RDAC
MPIO
SSPC
SDDPCM
第1题:
retail company plans to consolidate 180 existing dual processor Xeon servers, all running a web server application on Windows Server 2003. They are planning consolidating to a single x3950 X5 running vSphere.Which of the following should be discussed with this customer? ()
第2题:
A customer needs to deploy ten dual processor Xeon servers. Six servers will be running Linux and Apache, and the other four will be Citrix presentation servers. The customer’s main concerns are the rack space and the option to have SATA drives. The maximum memory required is 8GB. Which of the following options will provide the best price and performance?()
第3题:
A customer has requested five rack mounted servers, and a rack. They want redundant power connections. Which of the following is required to meet these requirements?()
第4题:
A customer is running a number of non-IBM servers purchased two years ago and has settled on one of the new IBM xSeries servers as a migration path. From the following options, which is the preferred migration path?()
第5题:
A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers. Which of the following would be most appropriate to ask first?()
第6题:
Your company plans to deploy eight file servers that run Windows Server 2008 R2. All file servers will connect to Ethernet switches. You need to plan a data storage solution that meets the followingrequirements: èAllocates storage to the servers as needed èUtilizes the existing network infrastructure èMaximizes performance èMaximizes fault tolerance Which actions should you include in your plan?()
第7题:
You are designing a Windows Server 2008 R2 Hyper-V environment. Your design includes a failover cluster that supports live migration. You need to ensure that the network supports this design. What should you do?()
第8题:
one install image file that contains three install images
one install image file that contains a single install image
two install image files that each contain a single install image
three install image files that each contain a single install image
第9题:
HACMP for AIX
PowerVM Enterprise Edition
IBM Management Edition for AIX
Workload Partition Manager for AIX
第10题:
Use two iSCSI host bus adapters
Use two Fibre Channel host bus adapters
Place the physical host servers on the same TCP/IP subnet
Place the physical host servers on different TCP/IP subnets
第11题:
PowerPath
Subsystem Device Driver Device Specific Module
Subsystem Device Driver Path Control Module
DeviceMapper Multipath
第12题:
2
4
6
8
第13题:
A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers.Which of the following would be most appropriate to ask first?()
第14题:
A customer recently acquired two Power servers and plans to implement AIX 6.1 and Live Application Mobility. What other product is required to accomplish this objective? ()
第15题:
A banking customer has the following requirements for an IBM BladeCenter solution with high speed fibre channel: (1)four 4-socket Microsoft SQL servers with two hot swap SAS drives (2)two physical Microsoft Active Directory Servers (3)twenty-two physical Citrix servers (4)three physical Web servers (5)one physical vCenter server (6)eight vSphere hosts Which configuration minimally satisfies these requirements?()
第16题:
A customer has the following non-virtualized servers: - three Exchange servers, each with 2.8 TB database - five System i Domino servers, each with 2 TB database - 20 TB usable capacitySun/SAP cluster - 70 TB usable capacity of System p requirement - annual growth rate of 12 TB usable capacity per year What is the most cost-effective solution for three years()
第17题:
A customer wants to directly attach five servers to an IBM System Storage DS8100. They do not intend to use any SAN switches and would like the servers to have a redundant connection to the IBM DS8100. What is the minimum number of DS8000 host adapter cards that the customer will require()
第18题:
Your company purchases 15 new 64-bit servers as follows: èFive of the servers have a single processor. èFive of the servers have a single dual core processor. èFive of the servers have two quad core processors. You plan to deploy Windows Server 2008 R2 on the new servers by using Windows Deployment Services (WDS). You need to recommend a WDS install image strategy that meets the following requirements: Minimizes the number of install images Supports the deployment of Windows Server 2008 R2 What should you recommend?()
第19题:
RDAC
MPIO
SSPC
SDDPCM
第20题:
Redundant power supplies on the servers
Redundant PDUs in the rack
edundant power supplies in the servers and redundant PDUs in the rack
Redundant power supplies in the servers, redundant PDUs in the rack, and Active Energy Manager (AEM)
第21题:
Three IBMBladeCenter S chassis, three Brocade Fibre modules, six Ethernet modules
Three IBMBladeCenter E chassis, three Brocade Fibre modules, six Ethernet modules
Four IBMBladeCenter H chassis, four QLogic Fibre Channel modules, eight Ethernet modules
Three IBMBladeCenter H chassis, three QLogic Fibre Channel modules, six Ethernet modules
第22题:
Is the web content static or dynamic information
Consider two servers for redundancy and failover
What is the average CPU utilization of the existing web servers
Will the servers need a SCSI or Fibre Channel storage solution
第23题:
Copy the image of the non-IBM servers and copy that image to the IBM servers, then reboot the IBM servers.
Copy the image from the non-IBM servers with RDM and install them with IBM Director to the new IBM servers. Reboot the IBM servers.
Install a fresh operating system using ServerGuide, and then install the applications and copy the data from the old servers.
Install a fresh operating system on the IBM servers and then run ServerGuide on the IBM servers to migrate the applications and data to the IBM servers.