niusouti.com

单选题A customer wants to run VMWare ESX on an x445 with a large number of virtual machines running Windows 2003 Server as a Disaster Recovery (DR) Site for the production environment.  Which of the following questions would most impact the memory configurat

题目
单选题
A customer wants to run VMWare ESX on an x445 with a large number of virtual machines running Windows 2003 Server as a Disaster Recovery (DR) Site for the production environment.  Which of the following questions would most impact the memory configuration?()
A

What version of VMWare ESX Server is being considered?

B

Do the systems currently use Double Data Rate (DDR) memory?

C

What is the total number of processors installed in the production systems?

D

What is the total amount of memory currently being used across all the production systems?


相似考题
参考答案和解析
正确答案: C
解析: 暂无解析
更多“单选题A customer wants to run VMWare ESX on an x445 with a large number of virtual machines running Windows 2003 Server as a Disaster Recovery (DR) Site for the production environment.  Which of the following questions would most impact the memory configurat”相关问题
  • 第1题:

    A mechanical contractor is deploying a custom application written to take advantage of multithreading features and run in a Windows environment. The customer has read about iDataPlex, BladeCenter, and System x servers. The customer wants to know which processor family will run the application most efficiently. Which of the following questions will provide the required information?()

    • A、Can the application use Hot Swap Processor, Memory, and PCI-X technology? 
    • B、Will the application benefit from larger disk cache and swap space? 
    • C、Will the application run faster with Microsoft OLTP technology? 
    • D、What is the application's maximum processor scaling capability?

    正确答案:B

  • 第2题:

    A customer needs a new Microsoft Windows 2003 Server.  They are running an application that requires substantial memory.  They would like a rack mountable system, which will support four Xeon processors with 2MB of L3 cache.  Which of the following is the minimum configuration to satisfy the customer’s requirements?()

    • A、x445 with four Xeon MP processors and 8GB of memory
    • B、x445 with four Xeon MP processors and 16GB of memory in a single SMP module
    • C、x445 with four Xeon DP processors and 16GB of memory in a single SMP module
    • D、x445 with two SMP modules each containing two Xeon DP processors and 8GB of memory

    正确答案:A

  • 第3题:

    A customer has four 2-way 2U front-end web servers that are currently running at 15% CPU utilization.  These servers provide points of access for users worldwide, and volume is expected to triple in the next six months and aggressively grow thereafter.  They want to upgrade these systems to newer technology and stay within the 8U of rack space that they are replacing.  Which solution would fit the customer’s requirements?()

    • A、Three x366 4-ways running VMWare ESX Server.
    • B、An x445 8-way Xeon MP attached to a DS4300 and running VMWare ESX Server.
    • C、An x445 16-way Xeon MP attached to an EXP400 and running VMWare ESX Server.
    • D、Four x346 2-ways running VMWare ESX Server.

    正确答案:B

  • 第4题:

    A customer wants to implement a clustered database solution on their existing x445 servers.  A minimum of four nodes must participate in the cluster, and the customer wishes to use open standards.  Which of the following best satisfies their requirements?()

    • A、Novell NetWare Cluster Services
    • B、Red Hat Enterprise Linux Cluster Suite
    • C、Microsoft Windows 2003 Server with MSCS
    • D、Microsoft Windows 2003 Enterprise Edition

    正确答案:B

  • 第5题:

    A customer is considering a second p690 at a second site for Disaster Recovery purposes.  Which of the following On Demand offerings is most applicable in this environment?()

    • A、On/Off CoD
    • B、Reserve CoD
    • C、Permanent CUoD
    • D、Capacity Backup

    正确答案:D

  • 第6题:

    单选题
    Your network environment includes the following elements: - Two Windows Server 2008 R2 Hyper-V servers - Two VMware ESX 3.5 servers - Microsoft System Center Virtual Machine Manager (VMM) 2008 R2 You run several Windows Server 2003 virtual machines (VMs) on your ESX host servers. You need to convert the ESX VMs to Hyper-V, and you must minimize the downtime during the conversion. What should you do?()
    A

    Shut down the VMs, and then perform a physical-to-virtual (P2V) conversion

    B

    Shut down the VMs, and then perform a virtual-to-virtual (V2V) conversion

    C

    Perform a physical-to-virtual (P2V) conversion while the VMs are running

    D

    Perform a physical-to-virtual (P2V) conversion while the VMs are shutdown


    正确答案: A
    解析: 暂无解析

  • 第7题:

    单选题
    A customer wants to hold all enterprise data on their DS4000 system.  Several servers were added after they purchased another company.  The servers that have to be run are:       (1)An Oracle database running on a HP-UX server   (2)Several virtual machines running on VMWare ESX server       (3)A Microsoft cluster running Exchange 2000 server   Which of these new servers can be integrated with the DS4000?()
    A

    DS4000 storage does not support HP-UX, so the HP-UX server cannot be integrated.All other new servers can be used.

    B

    An Exchange cluster needs local disks, so the DS4000 cannot be used for this.All other new servers can be used.

    C

    When equipped with proper HBA’s and subsystem device drivers, all new servers can operate with the DS4000 storage device.

