单选题A space-constrained customer is currently running AIX 5.2 on a number of p650 servers and a pair of new p5-550 servers.  They have four identical new applications each requiring a minimum of seven processors and 96GB of memory.  Which solution would be

题目
单选题
A space-constrained customer is currently running AIX 5.2 on a number of p650 servers and a pair of new p5-550 servers.  They have four identical new applications each requiring a minimum of seven processors and 96GB of memory.  Which solution would best meet the customer’s requirements?()
A

Two p670 servers

B

Four p650 servers

C

Two p5-570 servers

D

Four p5-550 servers


相似考题
更多“A space-constrained customer is currently running AIX 5.2 on”相关问题
  • 第1题:

    The /etc/qconfig file needs to be modified on a busy AIX print server with 30 printers attached.  What action should be performed before modifying this file()

    • A、lpstat; Record the currently running jobs
    • B、enq -D
    • C、enq -X
    • D、enq -h -p

    正确答案:B

  • 第2题:

    A p5 570 customer is currently running AIX 5.3. The customer now wants to add Virtual Ethernet to two of the LPARs. This will enable the application tier can communicate to the database tier without using an external Ethernet card. What is the best way to accomplish this task?()

    • A、Create a VIO server
    • B、Modify the LPAR profiles to add a Virtual Ethernet adapter
    • C、Buy the Advanced Power Virtualization feature and enter a authorization code at the HMC
    • D、Buy the Advanced Power Virtualization feature and enter a authorization code at the service  processor menu

    正确答案:B

  • 第3题:

    A customer wants to take advantage of IBM’s Micro-Partitioning capabilities for their new AIX applications.   The pSeries technical specialist should recommend purchasing which of the following?()

    • A、p5 hardware, AIX 5.2, Virtual I/O Server
    • B、POWER4 hardware, AIX 5.3, Virtual I/O Server,
    • C、p5 hardware, AIX 5.3, Advanced POWER Virtualization feature
    • D、POWER4 hardware, AIX 5.2, Advanced POWER Virtualization feature

    正确答案:C

  • 第4题:

    A customer is having problems after an AIX version upgrade from 5.2 to 5.3.  Which of the following should the pSeries technical specialist recommend that the customer call?()

    • A、IBM Techline
    • B、IBM Supportline
    • C、IBM Software Distribution
    • D、IBM Hardware Support

    正确答案:B

  • 第5题:

    A customer needs a system supporting four partitions, each with the following requirements: ? 0.6 1.65GHz processors ? 2GB memory ? AIX 5.2 They also need the ability to grow the system in the future.  Which pSeries system would be positioned best to meet this customer’s requirements?()

    • A、p5-550 with the Advanced POWER Virtualization feature and AIX 5.2
    • B、p5-550 with the POWER5 processor technology and AIX 5.2
    • C、p5-570 with the Advanced POWER Virtualization feature and AIX 5.3
    • D、p5-570 with the POWER5 processor technology and AIX 5.2

    正确答案:D

  • 第6题:

    A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()

    • A、PowerVM Standard Edition
    • B、VMControl Standard Edition
    • C、Hardware Management Console
    • D、IBM Systems Director Standard Edition

    正确答案:D

  • 第7题:

    Companycom wants the application server LPAR to communicate with the database LPAR on a p5 590 without using network adapters. What does the customer need to install?()

    • A、VIO Server
    • B、AIX 5.2 ML4
    • C、Shared Ethernet Adapter
    • D、AIX 5.3 with Advanced Power Virtualization

    正确答案:D

  • 第8题:

    A customer is adding a new p5 machine to their environment.  The machine will host several DB2 partitions running AIX 5.2.  They currently have two SAN directors and an IBM ESS.  The SAN design allows for concurrent maintenance.  What is required on each partition to attach to the SAN?()

    • A、A minimum of two HBAs; the customer will need to download SDD
    • B、A minimum of four HBAs; the customer will need to download SDD
    • C、A minimum of two HBAs; the customer will need to configure MPIO
    • D、A minimum of four HBAs; the customer will need to configure MPIO

    正确答案:A

  • 第9题:

    单选题
    Companycom is planning on upgrading from a pSeries S85 running AIX 4.3.3 to a p5 570 with an HMC. The new server will run AIX 5L 5.2. What should be performed prior to the migration?()
    A

