x366
x255
x346
x455
第1题:
A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information, what additional items does the customer need to purchase? ()
第2题:
A customer’s small heterogeneous enterprise has grown over time to more than 500 client systems, and the administrator cannot add new servers to the management database. Which of the following is the most likely source of the problem?()
第3题:
A customer has a need for an xSeries server for an application requiring 12GB memory with the capacity of up to 20GB. The HDD configuration needs to be as follows: (1)Two drives RAID-1 for the operating system (2)Five drives for Data in a RAID-5 configuration with one Hot-Spare (3)All drives have to be internal. Which of the following will satisfy the requirements for the application?()
第4题:
When designing a single tier AIX database solution for a customer, what other technical specialist would be most instrumental in putting together a total solution and why?()
第5题:
A customer is installing a new x3850 X5 server and has purchased a warranty upgrade on the server to 24 x 7 four hour response. The customer requested IBM help with setting up the RAID adapter. The customer was told IBM would not help them. Which of the following should be verified first?()
第6题:
A customer is installing a new xSeries server into a Token-Ring environment. Where would the customer find the latest supported Token-Ring PCI adaptors for that server?()
第7题:
x366
x255
x346
x455
第8题:
x3250
x3200
x3650
x3400
第9题:
Software Rejuvenation
Capacity Manager
Capacity Workload Manager
Aurema Application Workload Manager
第10题:
IBM ServerProven hardware website
IEEE Proven website
IBM PartnerWorld website
3Com Support website
第11题:
Explain to the customer that they need an additional HMC for the POWER5 system.
Obtain a PO from the customer to purchase additional serial connections to the HMC.
Obtain a PO from the customer to purchase additional Ethernet connections to the HMC.
Explain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.
第12题:
pSeries and xSeries use different file systems. Consolidating Storage and backup is not achievable.
Consolidation is possible by connecting pSeries local storage to the xSeries SQL server using the IXA adapter.
Storage consolidation can be achieved by connecting the pSeries and xSeries servers to a common DS4000 storage server.
Storage consolidation is only achievable when raw file systems are used by the databases and both servers run the same Linux file system (e.g., EXT3 or Reiser).
第13题:
A customer is planning to upgrade two VMware ESX servers from 3.5 to 4.1 after recently installing a new XIV Storage System. Each server has 4 HBAs connected to redundant fabrics for a total of 4 paths per server to storage. The customer wants to increase the throughput available to the ESX servers. What configuration setting does the storage specialist need to highlight?()
第14题:
Customer purchased and x3650 M3 server and requires the ability to remotely power on and off the server. What if any additional hardware would the customer need to purchase to remotely power the server on and off?()
第15题:
A customer has 12 x445s and 20 x365s in their datacenter that are dedicated to production workloads. The customer wants to standardize on IBM Director as their Intel environment systems management platform. Which server platform is supported as a Director server?()
第16题:
A customer has the need for performance monitoring of an IBM System Storage DS8000. Which product does the customer need()
第17题:
A company has 20 remotely located Microsoft Windows 2000 xSeries servers which need to deploy a non-IBM software application from a Windows 2000 xSeries server. How would they take advantage of IBM Director to be able to effectively deploy this application?()
第18题:
You need to design a strategy for identifying the number of instances that any one SQL Server 2005 computer will support. What should you do?()
第19题:
An IBM BladeCenter H chassis for the JS22 Blade servers
A concurrent KVM daughter card
A pair of IBM BladeCenter Power Supplies
A second Management Module
第20题:
Contact the IBM FTSS to replace the drive
Contact the IBM CSR or SSR to replace the drive
Order a replacement drive
Contact IBM Service
第21题:
migration
collocation
compression
subfile backup
第22题:
Design the solution and present it confidently so the customer does not question it.
Design the solution and ensure the customer understands the unknowns with the new technology.
Explain to the customer that the VIO Server does not benefit them when doing server consolidation so it has not been configured.
Explain to the customer that the details surrounding the VIO Server have not been clearly defined so designing a solution is premature.
第23题:
The customer used their IBM Customer Number
The customer has activated their base warranty
The customer purchased Remote Technical Support Servicepac
The customer escalated the issue to the Duty Manager
第24题:
Install Windows 2003 using the F6 supply Mass Storage Controller option
Replace Customer’s deployment solution with Tivoli Provisioning Manager for OS Deployment Director Edition
Deploy Customer’s existing image and use UXSPi to update IBM specific drivers
Use ServerGuide to install Windows 2003