    D

    VMWare ESX can use the DS4000 storage; however, the virtual machines running in it will not have access to this storage other than via a virtual disk.All other new servers can be used.


    正确答案: B
    解析: 暂无解析

  • 第8题:

    单选题
    A mechanical contractor is deploying a custom application written to take advantage of multithreading features and run in a Windows environment. The customer has read about iDataPlex, BladeCenter, and System x servers. The customer wants to know which processor family will run the application most efficiently. Which of the following questions will provide the required information?()
    A

    Can the application use Hot Swap Processor, Memory, and PCI-X technology? 

    B

    Will the application benefit from larger disk cache and swap space? 

    C

    Will the application run faster with Microsoft OLTP technology? 

    D

    What is the application's maximum processor scaling capability?


    正确答案: C
    解析: 暂无解析

  • 第9题:

    单选题
    Your network environment includes the following elements: Two Windows Server 2008 R2 Hyper-V serversTwo VMware ESX 3.5 serversMicrosoft System Center Virtual Machine Manager (VMM) 2008 R2   You run several Windows Server 2003 virtual machines (VMs) on your ESX host servers. You need to convert the ESX VMs to Hyper-V, and you must minimize the downtime during the conversion.  What should you do?()
    A

    Run the New-V2V PowerShell cmdlet

    B

    Perform a physical-to-virtual (P2V) conversion while the VMs are running

    C

    Shut down the VMs, and then perform a virtual-to-virtual (V2V) conversion

    D

    Shut down the VMs, and then perform a physical-to-virtual (P2V) conversion


    正确答案: B
    解析: 暂无解析

  • 第10题:

    单选题
    A company wants to replace an existing UNIX database server with a new application running on Microsoft SQL Server.  Sizing analysis shows that a system with at least eight Xeon MP processors and 24GB RAM will be required for the central database server. Which of the following will meet the requirements at the lowest cost?()
    A

    8-way x445 with Microsoft Windows Server 2003 Standard Edition

    B

    8-way x445 with Microsoft Windows Server 2003 Datacenter Edition

    C

    8-way x445 with Microsoft Windows Server 2003 Enterprise Edition

    D

    16-way x445 with VMWare ESX with SMP and Windows Server 2003 Standard Edition VMs


    正确答案: B
    解析: 暂无解析

  • 第11题:

    单选题
    A customer has a large amount of data stored on three database servers and is concerned that at present there is no disaster recovery plan in place.  They have an existing tape backup solution that meets their backup window.  In order to analyze potential disaster recovery plans, which of the following questions is the most important?()
    A

    What is the minimum critical backup window?

    B

    Which server is handling the most critical data?

    C

    How much data is stored on each server?

    D

    What is the throughput of the hard drives?


    正确答案: B
    解析: 暂无解析

  • 第12题:

    多选题
    A company wants to consolidate 20 existing dual processor Pentium III servers, all running a web server application on Windows Server 2003.  They are considering consolidating to a single x445 running VMWare ESX.  Which TWO of the following questions will provide enough information to determine the correct processor configuration?()
    A

    Do the web servers require SMP capability?

    B

    Is the web content static or dynamic information?

    C

    What is the average CPU utilization of the existing web servers?

    D

    Will the servers need a SCSI or Fibre Channel storage solution?

    E

    What are the expected growth rates for the web servers?


    正确答案: E,C
    解析: 暂无解析

  • 第13题:

    A customer wants to integrate an x445 running SuSE with their existing EMC storage infrastructure.  Which of the following tasks needs to be done to ensure that the solution will work properly?()

    • A、Ensure that the EMC storage is listed on the IBM Server Proven website
    • B、Ensure that the x445 is listed on the EMC Hardware Compatibility website
    • C、Ensure that the x445 and the EMC storage server are listed on Novell’s SuSE Supported Hardware website
    • D、Build a proof of concept system at the customer site to demonstrate functionality

    正确答案:A

  • 第14题:

    A customer wants to run VMWare ESX on an x445 with a large number of virtual machines running Windows 2003 Server as a Disaster Recovery (DR) Site for the production environment.  Which of the following questions would most impact the memory configuration?()

    • A、What version of VMWare ESX Server is being considered?
    • B、Do the systems currently use Double Data Rate (DDR) memory?
    • C、What is the total number of processors installed in the production systems?
    • D、What is the total amount of memory currently being used across all the production systems?

    正确答案:D

  • 第15题:

    A customer has a large amount of data stored on three database servers and is concerned that at present there is no disaster recovery plan in place.  They have an existing tape backup solution that meets their backup window.  In order to analyze potential disaster recovery plans, which of the following questions is the most important?()

    • A、What is the minimum critical backup window?
    • B、Which server is handling the most critical data?
    • C、How much data is stored on each server?
    • D、What is the throughput of the hard drives?

