niusouti.com

单选题The systems administrator of a large manufacturer has POWER5 and POWER6 servers, each with LPARs running AIX 6.1.  They are running several workloads including SAP, DNS, Oracle, DB2 and WebSphere Application Server, and plan to consolidate onto one POW

题目
单选题
The systems administrator of a large manufacturer has POWER5 and POWER6 servers, each with LPARs running AIX 6.1.  They are running several workloads including SAP, DNS, Oracle, DB2 and WebSphere Application Server, and plan to consolidate onto one POWER7 server.   How can the system administrator determine how much benefit Active Memory Expansion (AME) could provide for the consolidated system?()
A

Run amepat now on all of the existing LPARs.

B

Run amepat after consolidation on all LPARs.

C

Run amepat now on all existing LPARs running on the POWER6 servers.

D

Run amepat now on all existing LPARs running database applications.


相似考题
更多“单选题The systems administrator of a large manufacturer has POWER5 and POWER6 servers, each with LPARs running AIX 6.1.  They are running several workloads including SAP, DNS, Oracle, DB2 and WebSphere Application Server, and plan to consolidate onto one POW”相关问题
  • 第1题:

    An existing IBM customer has a few pSeries servers running DB2 on AIX in their environment.  The DB2 application contains the database for an order entry application.  An xSeries SQL database server replicating from DB2 is added for off-line analysis purposes.  The customer wants to know if consolidating the storage and centralized backup is possible. What are the options available to accomplish this?()

    • A、pSeries and xSeries use different file systems. Consolidating Storage and backup is not achievable.
    • B、Consolidation is possible by connecting pSeries local storage to the xSeries SQL server using the IXA adapter.
    • C、Storage consolidation can be achieved by connecting the pSeries and xSeries servers to a common DS4000 storage server.
    • D、Storage consolidation is only achievable when raw file systems are used by the databases and both servers run the same Linux file system (e.g., EXT3 or Reiser).

    正确答案:C

  • 第2题:

    An IT director is eager to adopt POWER7 servers because of their relative performance ratings and energy efficiency, but is concerned about migrating applications which require AIX 5.3. Which of the following will address his concern?()

    • A、POWER7 servers running AIX 5.3 operate in POWER5+ mode.
    • B、POWER7 servers running AIX 5.3 operate in POWER6 and POWER6+ mode.
    • C、POWER7 servers running AIX 5.3 operate in POWER5 and POWER6 modes.
    • D、POWER7 servers running AIX 5.3 operate in POWER6 and POWER7 modes.

    正确答案:B

  • 第3题:

    A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()

    • A、PowerVM Standard Edition
    • B、VMControl Standard Edition
    • C、Hardware Management Console
    • D、IBM Systems Director Standard Edition

    正确答案:D

  • 第4题:

    A financial customer has three data centers that are approximately five kilometers apart. Their SAP application data needs to be kept synchronized within 10 milliseconds between the three sites. Which of the following solutions satisfies the customer's recovery time objective?()

    • A、DS8700 systems at each site running Metro Mirror
    • B、DS5300 systems at each site running Metro Mirror
    • C、DS5100 systems at each site running Global Mirror
    • D、XIV systems at each site running synchronous mirroring

    正确答案:A

  • 第5题:

    An HP UNIX server customer running Oracle is interested in knowing more about IBM’s future direction because of the uncertainty of HP hardware platforms changing to Itanium. Which of the following advantages should be communicated as a compelling reason to consider a pSeries server solution?()

    • A、IBM pSeries servers support Oracle on both POWER4 and Itanium
    • B、AIX has Itanium affinity with any ISV application including Oracle
    • C、Oracle and thousands of other ISV applications are already available for AIX on pSeries
    • D、IBM Data Migration Services can migrate the HP UNIX operating system to a pSeries solution

    正确答案:C

  • 第6题:

    单选题
    A pSeries technical specialist has been asked to provide a server consolidation solution to replace several AIX servers running typical commercial database workloads.  Benchmarks for SPECint, SPECfp, SPECjbb as well as estimates of ROLTP and rPerf are available for all the current systems. Which of the following could be used as a first approximation of total performance required for one large server?()
    A

    Sum of SPECfp values

    B

    Sum of rPerf values only

    C

    Sum of rPerf and ROLTP values

    D

    Sum of SPECint and SPECjbb values


    正确答案: D
    解析: 暂无解析

  • 第7题:

    单选题
    A financial customer has three data centers that are approximately five kilometers apart. Their SAP application data needs to be kept synchronized within 10 milliseconds between the three sites. Which of the following solutions satisfies the customer's recovery time objective?()
    A

    DS8700 systems at each site running Metro Mirror

    B

    DS5300 systems at each site running Metro Mirror

    C

    DS5100 systems at each site running Global Mirror

    D

    XIV systems at each site running synchronous mirroring


    正确答案: A
    解析: 暂无解析

  • 第8题:

    单选题
    A customer plans to consolidate to high-end enterprise level servers using multiple partitions.  They are evaluating an IBM POWER5 solution for their server consolidation environment.  Which of the following best describes the value of the IBM solution as compared with the competition?()
    A

    The POWER5 system has greater memory and processor granularity and can also run both Linux and AIX at the same time in different LPARs.

