niusouti.com

单选题An AIX 5.3 customer has a Power 780 in a 2-meter (T42) rack. This rack needs to be moved six inches (15cm) to allow under-floor access.   What preparation for moving the rack will result in the least disruption to end-users?()A Initiate LPAR fallover t

题目
单选题
An AIX 5.3 customer has a Power 780 in a 2-meter (T42) rack. This rack needs to be moved six inches (15cm) to allow under-floor access.   What preparation for moving the rack will result in the least disruption to end-users?()
A

Initiate LPAR fallover to backup systems.

B

Use Live Partition Mobility to move the LPARs to other systems.

C

Use Live Application Mobility to move critical applications to alternate systems.

D

Back up all LPARS to a NIM server and restore them to other LPARs on other systems.


相似考题
更多“单选题An AIX 5.3 customer has a Power 780 in a 2-meter (T42) rack. This rack needs to be moved six inches (15cm) to allow under-floor access.   What preparation for moving the rack will result in the least disruption to end-users?()A Initiate LPAR fallover t”相关问题
  • 第1题:

    A customer is interested in reducing energy consumption and infrastructure consolidation for space. The customer needs a maximum of 14 servers in 7U rack.  Which IBM BladeCenter Chassis should be recommended? ()

    • A、BladeCenter E
    • B、BladeCenter H
    • C、BladeCenter T
    • D、BladeCenter HT

    正确答案:A

  • 第2题:

    While installing the equipment for a new two-node cluster, it is discovered that the disk subsystem  Rack has one connection to the power mains. The explanation given was that the disks are to be mirrored between the two disk drawers in the rack and that a failure in either of the disk drawers would simply result in half of the disk being lost.  What can be done to avoid a single point of failure?()   

    • A、 Customize HACMP to overcome quorum issues.
    • B、 Add a second PDU to separate the power connections.
    • C、 Use RAID5 when implementing two IO racks in a HACMP environment.
    • D、 Add another shared disk to each volume group to avoid quorum issues during fallover.

    正确答案:B

  • 第3题:

    A customer is looking for a new file and print server and is considering a 2-socket Intel server with redundant power and hard disk that must fit in the current server rack. With 2U available in the rack, the customer is looking for the best price performance ratio.  Which IBM server will fit the best for this customer?()

    • A、x3200
    • B、x3455
    • C、x3550
    • D、x3650

    正确答案:C

  • 第4题:

    Companycom wants the application server LPAR to communicate with the database LPAR on a p5 590 without using network adapters. What does the customer need to install?()

    • A、VIO Server
    • B、AIX 5.2 ML4
    • C、Shared Ethernet Adapter
    • D、AIX 5.3 with Advanced Power Virtualization

    正确答案:D

  • 第5题:

    A customer purchased a new IBM xSeries x445.  They already have a non-IBM industry standard rack with 14U of open space that is being considered to house the new server.  The rack houses an existing UPS unit for the entire rack.  Which of the following questions is most important to ensure that the power in the datacenter environment is ready for the initial install?()

    • A、Have optional Fibre Channel and Ethernet switches been installed in the server?
    • B、What is the available kVA value of the UPS?
    • C、Are there sufficient empty socket outlets in the UPS?
    • D、What is the impact on the power consumption of the data center cooling system?

    正确答案:B

  • 第6题:

    An IT director needs to deploy 3 partitions, each using dedicated internal boot disk. Which system will support the customer requirement using the least amount of rack space?()

    • A、Power 770 servers
    • B、Power 750 servers
    • C、Power 755 servers
    • D、Power 720 servers

    正确答案:A

  • 第7题:

    单选题
    A customer needs to install a rack with six of the x3650 M3 servers with the standard line cords. Each server has redundant power supplies. Which of the following meets this requirement?()
    A

