单选题A customer has an existing rack environment with 18 x365 and 2 x255 servers.  How can the customer monitor and manage the hardware even if the systems are shut down?()A Use PC Anywhere over the Ethernet LAN.B Use RDM and Aurema to manage the systems.C

题目
单选题
A customer has an existing rack environment with 18 x365 and 2 x255 servers.  How can the customer monitor and manage the hardware even if the systems are shut down?()
A

Use PC Anywhere over the Ethernet LAN.

B

Use RDM and Aurema to manage the systems.

C

Connect high-speed modems to each of the systems’ serial ports to use IBM Director.

D

Interconnect the Remote Supervisor Adapters II (RSA II) in the x365 servers to the x255 servers.


相似考题
更多“单选题A customer has an existing rack environment with 18 x365 and 2 x255 servers.  How can the customer monitor and manage the hardware even if the systems are shut down?()A Use PC Anywhere over the Ethernet LAN.B Use RDM and Aurema to manage the systems.C ”相关问题
  • 第1题:

    An existing IBM customer has some iSeries servers in their environment.  The customer is adding an x366 server with an RSA-II installed for their Microsoft Client/Server applications.  The customer wants to consolidate the storage and centralize the backup of the iSeries and xSeries platforms.  Which of the following will accomplish this?()

    • A、Share the data over the Ethernet LAN.
    • B、Install the IXA Adapter in the iSeries server.
    • C、Install the IXA Adapter in the xSeries server.
    • D、Attach both servers to an IXS switch.

    正确答案:C

  • 第2题:

    A Dell customer decided to use IBM Director and xSeries to manage their servers.  They purchased 10 IBM x336 servers and they already have 75 various Dell servers.  Which TWO steps need to be verified to be able to manage the mixed environment with IBM Director?()

    • A、Verify that the Dell systems have TCP/IP enabled
    • B、Verify that the systems are running the IBM Director Agent
    • C、Verify that the managed systems are SMBIOS 2.1 and WfM 2.0 compliant
    • D、Verify that the Dell systems have at least a 1GB of memory installed
    • E、Install an SNMP agent on the Dell systems as IBM Director cannot manage Industry Standard non-IBM servers

    正确答案:B,C

  • 第3题:

    A customer has 15 IBM x365 servers in a rack environment and is using IBM Director for systems management.  They require the ability to restart any server independent of the operating system.  Which of the following is the most cost-effective solution?()

    • A、Interconnect the service processors and use the IBM Director Agent
    • B、Install RSA II in each server and chain together the systems management processors
    • C、Install the RSA II in the top server and chain together the service processor interconnect
    • D、Install the IBM Director Agent on each server and use the remote control function to restart the servers

    正确答案:C

  • 第4题:

    A customer has an IBM System Storage DS5000 and needs to add more disk drives to the unit.There is no record of the configuration for this machine. How can the configuration be retrieved soan upgrade can be configured?()

    • A、use Storage Manager to export the system profile
    • B、create a configuration ineConfig and provide proof of purchase
    • C、use the IBM Standalone Systems Configuration Tool (SSCT) to recreate the configuration
    • D、have the customer contact the IBM AAS coordinator to retrieve a copy of the originalconfiguration

    正确答案:A

  • 第5题:

    A customer plans to order several new pSeries systems and is concerned that the additional heat load may overwhelm the current air-handling system.  How might the pSeries technical specialist aid the customer in addressing their concern?()

    • A、Direct the customer to the Installation Guide for each system to identify the power requirements.
    • B、Direct the customer to engage their site personnel to ensure the proper power connectors are provided to support the systems.
    • C、Direct the customer to the Site and Hardware Planning Information and review the system requirements for each new pSeries system.
    • D、Direct the customer to the Site and Hardware Planning Information to confirm that enough space is available in the rack to allow for proper airflow.

    正确答案:C

  • 第6题:

    What are key benefits of IBM Systems Director Standard Edition?()

    • A、Backup data Manage problems Monitor network system
    • B、Report problems Manage servers and virtual environment Monitor the network 
    • C、Monitor system health and network Install and manage AIX and IBM i Manage energy consumption 
    • D、Monitor system health and network Manage servers and virtual environment Collect performance data

    正确答案:B

  • 第7题:

    A customer is running business-critical applications on a few SQL servers in their environment.  The customer needs to know if and when the SQL server stops, so the service can be restarted immediately.  Which of the following will accomplish this?()

    • A、Use the Capacity Manager to monitor the processes on the servers.Log the events to the event log and use the resource monitor to restart the SQL process.
    • B、Use the System Availability tool that comes with IBM Director to improve the availability of the SQL applications.
    • C、Use the IBM Director Application PING function to watch the SQL service. When the SQL service goes down, restart the service remotely on the managed server using the software distribution function.
    • D、Utilize Process Management and create a threshold to monitor the SQL process.Create an Event Action Plan and set the task to restart the SQL process when stopped and apply it to the managed SQL servers.