    Verify the ISV application runs on AIX 5.2

    B

    Power4 to POWER5 upgrades are not supported without a application recompile

    C

    Check the placement and size of the boot logical volume and disk space requirements on the S85

    D

    AIX 4.3.3 to AIX 5L 5.2 migrations are perfectly compatible so nothing needs to be checked


    正确答案: D
    解析: 暂无解析

  • 第10题:

    单选题
    A customer wishes to replace 12 older small UNIX systems.  They are running out of floor space in their data center and any solution must take this into consideration.  Assuming that the applications are supported on all AIX versions, which of the following would best meet the customer’s requirements?()
    A

    A p650 running AIX v5.3

    B

    A p5-550 running AIX v5.3

    C

    A p5-570 running Advanced POWER Virtualization

    D

    Multiple rack-mounted p615s running dynamic LPAR


    正确答案: B
    解析: 暂无解析

  • 第11题:

    单选题
    A customer is adding a new p5 machine to their environment.  The machine will host several DB2 partitions running AIX 5.2.  They currently have two SAN directors and an IBM ESS.  The SAN design allows for concurrent maintenance.  What is required on each partition to attach to the SAN?()
    A

    A minimum of two HBAs; the customer will need to download SDD

    B

    A minimum of four HBAs; the customer will need to download SDD

    C

    A minimum of two HBAs; the customer will need to configure MPIO

    D

    A minimum of four HBAs; the customer will need to configure MPIO


    正确答案: A
    解析: 暂无解析

  • 第12题:

    单选题
    A system administrator will be migrating a server from AIX 5.1 to AIX 5.2 and is uncertain if the application running on the server will function properly after the migration. What is the fastest way to return to the previous AIX level if the application does not work?()
    A

    Use base media to restore system to AIX 5.1.

    B

    Use an alt_disk_install and boot back to the AIX 5.1 rootvg.

    C

    Make a mksysb of the original AIX to restore back to the AIX 5.1 level.

    D

    Perform the AIX 5.2 upgrade using update_all with the commit option and reject filesets to return to AIX 5.1.


    正确答案: B
    解析: 暂无解析

  • 第13题:

    Companycom is migrating from p670 systems running AIX 5.2 to p5 595 systems running AIX 5.3. They will be changing out only the system units. They will re-use the existing 61D drawers and adapters with the new p5 595 systems. What compatibility issue must be considered?() 

    • A、APV features are not supported for some legacy POWER4 adapters
    • B、APV will require the most current maintenance level for AIX 5.2
    • C、APV features will require that legacy POWER4 adapters be updated with new microcode
    • D、The Virtual IO Server must run AIX 5.3 and the LPARs can run either AIX 5.2 or AIX 5.3

    正确答案:A

  • 第14题:

    A customer wishes to replace 12 older small UNIX systems.  They are running out of floor space in their data center and any solution must take this into consideration.  Assuming that the applications are supported on all AIX versions, which of the following would best meet the customer’s requirements?()

    • A、A p650 running AIX v5.3
    • B、A p5-550 running AIX v5.3
    • C、A p5-570 running Advanced POWER Virtualization
    • D、Multiple rack-mounted p615s running dynamic LPAR

    正确答案:C

  • 第15题:

    Company.com has four pSeries servers in their data center and wants to deploy multiple Micro-Partitions.  Which of the following data center servers can be used for this purpose?()

    • A、p5-520 running Virtual I/O Server
    • B、p690 running AIX 5L V5.3
    • C、p5-510 running AIX 5L V5.2
    • D、p5-520 running two dedicated processor partitions

    正确答案:A

  • 第16题:

    A system administrator has just finished upgrading a system to AIX 5.2. If there are future problems, the system administrator would like to add an entry to the AIX errorlog to record this event. Which of the following commands can be issued for this purpose?()

    • A、/usr/bin/errmsg "System upgraded to AIX 5.2"
    • B、/usr/bin/errlog "System upgraded to AIX 5.2"
    • C、/usr/bin/errupdate "System upgraded to AIX 5.2"
    • D、/usr/bin/errlogger "System upgraded to AIX 5.2"

    正确答案:D

  • 第17题:

    A space-constrained customer is currently running AIX 5.2 on a number of p650 servers and a pair of new p5-550 servers.  They have four identical new applications each requiring a minimum of seven processors and 96GB of memory.  Which solution would best meet the customer’s requirements?()

    • A、Two p670 servers
    • B、Four p650 servers
    • C、Two p5-570 servers
    • D、Four p5-550 servers