     Two of DPI C13 Enterprise PDU 39Y8941

    B

     One of DPI Universal Rack PDU 39Y8951

    C

     One of DPI C13 Enterprise PDU 39Y8941

    D

     Two of DPI C19 Enterprise PDU 39Y8948


    正确答案: D
    解析: 暂无解析

  • 第8题:

    单选题
    A customer has a p650 on order and plans to put it in a current OEM rack.  They are concerned that the p650 power supply may demand more current than the OEM PDU can provide.  Which planning guide specification would provide the necessary requirements?()
    A

    Voltage

    B

    Frequency

    C

    Power Source Loading (max)

    D

    Power Source Loading (typical)


    正确答案: D
    解析: 暂无解析

  • 第9题:

    单选题
    While installing the equipment for a new two-node cluster, it is discovered that the disk subsystem  Rack has one connection to the power mains. The explanation given was that the disks are to be mirrored between the two disk drawers in the rack and that a failure in either of the disk drawers would simply result in half of the disk being lost.  What can be done to avoid a single point of failure?()
    A

     Customize HACMP to overcome quorum issues.

    B

     Add a second PDU to separate the power connections.

    C

     Use RAID5 when implementing two IO racks in a HACMP environment.

    D

     Add another shared disk to each volume group to avoid quorum issues during fallover.


    正确答案: C
    解析: 暂无解析

  • 第10题:

    单选题
    An administrator has a single 14U rack.  The administrator needs to install fifteen servers; rack-mounted redundant uninterruptible power supplies (UPSs), a network switch, and a KVM.  Which of the following server types would be BEST suited for this scenario?()
    A

    Blade servers

    B

    Rackmount servers

    C

    Tower servers

    D

    Web servers


    正确答案: B
    解析: 暂无解析

  • 第11题:

    单选题
    An administrator needs to install a 2U server into a rack. Which of the following shows how much space, in height, needs to be available for the server to fit in the rack?()
    A

    1.75 inches(4.45 cm)

    B

    2.5 inches(6.35 cm)

    C

    3.5 inches(8.89 cm)

    D

    4.25 inches(10.8 cm)


    正确答案: C
    解析: 暂无解析

  • 第12题:

    单选题
    Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()
    A

    Use AIX 5.3 which supports micro-partitioning for both the test and training LPARS

    B

    Use DLPAR to move resources from the test LPAR to training when training is active

    C

    Install Partition Load Manager to share resources between the test and training environments

    D

    Install Advanced Power Virtualization and then use micro-partitioning for both the test and  training LPARs


    正确答案: D
    解析: 暂无解析

  • 第13题:

    A customer needs to install a rack with six of the x3650 M3 servers with the standard line cords. Each server has redundant power supplies. Which of the following meets this requirement?()

    • A、 Two of DPI C13 Enterprise PDU 39Y8941
    • B、 One of DPI Universal Rack PDU 39Y8951
    • C、 One of DPI C13 Enterprise PDU 39Y8941
    • D、 Two of DPI C19 Enterprise PDU 39Y8948

    正确答案:A

  • 第14题:

    A customer wishes to replace 12 older small UNIX systems.  They are running out of floor space in their data center and any solution must take this into consideration.  Assuming that the applications are supported on all AIX versions, which of the following would best meet the customer’s requirements?()

    • A、A p650 running AIX v5.3
    • B、A p5-550 running AIX v5.3
    • C、A p5-570 running Advanced POWER Virtualization
    • D、Multiple rack-mounted p615s running dynamic LPAR

    正确答案:C

  • 第15题:

    A customer has requested five rack mounted servers, and a rack. They want redundant power connections. Which of the following is required to meet these requirements?()

    • A、Redundant power supplies on the servers
    • B、Redundant PDUs in the rack
    • C、edundant power supplies in the servers and redundant PDUs in the rack
    • D、Redundant power supplies in the servers, redundant PDUs in the rack, and Active Energy Manager (AEM)

    正确答案:C

  • 第16题:

    A customer has several small AIX applications that are expected to grow over the next several years.  The biggest challenge facing the customer is determining the growth rate of the applications and the I/T requirements needed to support the growth.  They are also concerned about the under-utilization of their IT resources.  What should the pSeries technical specialist recommend to address this challenge?()

    • A、Install a p615 per application.
    • B、Install a p650 with AIX 5.2 and dynamic LPAR and CUoD.
    • C、Install the appropriate solution once the requirements are understood.
    • D、Install a POWER5 system with AIX 5.3, Advanced POWER Virtualization, and CoD.

