supply connected and one power supply as a hot spare.

    B

     Redundant power supplies with each connected to a separate power circuit.

    C

     Redundant power supplies connected via a Y-cable.

    D

     Redundant power supplies with each connected to the same power circuit.


    正确答案: A
    解析: 暂无解析

  • 第22题:

    单选题
    An IT director is eager to adopt POWER7 servers because of their relative performance ratings and energy efficiency, but is concerned about migrating applications which require AIX 5.3. Which of the following will address his concern?()
    A

    POWER7 servers running AIX 5.3 operate in POWER5+ mode.

    B

    POWER7 servers running AIX 5.3 operate in POWER6 and POWER6+ mode.

    C

    POWER7 servers running AIX 5.3 operate in POWER5 and POWER6 modes.

    D

    POWER7 servers running AIX 5.3 operate in POWER6 and POWER7 modes.


    正确答案: B
    解析: 暂无解析

  • 第23题:

    单选题
    What is an advantage of using an HMC rather than IVM for system management?()
    A

    Support for a single VIO Server environment

    B

    Adapters can be dedicated or virtual for each LPAR environment

    C

    Interfaces with Systems Director to manage the Power Systems servers

    D

    Supports multiple Power Systems servers from a single point of control


    正确答案: C
    解析: 暂无解析