    正确答案:D

  • 第8题:

    单选题
    A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()
    A

    Purchase a second HMC and use this to manage the new servers.

    B

    Connect all of the new servers to the existing private HMC network.

    C

    Configure a second private network on their existing HMC for the new servers.

    D

    Connect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.


    正确答案: B
    解析: 暂无解析

  • 第9题:

    单选题
    A customer feels they are over-provisioning their current storage environment and falling short onperformance requirements. Which IBM solution can best help this customer manage their multi-tiered disk environment more effectively?()
    A

    IBM Systems Director 

    B

    DS8700 with Easy Tier 

    C

    SAN Volume Controller v6.1 

    D

    Advanced Fully Automated Storage Tiering


    正确答案: D
    解析: 暂无解析

  • 第10题:

    单选题
    A customer has a Linux server farm and wants to use IBM Director to manage all of their systems.  Which of the following is the preferred installation of IBM Director to fully manage the Linux systems?()
    A

    Install Director Server on a Windows 2000 Server and install the Director agents on the Linux systems.

    B

    Install IBM Director Agent on a Linux server and install the Director Server on the Linux systems.

    C

    Install the Director Server on a Linux server and manage the systems via Linux native SNMP support.

    D

    Install Director Server on a Linux server and install the Director Linux agent on the Linux systems.


    正确答案: D
    解析: 暂无解析

  • 第11题:

    单选题
    A customer is consolidating their ten rack mount Windows servers into a VMware environment with four servers. The existing servers all have internal disk. The total amount of useable capacity is 5TB which is expected to increase to 10TB over the life of this asset. The customer will want to use the advanced features of VMware like VMotion.The customer is concerned about cost. Which of the following meets the customers needs? ()
    A

    DS3500 with SAS Host Connection 

    B

    DS3500 with iSCSI Host Connection 

    C

    DS3500 with FC Host Connection 

    D

    DS5020


    正确答案: A
    解析: 暂无解析

  • 第12题:

    单选题
    When ordering a new IBM Power Systems server, a customer is given the option of two types of Hardware Management Console:7042-CR4 and 7042-C06. Which main difference between the options would influence the customer's decision?()
    A

    The 7042-CR4 is a rack mounted model, compared to the 7042-C06, which is adesktop.

    B

    The 7042-CR4 is limited to 16 managed systems, compared to a limit of 32 for the 7042-C06.

    C

    The 7042-C06 has faster CPUs and twice the RAM compared to the 7042-CR4,which is suited to large enterprise deployments.

    D

    The 7042-C06 can manage POWER5-based hardware, in addition to POWER6, while the 7042-CR4 can only manage POWER6-based hardware.


    正确答案: C
    解析: 暂无解析

  • 第13题:

    A customer is consolidating their ten rack mount Windows servers into a VMware environment with four servers. The existing servers all have internal disk. The total amount of useable capacity is 5TB which is expected to increase to 10TB over the life of this asset. The customer will want to use the advanced features of VMware like VMotion.The customer is concerned about cost. Which of the following meets the customers needs? ()

    • A、DS3500 with SAS Host Connection 
    • B、DS3500 with iSCSI Host Connection 
    • C、DS3500 with FC Host Connection 
    • D、DS5020

    正确答案:A

  • 第14题:

    A customer has a mixed Dell and IBM server environment.  They want to implement a system management solution for all their Windows, Linux, and VMWare ESX Intel based servers.  Which TWO features of IBM Director will be an advantage for this customer?()

    • A、IBM Director comes with free Aurema and SteelEye software plug-ins.
    • B、IBM Director supports non-IBM industry standard Intel based servers.
    • C、IBM Director servers can be managed from within the MS Performance Monitor.
    • D、IBM Director requires no agents to be installed and run on the IBM systems.
    • E、IBM Director offers agents to manage VMWare ESX Server and runs on Linux while Dell does not.

    正确答案:B,E

  • 第15题:

    A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()

    • A、Purchase a second HMC and use this to manage the new servers.
    • B、Connect all of the new servers to the existing private HMC network.
    • C、Configure a second private network on their existing HMC for the new servers.
    • D、Connect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.