    B

    The POWER5 system supports more partitions, processors, and memory than any competitor’s solution.

    C

    The POWER5 system has the lowest partitioning overhead and can also run both Linux and AIX at the same time in different LPARs.

    D

    The POWER5 system supports more partitions and has the lowest partitioning overhead.


    正确答案: D
    解析: 暂无解析

  • 第9题:

    单选题
    An IT director is eager to adopt POWER7 servers because of their relative performance ratings and energy efficiency, but is concerned about migrating applications which require AIX 5.3. Which of the following will address his concern?()
    A

    POWER7 servers running AIX 5.3 operate in POWER5+ mode.

    B

    POWER7 servers running AIX 5.3 operate in POWER6 and POWER6+ mode.

    C

    POWER7 servers running AIX 5.3 operate in POWER5 and POWER6 modes.

    D

    POWER7 servers running AIX 5.3 operate in POWER6 and POWER7 modes.


    正确答案: B
    解析: 暂无解析

  • 第10题:

    单选题
    The company has purchased one hundred and fifty new servers. The server administrator needs to build and deploy them as quickly as possible. Which of the following is the FASTEST method of building and deploying each server?()
    A

    Build each server from the OS manufacturer’s build disk.

    B

    Use an imaging system to manually deploy the build to the servers.

    C

    Build each server with the manufacturer’s build disk.

    D

    Give the company build disk to the server manufacturer.


    正确答案: B
    解析: 暂无解析

  • 第11题:

    单选题
    A financial customer has three data centers that are four kilometers apart. Their SAP application data needs to be kept synchronized within 10 milliseconds.  Which solution satisfies the customer’s recovery time objective()
    A

    DS8700 systems at each site running Metro Mirror

    B

    DS8700 systems at each site running Global Mirror

    C

    DS5300 systems at each site running Global Mirror

    D

    XIV systems at each site running Remote Mirroring


    正确答案: A
    解析: 暂无解析

  • 第12题:

    单选题
    An HP UNIX server customer running Oracle is interested in knowing more about IBM’s future direction because of the uncertainty of HP hardware platforms changing to Itanium. Which of the following advantages should be communicated as a compelling reason to consider a pSeries server solution?()
    A

    IBM pSeries servers support Oracle on both POWER4 and Itanium

    B

    AIX has Itanium affinity with any ISV application including Oracle

    C

    Oracle and thousands of other ISV applications are already available for AIX on pSeries

    D

    IBM Data Migration Services can migrate the HP UNIX operating system to a pSeries solution


    正确答案: C
    解析: 暂无解析

  • 第13题:

    A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()

    • A、All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or later
    • B、The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be managed by this new HMC
    • C、They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based  systems connected to the existing one
    • D、The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the POWER5 and POWER6 based servers to IVM

    正确答案:A

  • 第14题:

    A pSeries technical specialist has been asked to provide a server consolidation solution to replace several AIX servers running typical commercial database workloads.  Benchmarks for SPECint, SPECfp, SPECjbb as well as estimates of ROLTP and rPerf are available for all the current systems. Which of the following could be used as a first approximation of total performance required for one large server?()

    • A、Sum of SPECfp values
    • B、Sum of rPerf values only
    • C、Sum of rPerf and ROLTP values
    • D、Sum of SPECint and SPECjbb values

    正确答案:B

  • 第15题:

    A financial customer has three data centers that are four kilometers apart. Their SAP application data needs to be kept synchronized within 10 milliseconds.  Which solution satisfies the customer’s recovery time objective()

    • A、DS8700 systems at each site running Metro Mirror
    • B、DS8700 systems at each site running Global Mirror
    • C、DS5300 systems at each site running Global Mirror
    • D、XIV systems at each site running Remote Mirroring

    正确答案:A

  • 第16题:

    A customer plans to consolidate to high-end enterprise level servers using multiple partitions.  They are evaluating an IBM POWER5 solution for their server consolidation environment.  Which of the following best describes the value of the IBM solution as compared with the competition?()

    • A、The POWER5 system has greater memory and processor granularity and can also run both Linux and AIX at the same time in different LPARs.
    • B、The POWER5 system supports more partitions, processors, and memory than any competitor’s solution.
    • C、The POWER5 system has the lowest partitioning overhead and can also run both Linux and AIX at the same time in different LPARs.
    • D、The POWER5 system supports more partitions and has the lowest partitioning overhead.

