niusouti.com

单选题A customer is conducting a proof of concept with an IBM System Storage DS5100 attached toLinux hosts. The DS5100 is running in a degraded state and the "collect all support data"operation does not complete correctly. What alternate data should be colle

题目
单选题
A customer is conducting a proof of concept with an IBM System Storage DS5100 attached toLinux hosts. The DS5100 is running in a degraded state and the "collect all support data"operation does not complete correctly. What alternate data should be collected and forwarded toIBM support?()
A

Capture State information, Major Event Log (MEL), I/Ometer

B

Storage Profile, Capture State information, Performance Monitor

C

Storage Profile, Major Event Log (MEL), Capture State information

D

Capture State Information, Major Event Log (MEL), Performance Monitor


相似考题
更多“单选题A customer is conducting a proof of concept with an IBM System Storage DS5100 attached toLinux hosts. The DS5100 is running in a degraded state and the "collect all support data"operation does not complete correctly. What alternate data should be colle”相关问题
  • 第1题:

    A customer wants to collect performance data from a newly installed IBM System Storage DS8700 to determine if the system meets expected benchmarks using their application test data.  Which tool best gathers the performance data()

    • A、IBM DS Storage Manager
    • B、Tivoli Storage Resource Manager
    • C、Tivoli Storage Productivity Center for Disk
    • D、Tivoli Storage Productivity Center for Data

    正确答案:C

  • 第2题:

    A customer has an IBM System Storage Enterprise Storage Server and several EMC CX3 systems installed in a data center, attached to IBM System p servers. As a step toward data consolidation, they intend to put all data on a new DS8700.  What would be the most important data migration factors to consider()

    • A、sector size and the amount of production data
    • B、existing RAID levels and the disk drive speed
    • C、sector size and existing RAID levels
    • D、amount of production data and the disk drive speed

    正确答案:D

  • 第3题:

    An IBM XIV system with nine modules and 2 TB disks is being proposed to a customer who needs to increase disk capacity in the data center. The customer is concerned about data growth andcost after the initial purchase. Which of the following factors of the solution should be stressed to the customer to address data growth?()

    • A、the XIV system can be scaled by the addition of modules
    • B、XIV offers thin provisioning for all available host operating systems
    • C、reduced operating costs will pay for another XIV system in less than two years
    • D、the management GUI allows the administrator tovirtualize the entire storage system quickly

    正确答案:A

  • 第4题:

    While installing a new IBM System Storage DS5100 into a customer’s data center, it is discoveredthat the customer does not have enough available Fibre Channel ports on their switches. Which ofthe following should have been used to avoid this situation?()

    • A、IBM DS5000 Cabling Tool
    • B、IBM e-Configurator Tool
    • C、IBM Pre-Installation TDA Checklist
    • D、IBM Standalone Solutions Configuration Tool

    正确答案:C

  • 第5题:

    A customer is conducting a proof of concept with an IBM System Storage DS5100 attached toLinux hosts. The DS5100 is running in a degraded state and the "collect all support data"operation does not complete correctly. What alternate data should be collected and forwarded toIBM support?()

    • A、Capture State information, Major Event Log (MEL), I/Ometer
    • B、Storage Profile, Capture State information, Performance Monitor
    • C、Storage Profile, Major Event Log (MEL), Capture State information
    • D、Capture State Information, Major Event Log (MEL), Performance Monitor

    正确答案:C

  • 第6题:

    The customer has an older storage array and is looking to migrate data that currently exists onover 100 73 GB FC drives to a new IBM System Storage DS5020. The customer states that theyhave only 3 TB of data and wants to consolidate on to fewer higher capacity drives. There are sixapplication servers running multiple applications and operating systems utilizing the storagesystem. What would be the next step to accurately identify the new storage configuration?()

    • A、initiate a Disk Magic study
    • B、initiate a Capacity Magic study
    • C、runiometer on the current environment
    • D、utilize the IBM Disk capacity planner toolkit

    正确答案:A

  • 第7题:

