niusouti.com

单选题A customer would like to configure an uncapped LPAR so that it can use 2 to 8 cores depending on the workload characteristics.  With SMT4 enabled, what is the least amount of processing resources which can be configured for the LPAR?()A 8 desired proce

题目
单选题
A customer would like to configure an uncapped LPAR so that it can use 2 to 8 cores depending on the workload characteristics.  With SMT4 enabled, what is the least amount of processing resources which can be configured for the LPAR?()
A

8 desired processing units and 8 desired virtual processors

B

2 desired processing units and 8 desired virtual processors

C

8 desired processing units and 32 desired virtual processors

D

2 desired processing units and 32 desired virtual processors


相似考题
更多“单选题A customer would like to configure an uncapped LPAR so that it can use 2 to 8 cores depending on the workload characteristics.  With SMT4 enabled, what is the least amount of processing resources which can be configured for the LPAR?()A 8 desired proce”相关问题
  • 第1题:

    A customer is evaluating PowerVM and VMware to run a data warehouse application. Which feature of PowerVM should be highlighted as a differentiator?()

    • A、PowerVM offers partition mobility.
    • B、PowerVM can virtualize network and SAN resources.
    • C、PowerVM supports multiple operating systems running concurrently.
    • D、PowerVM allows an LPAR to use activated cores and memory without limitation.

    正确答案:D

  • 第2题:

    Which one of these statements is true regarding hot pluggable PCIe and PCI-X slots in a Power 550?()

    • A、Cards can be added and then enabled via Hardware Management Console (HMC) GUI or command line. 
    • B、The HMC allows access to the Advanced System Management Interface (ASMI), where the slots can be managed. 
    • C、If the empty slot was already allocated to an LPAR, the LPAR can use the card after the cfgmgr script has been run. 
    • D、The Hardware Management Console (HMC) GUI can guide a customer through the process of adding a card to an empty slot. 

    正确答案:B

  • 第3题:

    A customer has an LPAR with 4 dedicated cores on a POWER7 server with SMT4 enabled. How many logical processors are presented to an application running on this LPAR?()

    • A、4
    • B、8
    • C、16
    • D、32

    正确答案:C

  • 第4题:

    A retail customer has an 8-core Power 740 server with 2 partitions. Production has 4 dedicated cores and the test partition has 2 dedicated cores. Both partitions run during the day without problems. At night, batch processing is exceeding the run window. Which solution addresses this problem without requiring additional hardware?()

    • A、AddingVMControl will automate processor resource allocation during peak workloads.
    • B、Enable Dynamic Symmetric Multithreading in the HMC to balance workloads across processors.
    • C、Add processing resources during the times they are required using Utility Capacity on Demand.
    • D、Changing the partitions to Uncapped can make use of additional processor cycles during peak workloads.

    正确答案:D

  • 第5题:

    A customer would like to configure an uncapped LPAR so that it can use 2 to 8 cores depending on the workload characteristics.  With SMT4 enabled, what is the least amount of processing resources which can be configured for the LPAR?()

    • A、8 desired processing units and 8 desired virtual processors
    • B、2 desired processing units and 8 desired virtual processors
    • C、8 desired processing units and 32 desired virtual processors
    • D、2 desired processing units and 32 desired virtual processors

    正确答案:B

  • 第6题:

    Company.com would like to have the processor resources on their system efficiently shared between logical partitions, but does not require management of memory or I/O resources. Which of the following would accomplish this requirement?()

    • A、HMC command line
    • B、Uncapped processors
    • C、Partition Load Manager
    • D、Enterprise Workload Manager

    正确答案:B

  • 第7题:

    单选题
    Which one of these statements is true regarding hot pluggable PCIe and PCI-X slots in a Power 550?()
    A

    Cards can be added and then enabled via Hardware Management Console (HMC) GUI or command line. 

    B

    The HMC allows access to the Advanced System Management Interface (ASMI), where the slots can be managed. 

    C

    If the empty slot was already allocated to an LPAR, the LPAR can use the card after the cfgmgr script has been run. 

    D

    The Hardware Management Console (HMC) GUI can guide a customer through the process of adding a card to an empty slot. 


