One fibre channel switch
Two fibre channel switches
Two Ethernet cards
Nothing
第1题:
A customer is planning to upgrade two VMware ESX servers from 3.5 to 4.1 after recently installing a new XIV Storage System. Each server has 4 HBAs connected to redundant fabrics for a total of 4 paths per server to storage. The customer wants to increase the throughput available to the ESX servers. What configuration setting does the storage specialist need to highlight?()
第2题:
A customer requires a deskside solution that they will rack-mount in the future. Space is at a premium. The solution must support two AIX 5.2 applications that require two processors each. Which of the following deskside configurations should the pSeries Technical Specialist recommend?()
第3题:
A medium-sized company with 500 employees has a rapidly growing storage infrastructure with clustered mail, database, and file and print core business applications running on six servers. Using current direct attached SCSI storage pools to each server leads to inefficient utilization of storage space.They also have a backup device attached to each server. They want to consolidate their storage and backup infrastructure into a scalable, high availability and high performance solution. The customer’s top priorities are performance, cost, and availability. Which of the following backup solutions best satisfies the customer requirements?()
第4题:
Which of the following situations would suggest to a System x Sales Specialist that the customer could benefit from an iSCSI solution?()
第5题:
The account team is putting together a very complex solution for the customer. During the solution design phase, many of the customer’s requirements have changed and additional requirements are being identified. What should the pSeries technical specialist do to ensure the greatest possible customer satisfaction?()
第6题:
two child partitions with VHDs stored on an iSCSI SAN
two child partitions with volumes mounted from an iSCSI SAN
two host servers with iSCSI-attached storage enabled for Cluster Shared Volumes (CSVs)
two host servers with Fibre ChannelCattached storage enabled for Cluster Shared Volumes (CSVs)
第7题:
Design the solution and present it confidently so the customer does not question it.
Design the solution and ensure the customer understands the unknowns with the new technology.
Explain to the customer that the VIO Server does not benefit them when doing server consolidation so it has not been configured.
Explain to the customer that the details surrounding the VIO Server have not been clearly defined so designing a solution is premature.
第8题:
Implementing CoD
Using Express Configurations with processor upgrades
Meeting the minimum Value Pak rules
Engaging the pSeries representative to identify appropriate discounts
第9题:
Use eConfig to configure and validate each pSeries and p5 system.
Engage Advanced Technical Support to review any outstanding technical issues.
Confirm with the customer that the solution design meets their requirements.
Perform a Pre-Install Solution Assurance Review to validate required power requirements.
第10题:
What is the planned backup solution?
How many people manage the storage system?
What is the total planned capacity?
Is a shared storage subsystem under consideration?
第11题:
x3250
x3200
x3650
x3400
第12题:
increase the buffer credits on the HBAs
increase the number of device logins on the ESX servers
additional paths will be required between the servers and storage
multipath option on the ESX servers should be changed to round-robin
第13题:
A customer is interested in obtaining an AIX solution from IBM. They have two primary global requirements: ? Availability (although HACMP is not required) ? Low cost Which of the following approaches should the pSeries technical specialist use to meet the customer’s requirements and ensure customer satisfaction?()
第14题:
A company has two x346 servers each attached to their own EXP400 containing 367GB of raw SCSI storage. They want to consolidate their storage infrastructure into a scalable, high availability solution at minimum cost. Which of the following storage solutions best satisfies the customer’s requirements?()
第15题:
A customer has Direct Attached Storage (DAS) storage for their Windows servers. They are allocating money in next year’s budget for additional storage. Which of the following questions should be asked first to determine the proper storage solution to propose?()
第16题:
You are designing a Hyper-V solution. You plan to virtualize an application server. The application server requires failover clustering that uses shared storage. You need to choose the correct storage solution. What should you choose?()
第17题:
You are designing a Hyper-V solution. You plan to virtualize an application server. The application server requires failover clustering that uses shared storage. You need to choose the correct storage solution. What should you choose?()
第18题:
EXP3000 Local Attached Storage Enclosures
DS4000 Series storage solution
DS3000 Series Storage solution
DS4800 Storage Solution
第19题:
One fibre channel switch
Two fibre channel switches
Two Ethernet cards
Nothing
第20题:
A DS4000 SAN with flash copy enabled for volume mirroring
An iSCSI solution with dedicated backup server with SCSI attached tape library
A NAS solution with SCSI direct attached tape library with dedicated backup network
A DS4000 SAN with fibre channel attached tape library solution with dedicated backup zone
第21题:
Design the least-cost solution to prevent the competition from winning the business.
Design a disaster recovery (DR) solution and convince the customer why DR is important to their business.
Use the HACMP specialist to design the solution and include HA SmoothStart services as part of the proposal.
Design a solution with redundant parts and explain to the customer the incremental cost associated with the redundancy.
第22题:
The customer is looking for a fibre SAN solution to increase reliability and performance.
The customer wants to implement an energy-efficient solution to comply with their Go Green initiative.
The customer is cost-conscious and is looking for a centralized storage solution.
The customer is a large telecommunications firm and is looking to centralize storage for all their System x,System p,and mainframe servers.
第23题:
One p5-550 4-way
Two 2-way p5-520s
One p630 4-way
Two 2-way p615s
第24题:
Add redundant Fibre HBAs to each server and direct attach them to a DS4300 Turbo SAN solution
Add iSCSI cards to the servers and direct attach them to a DS300 dual controller model
Use clustered NAS solution with redundant gigabit network connections