    单选题
    An IBM XIV system with nine modules and 2 TB disks is being proposed to a customer who needs to increase disk capacity in the data center. The customer is concerned about data growth andcost after the initial purchase. Which of the following factors of the solution should be stressed to the customer to address data growth?()
    A

    the XIV system can be scaled by the addition of modules

    B

    XIV offers thin provisioning for all available host operating systems

    C

    reduced operating costs will pay for another XIV system in less than two years

    D

    the management GUI allows the administrator tovirtualize the entire storage system quickly


    正确答案: A
    解析: 暂无解析

  • 第8题:

    单选题
    A customer has an IBM System Storage Enterprise Storage Server and several EMC CX3 systems installed in a data center, attached to IBM System p servers. As a step toward data consolidation, they intend to put all data on a new DS8700.  What would be the most important data migration factors to consider()
    A

    sector size and the amount of production data

    B

    existing RAID levels and the disk drive speed

    C

    sector size and existing RAID levels

    D

    amount of production data and the disk drive speed


    正确答案: D
    解析: 暂无解析

  • 第9题:

    单选题
    A customer is sharing an IBM System Storage DS8300 for both IBM System z and Systemapplications. They need to provide data recovery capability between the primary and the remotedata center, which is 60 kilometers away. Which copy service keeps all data synchronized at theremote data center?()
    A

    Concurrent Copy

    B

    FlashCopy

    C

    Metro Mirror

    D

    Global Mirror


    正确答案: B
    解析: 暂无解析

  • 第10题:

    单选题
    A customer with an IBM Power System running AIX is using an IBM System Storage DS8100 inLocation A, and an IBM System Storage DS5100 in Location B. The distance between Location Aand Location B is 25 kilometers. The customer wants a redundant copy of the data inLocation Bfor disaster recovery. Which of the following solutions will best satisfy this requirement?()
    A

    install FlashCopy on the DS8100 

    B

    install SAN Volume Controllers with FlashCopy

    C

    install SAN Volume Controllers with Metro Mirror 

    D

    install Global Mirror on the DS8100 and Enhanced Remote Mirror on the DS5100 


    正确答案: D
    解析: 暂无解析

  • 第11题:

    单选题
    A customer has two data centers, 500 kilometers apart. The customer requests a proposal for new storage subsystems and a disaster recovery solution that provides consistent data in the event of a disaster at the local site.  Which IBM System Storage DS8000 solution should the storage  specialist propose to the client()
    A

    Metro/Global Mirror

    B

    Metro Mirror

    C

    Global Copy

    D

    Global Mirror


    正确答案: D
    解析: 暂无解析

  • 第12题:

    单选题
    The customer has an older storage array and is looking to migrate data that currently exists onover 100 73 GB FC drives to a new IBM System Storage DS5020. The customer states that theyhave only 3 TB of data and wants to consolidate on to fewer higher capacity drives. There are sixapplication servers running multiple applications and operating systems utilizing the storagesystem. What would be the next step to accurately identify the new storage configuration?()
    A

    initiate a Disk Magic study

    B

    initiate a Capacity Magic study

    C

    runiometer on the current environment

    D

    utilize the IBM Disk capacity planner toolkit


    正确答案: C
    解析: 暂无解析

  • 第13题:

    A customer is sharing an IBM System Storage DS8300 for both IBM System z and Systemapplications. They need to provide data recovery capability between the primary and the remotedata center, which is 60 kilometers away. Which copy service keeps all data synchronized at theremote data center?()

    • A、Concurrent Copy
    • B、FlashCopy
    • C、Metro Mirror
    • D、Global Mirror

    正确答案:C

  • 第14题:

    A customer has 4 EXP5000 expansion enclosures attached to an IBM System Storage DS5100 intheir production environment, and the same configuration in their disaster recovery environment.The customer removes the drives from the production environment and ships them to the disasterrecovery facility. What IBM technology feature gives the customer the ability to migrate drives fromone DS5000 to another DS5000 with data intact?()

    • A、SnapCopy
    • B、DACstore
    • C、FlexClone
    • D、RAID Protect

    正确答案:B

  • 第15题:

    Which of the following is the lowest cost enterprise class IBM Storage System that can support anExchange 2010 solution?()

    • A、DS5100 
    • B、Storwize V7000 
    • C、DS8700 
    • D、XIV system

    正确答案:D

  • 第16题:

    A large shipping company that is standardized on Fibre Channel storage has just acquired a regional shipping company that is using an IBM XIV system. The large company would like to integrate the XIV system into the environment and manage all data through a single management interface. Which product should be suggested so that all data can be managed?()

    • A、IBM DS8700
    • B、IBM XIV GUI
    • C、IBM System Storage N7600
    • D、IBM SAN Volume Controller (SVC)

    正确答案:D

  • 第17题:

    A customer with an IBM Power System running AIX is using an IBM System Storage DS8100 inLocation A, and an IBM System Storage DS5100 in Location B. The distance between Location Aand Location B is 25 kilometers. The customer wants a redundant copy of the data inLocation Bfor disaster recovery. Which of the following solutions will best satisfy this requirement?()

    • A、install FlashCopy on the DS8100 
    • B、install SAN Volume Controllers with FlashCopy
    • C、install SAN Volume Controllers with Metro Mirror 
    • D、install Global Mirror on the DS8100 and Enhanced Remote Mirror on the DS5100 

    正确答案:C

  • 第18题:

    A customer with both IBM servers and storage asked their storage specialist to present updatedinformation on the IBM storage portfolio. The specialist suspects a competitor is actively selling inthis account. Which of the following questions, if asked by the customer, would most likely indicatecompetitive activity?()

    • A、Does the DS8700 offer virtualized arrays? 
    • B、How can the IBM SAN Volume Controller work in our environment? 
    • C、What is the raw disk capacity of the IBM System Storage DS5300? 
    • D、What are the support options available on the IBM System Storage DS5020?

    正确答案:A

  • 第19题:

    单选题
    A customer wants to collect performance data from a newly installed IBM System Storage DS8300 to determine if the system meets expected benchmarks using their application test data.  Which tool best gathers the performance data()
    A

    IBM DS Storage Manager

    B

    IBM Tivoli Storage Resource Manager

    C

    IBM TotalStorage Productivity Center for Disk

    D

    IBM TotalStorage Productivity Center for Data


    正确答案: A
    解析: 暂无解析

  • 第20题:

    单选题
    A customer has 4 EXP5000 expansion enclosures attached to an IBM System Storage DS5100 intheir production environment, and the same configuration in their disaster recovery environment.The customer removes the drives from the production environment and ships them to the disasterrecovery facility. What IBM technology feature gives the customer the ability to migrate drives fromone DS5000 to another DS5000 with data intact?()
    A

    SnapCopy

    B

    DACstore

    C

    FlexClone

    D

    RAID Protect


    正确答案: B
    解析: 暂无解析

  • 第21题:

    单选题
    While installing a new IBM System Storage DS5100 into a customer’s data center, it is discoveredthat the customer does not have enough available Fibre Channel ports on their switches. Which ofthe following should have been used to avoid this situation?()
    A

    IBM DS5000 Cabling Tool

    B

    IBM e-Configurator Tool

    C

    IBM Pre-Installation TDA Checklist

    D

    IBM Standalone Solutions Configuration Tool


    正确答案: D
    解析: 暂无解析

  • 第22题:

    单选题
    A customer has been receiving warning alerts on their storage units. All data is protected nightlyby a backup and has been tested without any issues. What should the customer do prior tocontacting IBM Support?()
    A

    collect all support data

    B

    implement a current backup

    C

    update all firmware levels

    D

    shut down the storage system


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    A customer wants to collect performance data from a newly installed IBM System Storage DS8700 to determine if the system meets expected benchmarks using their application test data.  Which tool best gathers the performance data()
    A

    IBM DS Storage Manager

    B

    Tivoli Storage Resource Manager

    C

    Tivoli Storage Productivity Center for Disk

    D

    Tivoli Storage Productivity Center for Data


    正确答案: C
    解析: 暂无解析