    正确答案: C
    解析: 暂无解析

  • 第8题:

    单选题
    A customer would like to configure an uncapped LPAR so that it can use 2 to 8 cores depending on the workload characteristics. With SMT4 enabled, what is the least amount of processing resources which can be configured for the LPAR?()
    A

    8 desired processing units and 8 desired virtual processors

    B

    2 desired processing units and 8 desired virtual processors

    C

    8 desired processing units and 32 desired virtual processors

    D

    2 desired processing units and 32 desired virtual processors


    正确答案: A
    解析: 暂无解析

  • 第9题:

    单选题
    An administrator has installed 1 VIO Server and 5 client LPARs on a 16-core Power 570 with the following CPU requirements: Virtual Processors Processing Units Min Desired Max Min Desired Max VIOS1 1 2 4 0.1 1.0 2.0 LPAR1 4 4 4 4.0 4.0 4.0 LPAR2 2 5 8 1.0 5.0 6.0 LPAR3 1 3 4 0.1 0.3 1.0 LPAR4 3 6 9 0.5 3.0 6.0 LPAR5 1 3 6 1.0 3.0 .06 If the administrator activates the LPARs in the above order,  what will be the result? ()
    A

     All LPARs will start except LPAR5.

    B

     All LPARs will start with desired capacity.

    C

     All LPARs will start but LPAR5 will have its minimum capacity assigned.

    D

     All LPARs will start but LPAR5 will have less than its desired capacity.


    正确答案: A
    解析: 暂无解析

  • 第10题:

    单选题
    A customer is evaluating PowerVM and VMware to run a data warehouse application. Which feature of PowerVM should be highlighted as a differentiator?()
    A

    PowerVM offers partition mobility.

    B

    PowerVM can virtualize network and SAN resources.

    C

    PowerVM supports multiple operating systems running concurrently.

    D

    PowerVM allows an LPAR to use activated cores and memory without limitation.


    正确答案: C
    解析: 暂无解析

  • 第11题:

    单选题
    A customer would like to share the processor resources automatically between logical partitions.  Which of the following would accomplish this requirement without user interaction? ()
    A

     Dynamic LPARs

    B

     On/Off Capacity on Demand

    C

     Uncapped Micro-Partitioning

    D

     Enterprise Workload Manager


    正确答案: C
    解析: 暂无解析

  • 第12题:

    单选题
    Companycom is planning a p5 595 running AIX 5L 5.3 LPARs. They would like to design the system using physical resources with maximum resource efficiency. One LPAR requires a peak load of 30 processors during the week with a low of 1 processor required on the weekend. The other LPAR requires only a single processor most of the time, but needs at least 24 processors at the beginning of the weekend to finish its weekly processing in the window allocated. Which of the following solutions is most appropriate to continuously maximize resource use for these two LPARs?()
    A

    Dynamic LPAR

    B

    Workload Manager

    C

    Partition Load Manager

    D

    Shared Processor Pools


    正确答案: C
    解析: 暂无解析

  • 第13题:

    A customer has shut down an LPAR after using DLPAR to add or remove processor and memory resources. When the partition is reactivated, the desired changes are missing. What action, or sequence of actions, will immediately and permanently solve this problem?()

    • A、Add or remove the resources in the profile, click 'apply', then 'save'.
    • B、Add or remove the resources using DLPAR and change the partition profile.
    • C、Add or remove the resources using DLPAR, then shutdown and reactivate the LPAR.
    • D、Add or remove the resources in the system profile and reboot the managed system.

    正确答案:B

  • 第14题:

    A customer wants to run DB2 on a Power 780 with uncapped partitions. They have licensed DB2 for 32 of the 64 active cores, and will use it in multiple partitions.   How can the customer ensure that the number of licenses purchased for DB2 is not exceeded?()

    • A、Create a 32-core shared processor pool for the DB2 partitions.
    • B、Limit the number of virtual processors on each DB2 partition to 32.
    • C、Use the IBM License Metric Tool to dynamically manage DB2 usage in the partitions.
    • D、Set the ‘Desired Processing Units’ in each DB2 partition profile so that the sum of all partitions equals 32.

    正确答案:A

  • 第15题:

    An administrator has installed 1 VIO Server and 5 client LPARs on a 16-core Power 570 with the following CPU requirements: Virtual Processors Processing Units Min Desired Max Min Desired Max VIOS1 1 2 4 0.1 1.0 2.0 LPAR1 4 4 4 4.0 4.0 4.0 LPAR2 2 5 8 1.0 5.0 6.0 LPAR3 1 3 4 0.1 0.3 1.0 LPAR4 3 6 9 0.5 3.0 6.0 LPAR5 1 3 6 1.0 3.0 .06 If the administrator activates the LPARs in the above order,  what will be the result? ()

    • A、 All LPARs will start except LPAR5.
    • B、 All LPARs will start with desired capacity.
    • C、 All LPARs will start but LPAR5 will have its minimum capacity assigned.
    • D、 All LPARs will start but LPAR5 will have less than its desired capacity.

