The p655 supports only two LPARs.
The p655 supports only four LPARs.
There are not enough available slots for three LPARs.
There are not enough available slots for four LPARs.
第1题:
An SMB customer is looking for a low cost, easy to install and configure, entry-level SAN solution to attach to five rack-mounted System x Servers. Which storage solution would be best for this customer?()
第2题:
A customer is putting together a high-performance computing cluster of p655 nodes. They need a total of 48 processors and want to get the best performance possible out of those systems. They are evaluating four options and have asked the pSeries technical specialist to recommend which one would provide the best performance based on total rPerf. Their workload may grow over time. Which of the following should the pSeries technical specialist recommend?()
第3题:
A space-constrained customer is currently running AIX 5.2 on a number of p650 servers and a pair of new p5-550 servers. They have four identical new applications each requiring a minimum of seven processors and 96GB of memory. Which solution would best meet the customer’s requirements?()
第4题:
A customer is looking at an Oracle eBusiness solution. They would like to know what hardware they will need for the solution. They have some preliminary information from Oracle, including hardware requirements and specifics for their environment. Which of the following should be done next?()
第5题:
A customer is looking for a reliable well-performing, cost-effective solution to a growing commercial workload. Initially, they want to run 12 UDB partitions, each of which would need two processors and 8GB of memory. They are looking at the p655 and want to start with three LPARS on each p655 node using a total of four nodes. Each LPAR would need at least 4 x 6239 fibre cards and 2 x 5706 2-port 10/100/1000 Ethernet cards. At a later date, they want to add an additional LPAR to each node to expand to a total of 16 UDB partitions. Which of the following major limitations of this solution should be mentioned to the customer?()
第6题:
Which of the following situations would suggest to a System x Sales Specialist that the customer could benefit from an iSCSI solution?()
第7题:
The p655 is much more expensive than the other solutions.
The p655 would be at full capacity and would have no room for the growth.
The p655 is an HPC system and should never be used in a commercial situation.
The p655 does not support more than 20 adapters so could not accommodate the requirements.
第8题:
A
B
C
D
第9题:
x445 with four Xeon DP processors and 16GB of memory in a single SMP module
x445 with four Xeon MP processors and 16GB of memory in a single SMP module
x445 with two SMP modules each containing two Xeon DP processors and 8GB of memory
x445 with two SMP modules each containing two Xeon MP processors and 8GB of memory
第10题:
The p655 supports only two LPARs.
The p655 supports only four LPARs.
There are not enough available slots for three LPARs.
There are not enough available slots for four LPARs.
第11题:
edge
central
Layer2
Layer3
第12题:
x445 with four Xeon MP processors and 8GB of memory
x445 with four Xeon MP processors and 16GB of memory in a single SMP module
x445 with four Xeon DP processors and 16GB of memory in a single SMP module
x445 with two SMP modules each containing two Xeon DP processors and 8GB of memory
第13题:
A customer needs a new Microsoft Windows 2003 Server. They are running an application that requires substantial memory. They would like a rack mountable system, which will support four Xeon processors with 2MB of L3 cache. Which of the following is the minimum configuration to satisfy the customer’s requirements?()
第14题:
A customer needs a new database server. The database application has a high memory overhead but does not benefit from 8-way processing. They would like a rack mountable system, which will support four Xeon processors with 512KB of L2 cache and 16GB of main system memory. Which of the following will satisfy the customer’s requirements?()
第15题:
The pSeries technical specialist is discussing a proposed solution for a commercial application that contains the following options: p670, p690, and p5-570. The customer asks why a p655 was not considered as a solution. The customer’s requirements include the following: ? Eight 1.5 or 1.7GHz processors ? 64GB memory ? 12 fibre adapters ? 11 network adapters ? An estimated 25% growth in the next year What is the most appropriate response to the customer?()
第16题:
In which two environments would intra-partition parallelism be used? ()
第17题:
A customer is purchasing a 12-way p5-570 to run light development workloads on eight AIX 5.3 partitions with two network adapters each. When the current network configuration was reviewed, it was discovered that they only have four Ethernet ports available on their network switch. Which of the following solutions would prevent them from having to buy another network switch or hub?()
第18题:
EXP3000 Local Attached Storage Enclosures
DS4000 Series storage solution
DS3000 Series Storage solution
DS4800 Storage Solution
第19题:
Twelve 4-way p655 nodes and add more as needed
Six 8-way p655 nodes and add more as needed
Six 4-way p655 nodes with four processors CoD on each node in case of growth
Three 8-way p655 nodes with eight processors CoD on each node in case of growth
第20题:
Two p670 servers
Four p650 servers
Two p5-570 servers
Four p5-550 servers
第21题:
p655 4-way nodes
p655 8-way nodes
p5-570 4-way nodes
p5-570 8-way nodes
第22题:
Add two HMCs with two Ethernet adapters each and run EtherChannel for the original eight partitions.
Add two HMCs with two Ethernet adapters each and run Virtual Ethernet for the original eight partitions.
Add two hosting partitions with two Ethernet adapters each and run EtherChannel for the original eight partitions.
Add two hosting partitions with two Ethernet adapters each and run Virtual Ethernet for the original eight partitions.
第23题:
The customer is looking for a fibre SAN solution to increase reliability and performance.
The customer wants to implement an energy-efficient solution to comply with their Go Green initiative.
The customer is cost-conscious and is looking for a centralized storage solution.
The customer is a large telecommunications firm and is looking to centralize storage for all their System x,System p,and mainframe servers.
第24题:
wide transport
metroethernet
frame relay
leaseD line
MPLS