customer must reconfigure aniSCSI port for mirroring
customer must set up a fabric and dedicate port 4 for disaster recovery
customer must set up a fabric and dedicate port 2 for disaster recovery
replication is not possible with the DS5020, they must consider the DS5300
第1题:
A customer is using Metro Mirror to mirror the company inventory database from an IBM System Storage DS8700 at their headquarters to a DS8300 at a remote site. Due to bandwidth concerns they are planning to change the mirroring mode to Global Mirroring. They have asked for assistance. What must be done to help the customer make the change?()
第2题:
A customer asks for the thermal load (BTU/hr) to determine whether their existing cooling system will support the IBM System Storage DS8000. Where can the sales representative find this information()
第3题:
A customer has two data centers, 500 kilometers apart. The customer requests a proposal for new storage subsystems and a disaster recovery solution that provides consistent data in the event of a disaster at the local site. Which IBM System Storage DS8000 solution should the storage specialist propose to the client()
第4题:
An IBM Business Partner sells an IBM System Storage DS8700 to a customer. Who is responsible for the installation and set up of the storage server()
第5题:
A local manufacturing customer is looking for a highly scalable, easy to use disk storage system tosupport a new application they are bringing into the data center. The customer has an initialrequirement for 40 TB of high performance storage but they expect to more than double thecapacity needed once the application goes into full production. What IBM solution would be themost cost effective while meeting their initial requirements?()
第6题:
An online retailer is considering deploying a database application on xSeries and Windows to serve their Web-based transactions. The database will need about 4TB of usable storage. Downtime costs the customer tens of thousands of dollars per minute, so system availability will be of highest priority. The customer needs to acquire the system within a certain budget but will pay for things that provide higher system availability. Which of the following will be the most appropriate solution?()
第7题:
A dual pathed switched DS4000 Solution with Clustering, Remote replication, Redundant NICs, and Fibre attached backup
A single path Direct attach DS4000 solution implemented with Clustering and SAN Based Backup combined with IBM Director for PFA management
A dual pathed Direct Attach fibre solution, along with dual NICs and memory mirroring
An iSCSI solution with dual NIC’s with the Flashcopy option enabled on the DS300
第8题:
IBM System Storage DS8000: Host Systems Attachment Guide
DS8000 Interoperability Matrix
IBM System Storage DS8000: Introduction and Planning Guide
IBM System Storage Solution Handbook
第9题:
install FlashCopy on the DS8100
install SAN Volume Controllers with FlashCopy
install SAN Volume Controllers with Metro Mirror
install Global Mirror on the DS8100 and Enhanced Remote Mirror on the DS5100
第10题:
Metro/Global Mirror
Metro Mirror
Global Copy
Global Mirror
第11题:
compatibility of copy functions
difference in capacities in the two systems
cache size discrepancies between the two systems
the necessity of using two storage management products
第12题:
disaster recovery strategy
the number of IOPS required
the capacity of each hard drive
how the database will be backed up
第13题:
An IBM Business Partner suggests an IBM System Storage DS8000 to a customer with a SAN that is now configured with an EMC Symmetrix subsystem disk. The customer wants to determine if new HBAs and software upgrades are needed on the servers if the EMC storage is replaced by the DS8000 What document must be carefully read to help address the customer’s concerns()
第14题:
The customer is planning a new IBM System Storage DS5020 using iSCSI and direct attachedfibre channel connectivity in a redundant configuration. The customer is planning to set up adisaster recovery solution in the near future by using Enhanced Remote Mirroring. Which of thefollowing considerations are critical for this customer?()
第15题:
A customer plans to order several new pSeries systems and is concerned that the additional heat load may overwhelm the current air-handling system. How might the pSeries technical specialist aid the customer in addressing their concern?()
第16题:
A customer has an IBM System Storage DS8700 at their primary site and an XIV system at their recovery site, which is 9.5 kilometers away. They want to replicate data for disaster recovery backup. Which factor is a primary consideration when proposing a solution for this customer()
第17题:
A customer with an IBM Power System running AIX is using an IBM System Storage DS8100 inLocation A, and an IBM System Storage DS5100 in Location B. The distance between Location Aand Location B is 25 kilometers. The customer wants a redundant copy of the data inLocation Bfor disaster recovery. Which of the following solutions will best satisfy this requirement?()
第18题:
customer must reconfigure aniSCSI port for mirroring
customer must set up a fabric and dedicate port 4 for disaster recovery
customer must set up a fabric and dedicate port 2 for disaster recovery
replication is not possible with the DS5020, they must consider the DS5300
第19题:
IBM XIV Storage System
IBM System Storage DS8700
IBM System Storage N6070
IBM System Storage N6210
第20题:
purchasing customer
IBM Installation Readiness Team
IBM Customer Engineer
IBM Business Partner
第21题:
DS8700 with Easy Tier
XIV Storage System with SVC
XIV Storage System with CoD
DS5020 with Enhanced Remote Mirroring
第22题:
operator training
cache size of the two clusters
fibre bandwidth capability between the sites
number of stacked tape drives attached to each cluster
第23题:
Global Mirror for zSeries
Metro Mirror
Global Copy
Metro/Global Mirror
第24题:
reboot the secondary system
rezone the Storage Area Network switches
break and re-establish the mirror relationship
increase the buffer credits in the HBAs to reflect the new mirror relationship