    正确答案:A

  • 第17题:

    A customer wants to run a Domino e-mail application,a Business Intelligence database,and a batch processing application on Linux.The workloads have different behaviors and do not have peaks at the same time. What is a benefit of running these applications on a Power Systems server instead of running on separate x86 servers?()

    • A、Each Linux application can run in a Workload Partition, reducing the management efforts.
    • B、Total cost of Linux applications on Power Systems is more cost effective than on x86 because of platform licensing.
    • C、Memory cloning can be used on the Power Systems to have a single image of the Linux kernel shared by all partitions.
    • D、Using micro-partitions on Power Systems allow the workloads to share the processing resources, increasing the overall system utilization.

    正确答案:D

  • 第18题:

    单选题
    A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()
    A

    All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or later

    B

    The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be managed by this new HMC

    C

    They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based  systems connected to the existing one

    D

    The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the POWER5 and POWER6 based servers to IVM


    正确答案: B
    解析: 暂无解析

  • 第19题:

    单选题
    A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()
    A

    PowerVM Standard Edition

    B

    VMControl Standard Edition

    C

    Hardware Management Console

    D

    IBM Systems Director Standard Edition


    正确答案: D
    解析: 暂无解析

  • 第20题:

    单选题
    A hospital customer with an experienced AIX and Microsoft Windows staff wants to consolidate all of their file/print services onto fewer systems.  They currently use multiple Microsoft Windows-based Intelsystems that are experiencing reliability problems.  They also have POWER4+ systems that are running multiple AIX LPARs that have experienced no reliability issues. They need at least 99.99% uptime. Which solution will meet their uptime needs at the lowest cost?()
    A

    Combine the file/print servers onto a larger Intel-based machine (x445).

    B

    Bring up a Linux LPAR on the pSeries and run Samba to provide file/print services.

    C

    Bring up another AIX LPAR on the pSeries and run Samba to provide file/print services.

    D

    Bring up another AIX LPAR on the pSeries and run Connect Direct to provide file/print services.


    正确答案: B
    解析: 暂无解析

  • 第21题:

    单选题
    A customer has a mixed environment of AIX on POWER4 and POWER5, and x86 based systems running a supported distribution of Linux. There is a total of 7 partitions and three standalone x86 servers. The customer wants to consolidate their applications using a single 4-core POWER6 server.  What is the minimum PowerVM edition that supports the customer requirement?()
    A

     PowerVM Lx86

    B

     PowerVM Express Edition

    C

     PowerVM Standard Edition

    D

     PowerVM Enterprise Edition


    正确答案: B
    解析: 暂无解析

  • 第22题:

    单选题
    An existing IBM customer has a few pSeries servers running DB2 on AIX in their environment.  The DB2 application contains the database for an order entry application.  An xSeries SQL database server replicating from DB2 is added for off-line analysis purposes.  The customer wants to know if consolidating the storage and centralized backup is possible. What are the options available to accomplish this?()
    A

    pSeries and xSeries use different file systems. Consolidating Storage and backup is not achievable.

    B

    Consolidation is possible by connecting pSeries local storage to the xSeries SQL server using the IXA adapter.

    C

    Storage consolidation can be achieved by connecting the pSeries and xSeries servers to a common DS4000 storage server.

    D

    Storage consolidation is only achievable when raw file systems are used by the databases and both servers run the same Linux file system (e.g., EXT3 or Reiser).


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    A customer wants to run a Domino e-mail application,a Business Intelligence database,and a batch processing application on Linux.The workloads have different behaviors and do not have peaks at the same time. What is a benefit of running these applications on a Power Systems server instead of running on separate x86 servers?()
    A

    Each Linux application can run in a Workload Partition, reducing the management efforts.

    B

    Total cost of Linux applications on Power Systems is more cost effective than on x86 because of platform licensing.

    C

    Memory cloning can be used on the Power Systems to have a single image of the Linux kernel shared by all partitions.

    D

    Using micro-partitions on Power Systems allow the workloads to share the processing resources, increasing the overall system utilization.


    正确答案: B
    解析: 暂无解析