PowerHA SystemMirror
Peer to Peer Remote Copy
General Parallel File Systems
Parallel Operating Environment
第1题:
A customer needs to achieve a very aggressive RTO of 30 minutes or less. A critical requirement is a continuous availability and disaster recovery solution for the mainframe environment. What IBM solution should be recommended to this customer?()
第2题:
A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers.Which of the following would be most appropriate to ask first?()
第3题:
A customer is interested in a power efficient server solution. The Sales Specialist has recommended a BladeCenter solution. The customer debates the price is high compared to rack servers. Which of the following should the Sales Specialist emphasize to address the pricing difference?()
第4题:
A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems. They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems. What is a key requirement that they need to plan for with the new HMC?()
第5题:
The account team is putting together a very complex solution for the customer. During the solution design phase, many of the customer’s requirements have changed and additional requirements are being identified. What should the pSeries technical specialist do to ensure the greatest possible customer satisfaction?()
第6题:
An IBM BladeCenter H chassis for the JS22 Blade servers
A concurrent KVM daughter card
A pair of IBM BladeCenter Power Supplies
A second Management Module
第7题:
Verification of the expected performance of the new solution.
A document used by IBM manufacturing to build and ship the system solution.
An IBM Quality Assurance Certificate which is supplied to the customer with the system.
A list of actions that are recommended to reduce risk and create a successful implementation.
第8题:
Use eConfig to configure and validate each pSeries and p5 system.
Engage Advanced Technical Support to review any outstanding technical issues.
Confirm with the customer that the solution design meets their requirements.
Perform a Pre-Install Solution Assurance Review to validate required power requirements.
第9题:
Higher rack density that reduces data center footprints
Internal upgrades that only IBM can offer
Total Cost of Ownership (TCO) related to innovative components such as Integrated Switches
The Rear Door Heat eXchanger that only IBM can offer
第10题:
What are the plans for Disaster Recovery?
What are the plans for data migration?
Would iSCSI meet your needs?
How much space is available in the current storage systems?
第11题:
PowerHA
Tivoli Storage Manager (TSM)
Tivoli Productivity Center (TPC)
General Parallel File System (GPFS)
第12题:
PowerHA SystemMirror
Peer to Peer Remote Copy
General Parallel File Systems
Parallel Operating Environment
第13题:
A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information, what additional items does the customer need to purchase? ()
第14题:
After putting together a configuration that meets customer’s requirements, a TDA is suggested. The customer is not familiar with the TDA process and asks why this should be done. This of the following is the benefit of TDA?()
第15题:
A customer needs to share large files across three Power Systems servers to create and validate complex automotive designs. What IBM solution should be recommended?()
第16题:
A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers. Which of the following would be most appropriate to ask first?()
第17题:
Which IBM software technology is a key component of SONAS?()
第18题:
Turn over current design to Techline to create configurations
Perform knowledge transfer of design requirements to Business partner then disengage
Work with Business Partner to engage Techline to assist with configuration and request technical and Delivery Assessment (TDA)
Work with business partner to engage Techline to create configurations
第19题:
when the remote VPN peer is behind a NAT device
when multiple networks need to be reached across the tunnel
when the remote VPN peer is a dialup or remote access client
when a dynamic routing protocol such as OSPF is required across the VPN
第20题:
BladeCenter E
BladeCenter H
BladeCenter T
BladeCenter HT
第21题:
What are Disaster Recoveryplans
What are plans for datamigration
What storage system space isavailable
DoesiSCSI meet the needs
第22题:
Metro Mirror
Metro/Global Mirror
Geographically Dispersed Open Servers (GDOS)
Geographically Dispersed ParallelSysplex (GDPS)
第23题:
A TDA are recommended only for high end hardware and very large or complex business opportunities
A TDA will ensure the solution and configuration are complete and technically sound and meet customer requirements
A TDA will guarantee that the hardware will work in customer’s environment at the volumes projected
A TDA brings an IBM technician onsite to properly inspect and installed hardware and related software