    正确答案:C

  • 第18题:

    Companycom is planning on upgrading from a pSeries S85 running AIX 4.3.3 to a p5 570 with an HMC. The new server will run AIX 5L 5.2. What should be performed prior to the migration?()

    • A、Verify the ISV application runs on AIX 5.2
    • B、Power4 to POWER5 upgrades are not supported without a application recompile
    • C、Check the placement and size of the boot logical volume and disk space requirements on the S85
    • D、AIX 4.3.3 to AIX 5L 5.2 migrations are perfectly compatible so nothing needs to be checked

    正确答案:A

  • 第19题:

    Companycom tells the technical sales specialist that recent announcements state that virtual lan in the datacenter is the best option. The customer wants to use interpartition communication to save on adapters and increase performance. The systems are going to have shared and dedicated processor partitions. Some of the partitions will be running AIX 5.2 and some will be running AIX 5.3. The second p5 590 will be running a mixture of AIX 5.3 and Linux partitions with 2.6 kernel. What limitations of vlan/interpartition  communication should be discussed with this customer?()

    • A、Virtual Ethernet uses the system processors for all communication functions instead of offloading that load to processors on network adapter cards. Virtual Ethernet is supported on AIX 5L and Linux 2.5 and above. 
    • B、Virtual Ethernet can be used within groups of shared OR groups of dedicated processor partitions, but not both simultaneously. Virtual Ethernet comes with AIX 5L, and is supported in AIX 5.2 or AIX 5.3 partitions, but not Linux. 
    • C、Virtual Ethernet can be used in both shared and dedicated processor partitions. Virtual Ethernet can run in an AIX 5.3 or Linux 2.6 Kernel, but not AIX 5.2 partitions. Virtual Ethernet can only connect partitions within a single system. 
    • D、Virtual Ethernet uses the system processors for all communication functions instead of offloading that load to processors on network adapter cards. Virtual Ethernet can connect partitions between systems if the HMC is shared between systems.

    正确答案:C

  • 第20题:

    A customer has a pSeries that needs to be upgraded from AIX Version 5.1 to AIX Version 5.2. The customer wants to retain /etc/passwd. Which of the following installation types should be used?()

    • A、Preservation Install
    • B、Retention Install
    • C、Overwrite Install
    • D、Migration Install

    正确答案:D

  • 第21题:

    单选题
    Companycom has a p690 and currently has eight LPARs. They have purchased a p5 590 and wish to migrate their eight LPARs to the new server. The LPARs are running either AIX 5.2 or AIX 5.3 with the current maintenance. What is the LEAST disruptive method for this activity?()
    A

    New install of AIX

    B

    Migrate the 7040-61D

    C

    Utilize alt_disk_install

    D

    Use the enterprise back up strategy


    正确答案: D
    解析: 暂无解析

  • 第22题:

    单选题
    A customer needs a system supporting four partitions, each with the following requirements: ? 0.6 1.65GHz processors ? 2GB memory ? AIX 5.2 They also need the ability to grow the system in the future.  Which pSeries system would be positioned best to meet this customer’s requirements?()
    A

    p5-550 with the Advanced POWER Virtualization feature and AIX 5.2

    B

    p5-550 with the POWER5 processor technology and AIX 5.2

    C

    p5-570 with the Advanced POWER Virtualization feature and AIX 5.3

    D

    p5-570 with the POWER5 processor technology and AIX 5.2


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    Companycom has a system running AIX 5.2 and wants to upgrade to AIX 5.3. What method would provide the quickest recovery if the upgrade failed?()
    A

    Use alt_disk_install

    B

    Backup image to NIM server

    C

    Backup using mksysb to DVD-RAM

    D

    Apply the upgrade and do not commit


    正确答案: C
    解析: 暂无解析

  • 第24题:

    单选题
    A customer is running Microsoft Windows 2003, Sun Solaris, and IBM AIX with a total capacity of20 TB. This customer needs high availability for e-business applications. The servers are currently connected to two EMC Symmetrix subsystems that are running RAID 1. The customer wants to consolidate all storage into an IBM System Storage DS8700. How many Fibre Channel drive sets are needed to satisfy the total capacity for this customer?()
    A

    8 drive sets of 300 GB drives

    B

    4 drive sets of 300 GB drives

    C

    14 drive sets of 146 GB drives

    D

    18 drive sets of 146 GB drives


    正确答案: C
    解析: 暂无解析