    正确答案:D

  • 第17题:

    An AIX 5.3 customer has a Power 780 in a 2-meter (T42) rack. This rack needs to be moved six inches (15cm) to allow under-floor access.   What preparation for moving the rack will result in the least disruption to end-users?()

    • A、Initiate LPAR fallover to backup systems.
    • B、Use Live Partition Mobility to move the LPARs to other systems.
    • C、Use Live Application Mobility to move critical applications to alternate systems.
    • D、Back up all LPARS to a NIM server and restore them to other LPARs on other systems.

    正确答案:B

  • 第18题:

    An administrator needs to install a 2U server into a rack. Which of the following shows how much space, in height, needs to be available for the server to fit in the rack?()

    • A、1.75 inches(4.45 cm)
    • B、2.5 inches(6.35 cm)
    • C、3.5 inches(8.89 cm)
    • D、4.25 inches(10.8 cm)

    正确答案:C

  • 第19题:

    单选题
    A customer has requested five rack mounted servers, and a rack. They want redundant power connections. Which of the following is required to meet these requirements?()
    A

    Redundant power supplies on the servers

    B

    Redundant PDUs in the rack

    C

    edundant power supplies in the servers and redundant PDUs in the rack

    D

    Redundant power supplies in the servers, redundant PDUs in the rack, and Active Energy Manager (AEM)


    正确答案: C
    解析: 暂无解析

  • 第20题:

    单选题
    A customer wishes to replace 12 older small UNIX systems.  They are running out of floor space in their data center and any solution must take this into consideration.  Assuming that the applications are supported on all AIX versions, which of the following would best meet the customer’s requirements?()
    A

    A p650 running AIX v5.3

    B

    A p5-550 running AIX v5.3

    C

    A p5-570 running Advanced POWER Virtualization

    D

    Multiple rack-mounted p615s running dynamic LPAR


    正确答案: B
    解析: 暂无解析

  • 第21题:

    单选题
    A customer is interested in reducing energy consumption and infrastructure consolidation for space. The customer needs a maximum of 14 servers in 7U rack.  Which IBM BladeCenter Chassis should be recommended? ()
    A

    BladeCenter E

    B

    BladeCenter H

    C

    BladeCenter T

    D

    BladeCenter HT


    正确答案: D
    解析: 暂无解析

  • 第22题:

    单选题
    A customer is looking for a new file and print server and is considering a 2-socket Intel server with redundant power and hard disk that must fit in the current server rack. With 2U available in the rack, the customer is looking for the best price performance ratio.  Which IBM server will fit the best for this customer?()
    A

    x3200

    B

    x3455

    C

    x3550

    D

    x3650


    正确答案: C
    解析: 暂无解析

  • 第23题:

    单选题
    A customer has several small AIX applications that are expected to grow over the next several years.  The biggest challenge facing the customer is determining the growth rate of the applications and the I/T requirements needed to support the growth.  They are also concerned about the under-utilization of their IT resources.  What should the pSeries technical specialist recommend to address this challenge?()
    A

    Install a p615 per application.

    B

    Install a p650 with AIX 5.2 and dynamic LPAR and CUoD.

    C

    Install the appropriate solution once the requirements are understood.

    D

    Install a POWER5 system with AIX 5.3, Advanced POWER Virtualization, and CoD.


    正确答案: C
    解析: 暂无解析