    正确答案:B

  • 第16题:

    The customer is consolidating their ten rack mount Windows servers into a VMware environment with four servers. The existing servers all have internal disk. The total amount of useable capacity is 5TB which is expected to increase to 10TB over the life of this asset. The customer will want to use the advanced features of VMware like VMotion. The customer is concerned about cost. Which of the following meets the customers needs?()

    • A、DS3500 with SAS Host Connection
    • B、DS3500 withiSCSI Host Connection
    • C、DS3500 with FC Connection
    • D、DS5020

    正确答案:A

  • 第17题:

    A customer feels they are over-provisioning their current storage environment and falling short onperformance requirements. Which IBM solution can best help this customer manage their multi-tiered disk environment more effectively?()

    • A、IBM Systems Director 
    • B、DS8700 with Easy Tier 
    • C、SAN Volume Controller v6.1 
    • D、Advanced Fully Automated Storage Tiering

    正确答案:B

  • 第18题:

    An AIX 5.3 customer has a Power 780 in a 2-meter (T42) rack. This rack needs to be moved six inches (15cm) to allow under-floor access.   What preparation for moving the rack will result in the least disruption to end-users?()

    • A、Initiate LPAR fallover to backup systems.
    • B、Use Live Partition Mobility to move the LPARs to other systems.
    • C、Use Live Application Mobility to move critical applications to alternate systems.
    • D、Back up all LPARS to a NIM server and restore them to other LPARs on other systems.

    正确答案:B

  • 第19题:

    单选题
    An HACMP cluster has three nodes of unequal size. The largest node is Node ’A’. The primary application on Node ’A’ has two components. One component is memory intensive, the other is IO intensive. Nodes ’B’ and ’C’ are running web servers and databases that access information produced by applications on Node ’A’. The customer requires the most performance from the primary application and wants all nodes available for fallover processing.  Which of the following is the best solution for meeting the customer requirements?()
    A

     Use nodes of equal size.

    B

     Create multiple resource groups and use loadlever.

    C

     Use dynamic node priority to manage resource groups.

    D

     Use an ordered list to manage resource group fallover.


    正确答案: D
    解析: 暂无解析

  • 第20题:

    单选题
    A customer has an existing rack environment with 18 x365 and 2 x255 servers.  How can the customer monitor and manage the hardware even if the systems are shut down?()
    A

    Use PC Anywhere over the Ethernet LAN.

    B

    Use RDM and Aurema to manage the systems.

    C

    Connect high-speed modems to each of the systems’ serial ports to use IBM Director.

    D

    Interconnect the Remote Supervisor Adapters II (RSA II) in the x365 servers to the x255 servers.


    正确答案: D
    解析: 暂无解析

  • 第21题:

    单选题
    A customer with a well-known brand wants to make sure they have a Green decision in their next IT infrastructure investment.   How can IBM Cool Blue help this customer? ()
    A

    Providing tools to plan, monitor, manage, and reduce power consumption.

    B

    Reducing cooling requirements by running CPUs at lower speeds.

    C

    Using smart system design to create high-power servers.

    D

    Adapting existing solutions like the Rear Door eXpander.


    正确答案: B
    解析: 暂无解析

  • 第22题:

    单选题
    The customer is consolidating their ten rack mount Windows servers into a VMware environment with four servers. The existing servers all have internal disk. The total amount of useable capacity is 5TB which is expected to increase to 10TB over the life of this asset. The customer will want to use the advanced features of VMware like VMotion. The customer is concerned about cost. Which of the following meets the customers needs?()
    A

    DS3500 with SAS Host Connection

    B

    DS3500 withiSCSI Host Connection

    C

    DS3500 with FC Connection

    D

    DS5020


    正确答案: D
    解析: 暂无解析

  • 第23题:

    单选题
    What are key benefits of IBM Systems Director Standard Edition?()
    A

    Backup data Manage problems Monitor network system

    B

    Report problems Manage servers and virtual environment Monitor the network 

    C

    Monitor system health and network Install and manage AIX and IBM i Manage energy consumption 

    D

    Monitor system health and network Manage servers and virtual environment Collect performance data


    正确答案: D
    解析: 暂无解析

  • 第24题:

    单选题
    A customer has 15 IBM x365 servers in a rack environment and is using IBM Director for systems management.  They require the ability to restart any server independent of the operating system.  Which of the following is the most cost-effective solution?()
    A

    Interconnect the service processors and use the IBM Director Agent

    B

    Install RSA II in each server and chain together the systems management processors

    C

    Install the RSA II in the top server and chain together the service processor interconnect

    D

    Install the IBM Director Agent on each server and use the remote control function to restart the servers


    正确答案: A
    解析: 暂无解析