    正确答案:B

  • 第16题:

    A customer needs to deploy a SAN and connect nine servers running a mix of Windows and Linux.  They currently need 12TB, but their growth requirements will be tripled in the near future.  They will also consolidate 18 legacy Windows servers onto one system using virtualization software and connect that server to the storage solution.  A DS4000 series backup solution needs to be included in the design.  Which of the following solutions will satisfy these requirements?()

    • A、DS4300 with a switched fabric and an x445 running VMWare ESX server
    • B、DS4500 with a switched fabric and an x445 running VMWare ESX server
    • C、DS4300 SAN with a switched fabric and an x445 running Microsoft Virtual Server
    • D、DS4400 Server with an x445 running Virtuozzo VPS

    正确答案:B

  • 第17题:

    Your network environment includes the following elements: Two Windows Server 2008 R2 Hyper-V serversTwo VMware ESX 3.5 serversMicrosoft System Center Virtual Machine Manager (VMM) 2008 R2   You run several Windows Server 2003 virtual machines (VMs) on your ESX host servers. You need to convert the ESX VMs to Hyper-V, and you must minimize the downtime during the conversion.  What should you do?()

    • A、Run the New-V2V PowerShell cmdlet
    • B、Perform a physical-to-virtual (P2V) conversion while the VMs are running
    • C、Shut down the VMs, and then perform a virtual-to-virtual (V2V) conversion
    • D、Shut down the VMs, and then perform a physical-to-virtual (P2V) conversion

    正确答案:B

  • 第18题:

    单选题
    A customer has four 2-way 2U front-end web servers that are currently running at 15% CPU utilization.  These servers provide points of access for users worldwide, and volume is expected to triple in the next six months and aggressively grow thereafter.  They want to upgrade these systems to newer technology and stay within the 8U of rack space that they are replacing.  Which solution would fit the customer’s requirements?()
    A

    Three x366 4-ways running VMWare ESX Server.

    B

    An x445 8-way Xeon MP attached to a DS4300 and running VMWare ESX Server.

    C

    An x445 16-way Xeon MP attached to an EXP400 and running VMWare ESX Server.

    D

    Four x346 2-ways running VMWare ESX Server.


    正确答案: B
    解析: 暂无解析

  • 第19题:

    单选题
    A customer wants to integrate an x445 running SuSE with their existing EMC storage infrastructure.  Which of the following tasks needs to be done to ensure that the solution will work properly?()
    A

    Ensure that the EMC storage is listed on the IBM Server Proven website

    B

    Ensure that the x445 is listed on the EMC Hardware Compatibility website

    C

    Ensure that the x445 and the EMC storage server are listed on Novell’s SuSE Supported Hardware website

    D

    Build a proof of concept system at the customer site to demonstrate functionality


    正确答案: B
    解析: 暂无解析

  • 第20题:

    单选题
    A customer is considering a second p690 at a second site for Disaster Recovery purposes.  Which of the following On Demand offerings is most applicable in this environment?()
    A

    On/Off CoD

    B

    Reserve CoD

    C

    Permanent CUoD

    D

    Capacity Backup


    正确答案: A
    解析: 暂无解析

  • 第21题:

    单选题
    A customer needs to deploy a SAN and connect nine servers running a mix of Windows and Linux.  They currently need 12TB, but their growth requirements will be tripled in the near future.  They will also consolidate 18 legacy Windows servers onto one system using virtualization software and connect that server to the storage solution.  A DS4000 series backup solution needs to be included in the design.  Which of the following solutions will satisfy these requirements?()
    A

    DS4300 with a switched fabric and an x445 running VMWare ESX server

    B

    DS4500 with a switched fabric and an x445 running VMWare ESX server

    C

    DS4300 SAN with a switched fabric and an x445 running Microsoft Virtual Server

    D

    DS4400 Server with an x445 running Virtuozzo VPS


    正确答案: B
    解析: 暂无解析

  • 第22题:

    单选题
    A customer wants to run VMWare ESX on an x445 with a large number of virtual machines running Windows 2003 Server as a Disaster Recovery (DR) Site for the production environment.  Which of the following questions would most impact the memory configuration?()
    A

    What version of VMWare ESX Server is being considered?

    B

    Do the systems currently use Double Data Rate (DDR) memory?

    C

    What is the total number of processors installed in the production systems?

    D

    What is the total amount of memory currently being used across all the production systems?


    正确答案: C
    解析: 暂无解析

  • 第23题:

    单选题
    A customer wants to implement a clustered database solution on their existing x445 servers.  A minimum of four nodes must participate in the cluster, and the customer wishes to use open standards.  Which of the following best satisfies their requirements?()
    A

    Novell NetWare Cluster Services

    B

    Red Hat Enterprise Linux Cluster Suite

    C

    Microsoft Windows 2003 Server with MSCS

    D

    Microsoft Windows 2003 Enterprise Edition


    正确答案: B
    解析: 暂无解析

  • 第24题:

    单选题
    A customer has an IBM System Storage DS8100 at their primary site and a DS6800 at their recovery site, 9.5 kilometers away. They want to replicate data for disaster recovery backup with the least impact on performance. Which of the following products best accomplishes this task?()
    A

    Global Copy

    B

    Metro Mirror

    C

    Global Mirror

    D

    Metro/Global Mirror


    正确答案: C
    解析: 暂无解析