Initiate LPAR fallover to backup systems.
Use Live Partition Mobility to move the LPARs to other systems.
Use Live Application Mobility to move critical applications to alternate systems.
Back up all LPARS to a NIM server and restore them to other LPARs on other systems.
第1题:
A customer is interested in reducing energy consumption and infrastructure consolidation for space. The customer needs a maximum of 14 servers in 7U rack. Which IBM BladeCenter Chassis should be recommended? ()
第2题:
While installing the equipment for a new two-node cluster, it is discovered that the disk subsystem Rack has one connection to the power mains. The explanation given was that the disks are to be mirrored between the two disk drawers in the rack and that a failure in either of the disk drawers would simply result in half of the disk being lost. What can be done to avoid a single point of failure?()
第3题:
A customer is looking for a new file and print server and is considering a 2-socket Intel server with redundant power and hard disk that must fit in the current server rack. With 2U available in the rack, the customer is looking for the best price performance ratio. Which IBM server will fit the best for this customer?()
第4题:
Companycom wants the application server LPAR to communicate with the database LPAR on a p5 590 without using network adapters. What does the customer need to install?()
第5题:
A customer purchased a new IBM xSeries x445. They already have a non-IBM industry standard rack with 14U of open space that is being considered to house the new server. The rack houses an existing UPS unit for the entire rack. Which of the following questions is most important to ensure that the power in the datacenter environment is ready for the initial install?()
第6题:
An IT director needs to deploy 3 partitions, each using dedicated internal boot disk. Which system will support the customer requirement using the least amount of rack space?()
第7题:
Two of DPI C13 Enterprise PDU 39Y8941
One of DPI Universal Rack PDU 39Y8951
One of DPI C13 Enterprise PDU 39Y8941
Two of DPI C19 Enterprise PDU 39Y8948
第8题:
Voltage
Frequency
Power Source Loading (max)
Power Source Loading (typical)
第9题:
Customize HACMP to overcome quorum issues.
Add a second PDU to separate the power connections.
Use RAID5 when implementing two IO racks in a HACMP environment.
Add another shared disk to each volume group to avoid quorum issues during fallover.
第10题:
Blade servers
Rackmount servers
Tower servers
Web servers
第11题:
1.75 inches(4.45 cm)
2.5 inches(6.35 cm)
3.5 inches(8.89 cm)
4.25 inches(10.8 cm)
第12题:
Use AIX 5.3 which supports micro-partitioning for both the test and training LPARS
Use DLPAR to move resources from the test LPAR to training when training is active
Install Partition Load Manager to share resources between the test and training environments
Install Advanced Power Virtualization and then use micro-partitioning for both the test and training LPARs
第13题:
A customer needs to install a rack with six of the x3650 M3 servers with the standard line cords. Each server has redundant power supplies. Which of the following meets this requirement?()
第14题:
A customer wishes to replace 12 older small UNIX systems. They are running out of floor space in their data center and any solution must take this into consideration. Assuming that the applications are supported on all AIX versions, which of the following would best meet the customer’s requirements?()
第15题:
A customer has requested five rack mounted servers, and a rack. They want redundant power connections. Which of the following is required to meet these requirements?()
第16题:
A customer has several small AIX applications that are expected to grow over the next several years. The biggest challenge facing the customer is determining the growth rate of the applications and the I/T requirements needed to support the growth. They are also concerned about the under-utilization of their IT resources. What should the pSeries technical specialist recommend to address this challenge?()
第17题:
An AIX 5.3 customer has a Power 780 in a 2-meter (T42) rack. This rack needs to be moved six inches (15cm) to allow under-floor access. What preparation for moving the rack will result in the least disruption to end-users?()
第18题:
An administrator needs to install a 2U server into a rack. Which of the following shows how much space, in height, needs to be available for the server to fit in the rack?()
第19题:
Redundant power supplies on the servers
Redundant PDUs in the rack
edundant power supplies in the servers and redundant PDUs in the rack
Redundant power supplies in the servers, redundant PDUs in the rack, and Active Energy Manager (AEM)
第20题:
A p650 running AIX v5.3
A p5-550 running AIX v5.3
A p5-570 running Advanced POWER Virtualization
Multiple rack-mounted p615s running dynamic LPAR
第21题:
BladeCenter E
BladeCenter H
BladeCenter T
BladeCenter HT
第22题:
x3200
x3455
x3550
x3650
第23题:
Install a p615 per application.
Install a p650 with AIX 5.2 and dynamic LPAR and CUoD.
Install the appropriate solution once the requirements are understood.
Install a POWER5 system with AIX 5.3, Advanced POWER Virtualization, and CoD.