    正确答案:D

  • 第16题:

    Companycom is planning a p5 595 running AIX 5L 5.3 LPARs. They would like to design the system using physical resources with maximum resource efficiency. One LPAR requires a peak load of 30 processors during the week with a low of 1 processor required on the weekend. The other LPAR requires only a single processor most of the time, but needs at least 24 processors at the beginning of the weekend to finish its weekly processing in the window allocated. Which of the following solutions is most appropriate to continuously maximize resource use for these two LPARs?()

    • A、Dynamic LPAR
    • B、Workload Manager
    • C、Partition Load Manager
    • D、Shared Processor Pools

    正确答案:C

  • 第17题:

    What does the DB_FLASHBACK_RETENTION_TARGET parameter configure?()  

    • A、 An upper limit on how far you can flash back the database,depending on the information in the redo logs
    • B、 An upper limit on how far you can flash back the database,depending on the information in the undo tablespace
    • C、 The amount of time for which the flashback data is to be kept in the flash recovery area, provided that there is enough space
    • D、 The amount of time for which the flashback data is guaranteed to be kept in the undo tablespace,provided that there is enough space

    正确答案:C

  • 第18题:

    单选题
    A customer has shut down an LPAR after using DLPAR to add or remove processor and memory resources. When the partition is reactivated, the desired changes are missing. What action, or sequence of actions, will immediately and permanently solve this problem?()
    A

    Add or remove the resources in the profile, click 'apply', then 'save'.

    B

    Add or remove the resources using DLPAR and change the partition profile.

    C

    Add or remove the resources using DLPAR, then shutdown and reactivate the LPAR.

    D

    Add or remove the resources in the system profile and reboot the managed system.


    正确答案: A
    解析: 暂无解析

  • 第19题:

    单选题
    A retail customer has an 8-core Power 740 server with 2 partitions. Production has 4 dedicated cores and the test partition has 2 dedicated cores. Both partitions run during the day without problems. At night, batch processing is exceeding the run window.  Which solution addresses this problem without requiring additional hardware?()
    A

    Adding VMControl will automate processor resource allocation during peak workloads 

    B

    Enable Dynamic Symmetric Multithreading in the HMC to balance workloads across processors.

    C

    Add processing resources during the times they are required using Utility Capacity on Demand.

    D

    Changing the partitions to Uncapped can make use of additional processor cycles during peak workloads. 


    正确答案: C
    解析: 暂无解析

  • 第20题:

    单选题
    A customer wants to run DB2 on a Power 780 with uncapped partitions. They have licensed DB2 for 32 of the 64 active cores, and will use it in multiple partitions.   How can the customer ensure that the number of licenses purchased for DB2 is not exceeded?()
    A

    Create a 32-core shared processor pool for the DB2 partitions.

    B

    Limit the number of virtual processors on each DB2 partition to 32.

    C

    Use the IBM License Metric Tool to dynamically manage DB2 usage in the partitions.

    D

    Set the ‘Desired Processing Units’ in each DB2 partition profile so that the sum of all partitions equals 32.


    正确答案: D
    解析: 暂无解析

  • 第21题:

    单选题
    A customer has an LPAR with 4 dedicated cores on a POWER7 server with SMT4 enabled. How many logical processors are presented to an application running on this LPAR?()
    A

    4

    B

    8

    C

    16

    D

    32


    正确答案: C
    解析: 暂无解析

  • 第22题:

    单选题
    Companycom is considering a partitioned solution with one of the LPARs utilizing 12 CPUs. Multiple applications will be loaded on this large LPAR. However, the customer wants to ensure some tasks will have higher priority access to the CPU and memory resources. Which of the following solutions would best satisfy the requirement?()
    A

    Loadleveler

    B

    AIX Workload Manager

    C

    Partition Load Manager

    D

    Tivoli Provisioning Manager


    正确答案: B
    解析: 暂无解析

  • 第23题:

    单选题
    A System p customer is planning to implement virtualization and is concerned about how to respond  to an increased workload and what limitations there are for very small workloads.  Which of the following describes the minimum size for an LPAR and the minimum amount that can be transferred from on LPAR to another()
    A

    Smallest partition 10% of all available processors, as small as 1% of all available processors may be transferred.

    B

    Smallest partition 10% of a processor, as small 1% of a processor may be transferred.

    C

    Smallest partition one processor, as small 1% of a processor may be transferred.

    D

    Smallest partition one core, as small 10% of a processor may be transferred.


    正确答案: C
    解析: 暂无解析

  • 第24题:

    单选题
    Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()
    A

    Use AIX 5.3 which supports micro-partitioning for both the test and training LPARS

    B

    Use DLPAR to move resources from the test LPAR to training when training is active

    C

    Install Partition Load Manager to share resources between the test and training environments

    D

    Install Advanced Power Virtualization and then use micro-partitioning for both the test and  training LPARs


    正确答案: D
    解析: 暂无解析