Running AIX 5.3 Implementing HACMP Implementing Static LPAR
Implementing Advanced POWER Virtualization Running Linux Attaching RIO drawers
Implementing VIO Server Implementing Dynamic LPAR Running with SMT turned On
Running AIX and Linux on the same system Implementing CoD Implementing Micro-Partitioning
第1题:
A customer wishes to replace 12 older small UNIX systems. They are running out of floor space in their data center and any solution must take this into consideration. Assuming that the applications are supported on all AIX versions, which of the following would best meet the customer’s requirements?()
第2题:
A customer wants to take advantage of IBM’s Micro-Partitioning capabilities for their new AIX applications. The pSeries technical specialist should recommend purchasing which of the following?()
第3题:
Companycom currently has three p650 servers in their environment and they are implementing a p5 595. The p650 servers are running in an SMP environment, but are connected to a pair of HMCs. In order to follow best practices in the enterprise server environment and maintain HMC connectivity to the p650s, what else will needs to be ordered in addition to the p5 595?()
第4题:
A customer needs a system supporting four partitions, each with the following requirements: ? 0.6 1.65GHz processors ? 2GB memory ? AIX 5.2 They also need the ability to grow the system in the future. Which pSeries system would be positioned best to meet this customer’s requirements?()
第5题:
Which of the following is the most cost effective required solution to support the boot disks internally for two partitions on a p5-520 running AIX 5.3 without the Advanced Virtualization feature?()
第6题:
Include a new HMC in the order to connect to the p5 595
Include a pair of new HMCs in the order to connect to the p5 595
Include a media set for POWER5 HMC in the order to upgrade one of the existing HMC’s to POWER5 capabilities
Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC to POWER5 capabilities Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC? To POWER5 capabilities
第7题:
The cluster must not be running.
The cluster.es.server.utils lpp must be installed.
The error notification module must be enabled in RSCT.
The permissions on /tmp/hacmp.out need to be changed to 774.
第8题:
Aurema Application Workload Manager
Remote Deployment Manager
Virtual Machine Manager
Capacity Manager
第9题:
POWER7 servers running AIX 5.3 operate in POWER5+ mode.
POWER7 servers running AIX 5.3 operate in POWER6 and POWER6+ mode.
POWER7 servers running AIX 5.3 operate in POWER5 and POWER6 modes.
POWER7 servers running AIX 5.3 operate in POWER6 and POWER7 modes.
第10题:
MPLS LDP must be enabled.
BGP routing protocol must be running.
Named access-lists must be configured.
Symmetrical routing is required.
Domain name must be defined
第11题:
Running AIX 5.3 Implementing HACMP Implementing Static LPAR
Implementing Advanced POWER Virtualization Running Linux Attaching RIO drawers
Implementing VIO Server Implementing Dynamic LPAR Running with SMT turned On
Running AIX and Linux on the same system Implementing CoD Implementing Micro-Partitioning
第12题:
p5-550 with the Advanced POWER Virtualization feature and AIX 5.2
p5-550 with the POWER5 processor technology and AIX 5.2
p5-570 with the Advanced POWER Virtualization feature and AIX 5.3
p5-570 with the POWER5 processor technology and AIX 5.2
第13题:
Which of the following is required to use Simultaneous Multi-Threading (SMT)?()
第14题:
An IT director is eager to adopt POWER7 servers because of their relative performance ratings and energy efficiency, but is concerned about migrating applications which require AIX 5.3. Which of the following will address his concern?()
第15题:
Companycom has a p690 server with unused fiber (HBA) host bus adapters (feature code 6228) that they would like to reuse. They are interested in implementing Advanced Power Virtualization features particularly Virtual IO. What is the best way to proceed?()
第16题:
A customer is implementing a POWER Blade solution which requires the VIO Server to be mirrored on internal disk drives. Which Blade supports the requirement?()
第17题:
Which of the following lists of items all require an HMC to function with POWER5?()
第18题:
JS21
JS23
PS700
PS701
第19题:
A p650 running AIX v5.3
A p5-550 running AIX v5.3
A p5-570 running Advanced POWER Virtualization
Multiple rack-mounted p615s running dynamic LPAR
第20题:
p5 hardware, AIX 5.2, Virtual I/O Server
POWER4 hardware, AIX 5.3, Virtual I/O Server,
p5 hardware, AIX 5.3, Advanced POWER Virtualization feature
POWER4 hardware, AIX 5.2, Advanced POWER Virtualization feature
第21题:
AIX 5.3 and Dynamic Logical Partitioning
AIX 5.2 and Dynamic Logical Partitioning
AIX 5.2 and Advanced POWER Virtualization feature
AIX 5.3 and Advanced POWER Virtualization feature
第22题:
Caching engines
QoS
Traffic shaping
Load balancing
第23题:
Upgrade the p690 to a p5 590 server running AIX 5.3
Upgrade the p690 server to AIX 5.3 and implement Advanced Power Virtualization
Purchase a p5 590 with minimum resources and simply reuse the p690 unused fiber HBA adapters
Purchase a p5 590 that has all the needed resources and adapters for Advanced Power Virtualization
第24题:
Optional 4-pack
7311-D20 RIO drawer
Optional 4-pack and a 7311-D20 RIO drawer
Optional 4-pack attached to a PCI SCSI card