The technical specialist has supported multiple Cluster 1350 environments. References will be provided.
The technical specialist is Linux-certified by two industry groups. Certificate copies will be provided.
The technical specialist has worked on multiple UNIX consolidation projects. References will be provided.
The technical specialist has worked on Linux consolidation efforts. References will be provided.
第1题:
A customer needs both a database and application server to communicate over a network. The new systems will be connected to the same network as the current IBM equipment with known IBM serial numbers. How could a pSeries technical specialist best determine which type of network card is appropriate, without making an additional call to the customer?()
第2题:
A hospital customer with an experienced AIX and Microsoft Windows staff wants to consolidate all of their file/print services onto fewer systems. They currently use multiple Microsoft Windows-based Intelsystems that are experiencing reliability problems. They also have POWER4+ systems that are running multiple AIX LPARs that have experienced no reliability issues. They need at least 99.99% uptime. Which solution will meet their uptime needs at the lowest cost?()
第3题:
A System x sales specialist is creating a proposal for a Unix-installed account. The customer is looking to migrate several business-critical applications onto Linux running on Intel. Which of the following should help IBM meet the customer’s requirements?()
第4题:
When designing a single tier AIX database solution for a customer, what other technical specialist would be most instrumental in putting together a total solution and why?()
第5题:
A customer needs an Oracle Database Server. Based on the customer’s sizing data, the IBM Oracle Competency Center has determined that the server requirements can be met with a 4-way p5-550 or a 4-way p5-570. If the pSeries technical specialist proposes a p5-570 versus a p5-550 system, what key differences should be pointed out to the customer?()
第6题:
xSeries specialist,as the customer may have some Intel-based systems.
Hardware customer engineer,as they will be installing the entire solution.
Services specialist,as they can provide education recommendations for the entire solution.
Storage specialist,as the customer may need disk to store the data and tape to backup the data.
第7题:
LPAR Validation Tool (LVT)
Personal Systems Configurator (PSC)
IBM Configuration for eBusiness (eConfig)
Advanced System Management Interface (ASMI)
第8题:
Sales Manual
Announcement Letter
Site and Hardware Planning Information
Adapter, Devices, and Cable Information for Multiple Bus Systems
第9题:
Combine the file/print servers onto a larger Intel-based machine (x445).
Bring up a Linux LPAR on the pSeries and run Samba to provide file/print services.
Bring up another AIX LPAR on the pSeries and run Samba to provide file/print services.
Bring up another AIX LPAR on the pSeries and run Connect Direct to provide file/print services.
第10题:
Request that the pSeries technical specialist provide the discount percentage to the customer.
Run both eConfig and PCRS6000 to ensure that both configurators provide the same upgrade quote.
Confirm with the customer that the installed inventory accurately reflects what is actually installed.
Provide options to the customer so they can choose the most appropriate upgrade for their environment.
第11题:
Create a POWER5 technical presentation for the account executive’s use.
Mentor the account executive with the most important POWER5 features and benefits.
Attend the meeting instead of the account executive to present the POWER5 features and benefits.
Join the meeting via teleconference at a prescheduled time to present the POWER5 features and benefits.
第12题:
Use an Inventory Services retrieval to show adapter features.
Retrieve previous eConfig proposals to see what others had shown.
Call the Account Executive to ask what the customer has used in the past.
Query the Supportline problem record database for the customer and LAN keyword matches.
第13题:
A customer wants to upgrade an existing pSeries system. In addition to retrieving the IBM configuration records, what else should be done to ensure an accurate upgrade quote is provided?()
第14题:
A customer has two locations that host their pSeries servers. Traffic is being routed through the public Internet. The customer needs to exchange confidential financial data between the servers. Which of the following solutions should the pSeries technical specialist propose to the customer to secure the data?()
第15题:
A customer is getting ready to install a new pSeries system into their data center. They are concerned about providing the appropriate clearance around their 7014-T42 to allow for maintenance. What reference material should the pSeries technical specialist provide to the customer?()
第16题:
The account team designed a p5-570 solution to strategically position the customer for future IBM announcements. The customer was dissatisfied upon implementing the solution. An AIX v5.1 partition was added to the requirements halfway through the solution design process and it was not considered in the final design. What should the pSeries technical specialist have done to prevent this situation?()
第17题:
The account team is putting together a very complex solution for the customer. During the solution design phase, many of the customer’s requirements have changed and additional requirements are being identified. What should the pSeries technical specialist do to ensure the greatest possible customer satisfaction?()
第18题:
IBM Techline
IBM Supportline
IBM Software Distribution
IBM Hardware Support
第19题:
The 1-way p615 cannot be upgraded to a 2-way p615.
The 1-way p615 can be upgraded to a 2-way p615 should additional capacity be required.
The p615 can be upgraded to a POWER5-based processor.
The p615 is not a good solution, as it does not take advantage of the Advanced POWER Virtualization features.
第20题:
The technical specialist has supported multiple Cluster 1350 environments. References will be provided.
The technical specialist is Linux-certified by two industry groups. Certificate copies will be provided.
The technical specialist has worked on multiple UNIX consolidation projects. References will be provided.
The technical specialist has worked on Linux consolidation efforts. References will be provided.
第21题:
A DCE domain
A Kerberos domain
A PPP tunnel between the servers
An IPSEC tunnel between the servers
第22题:
Use eConfig to configure and validate each pSeries and p5 system.
Engage Advanced Technical Support to review any outstanding technical issues.
Confirm with the customer that the solution design meets their requirements.
Perform a Pre-Install Solution Assurance Review to validate required power requirements.
第23题:
Submitted an RPQ (Request for Quote) for AIX v5.1 support on a p5-570
Designed a p670 because it supports AIX 5.1 partitions
Initially designed a solution supporting AIX 5.1 partitions
Gained customer approval for the final design prior to ordering the system
第24题:
The p5-570 is rack mounted but the p5-550 is not.
The p5-570 will provide more growth, but at a higher cost.
The p5-570 is 200-240 volt only and the p5-550 is 110 volt only.
The p5-570 needs a special feature to become a deskside machine.