niusouti.com

单选题A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()A PowerVM Standard E

题目
单选题
A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()
A

PowerVM Standard Edition

B

VMControl Standard Edition

C

Hardware Management Console

D

IBM Systems Director Standard Edition


相似考题
参考答案和解析
正确答案: A
解析: 暂无解析
更多“单选题A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()A PowerVM Standard E”相关问题
  • 第1题:

    A customer wishes to replace 12 older small UNIX systems.  They are running out of floor space in their data center and any solution must take this into consideration.  Assuming that the applications are supported on all AIX versions, which of the following would best meet the customer’s requirements?()

    • A、A p650 running AIX v5.3
    • B、A p5-550 running AIX v5.3
    • C、A p5-570 running Advanced POWER Virtualization
    • D、Multiple rack-mounted p615s running dynamic LPAR

    正确答案:C

  • 第2题:

    A customer with p615, p630 and p650 pSeries servers installed and running AIX is considering Linux as an additional environment. Which Linux capabilities can the pSeries Sales Specialist present as choices that are available to enhance the existing systems?()

    • A、Linux will be restricted to the p650 system, as it is not supported on the p630.
    • B、The customer can run Linux on all the existing systems with or without the presence of AIX.
    • C、Linux can run in LPARs on the existing systems but Linux will require the presence of AIX in at least one LPAR.
    • D、Linux can be installed on all existing systems but will require the AIX Linux Affinity libraries to boot the systems and run Linux.

    正确答案:B

  • 第3题:

    A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()

    • A、PowerVM Standard Edition
    • B、VMControl Standard Edition
    • C、Hardware Management Console
    • D、IBM Systems Director Standard Edition

    正确答案:D

  • 第4题:

    Companycom has a requirement for an LPAR in their p5 595 to run SUSE Linux. They also require an adapter that is not currently supported in Linux. Which of the following would be the best solution to recommend?()

    • A、Assign the adapter to an IO Hosting partition
    • B、Use AIX 5L affinity to move the application from SUSE to AIX
    • C、Use AIX 5.3 drivers to install the adapter in the Linux LPAR
    • D、Assign the adapter to an AIX 5.3 partition running Linux Affinity

    正确答案:A

  • 第5题:

    A customer plans to consolidate to high-end enterprise level servers using multiple partitions.  They are evaluating an IBM POWER5 solution for their server consolidation environment.  Which of the following best describes the value of the IBM solution as compared with the competition?()

    • A、The POWER5 system has greater memory and processor granularity and can also run both Linux and AIX at the same time in different LPARs.
    • B、The POWER5 system supports more partitions, processors, and memory than any competitor’s solution.
    • C、The POWER5 system has the lowest partitioning overhead and can also run both Linux and AIX at the same time in different LPARs.
    • D、The POWER5 system supports more partitions and has the lowest partitioning overhead.

    正确答案:A

  • 第6题:

    Which of the following lists of items all require an HMC to function with POWER5?()

    • A、Running AIX 5.3 Implementing HACMP Implementing Static LPAR
    • B、Implementing Advanced POWER Virtualization Running Linux Attaching RIO drawers
    • C、Implementing VIO Server Implementing Dynamic LPAR Running with SMT turned "On"
    • D、Running AIX and Linux on the same system Implementing CoD Implementing Micro-Partitioning

    正确答案:D

  • 第7题:

    单选题
    A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()
    A

    PowerVM Standard Edition

    B

    VMControl Standard Edition

    C

    Hardware Management Console

    D

    IBM Systems Director Standard Edition


    正确答案: D
    解析: 暂无解析

  • 第8题:

    单选题
    A customer plans to consolidate to high-end enterprise level servers using multiple partitions.  They are evaluating an IBM POWER5 solution for their server consolidation environment.  Which of the following best describes the value of the IBM solution as compared with the competition?()
    A

    The POWER5 system has greater memory and processor granularity and can also run both Linux and AIX at the same time in different LPARs.

    B

    The POWER5 system supports more partitions, processors, and memory than any competitor’s solution.

    C

    The POWER5 system has the lowest partitioning overhead and can also run both Linux and AIX at the same time in different LPARs.

    D

    The POWER5 system supports more partitions and has the lowest partitioning overhead.


    正确答案: D
    解析: 暂无解析

  • 第9题:

    单选题
    An IT director is eager to adopt POWER7 servers because of their relative performance ratings and energy efficiency, but is concerned about migrating applications which require AIX 5.3. Which of the following will address his concern?()
    A

    POWER7 servers running AIX 5.3 operate in POWER5+ mode.

    B

    POWER7 servers running AIX 5.3 operate in POWER6 and POWER6+ mode.

    C

    POWER7 servers running AIX 5.3 operate in POWER5 and POWER6 modes.

    D

    POWER7 servers running AIX 5.3 operate in POWER6 and POWER7 modes.


    正确答案: B
    解析: 暂无解析

  • 第10题:

    单选题
    Companycom is migrating from p670 systems running AIX 5.2 to p5 595 systems running AIX 5.3. They will be changing out only the system units. They will re-use the existing 61D drawers and adapters with the new p5 595 systems. What compatibility issue must be considered?()
    A

    APV features are not supported for some legacy POWER4 adapters

    B

    APV will require the most current maintenance level for AIX 5.2

    C

    APV features will require that legacy POWER4 adapters be updated with new microcode

    D

    The Virtual IO Server must run AIX 5.3 and the LPARs can run either AIX 5.2 or AIX 5.3


    正确答案: C
    解析: 暂无解析

  • 第11题:

    单选题
    A customer wants to run a Domino e-mail application,a Business Intelligence database,and a batch processing application on Linux.The workloads have different behaviors and do not have peaks at the same time. What is a benefit of running these applications on a Power Systems server instead of running on separate x86 servers?()
    A

    Each Linux application can run in a Workload Partition, reducing the management efforts.

    B

    Total cost of Linux applications on Power Systems is more cost effective than on x86 because of platform licensing.

    C

    Memory cloning can be used on the Power Systems to have a single image of the Linux kernel shared by all partitions.

    D

    Using micro-partitions on Power Systems allow the workloads to share the processing resources, increasing the overall system utilization.


    正确答案: B
    解析: 暂无解析

  • 第12题:

    单选题
    Companycom tells the technical sales specialist that recent announcements state that virtual lan in the datacenter is the best option. The customer wants to use interpartition communication to save on adapters and increase performance. The systems are going to have shared and dedicated processor partitions. Some of the partitions will be running AIX 5.2 and some will be running AIX 5.3. The second p5 590 will be running a mixture of AIX 5.3 and Linux partitions with 2.6 kernel. What limitations of vlan/interpartition  communication should be discussed with this customer?()
    A

    Virtual Ethernet uses the system processors for all communication functions instead of offloading that load to processors on network adapter cards. Virtual Ethernet is supported on AIX 5L and Linux 2.5 and above. 

    B

    Virtual Ethernet can be used within groups of shared OR groups of dedicated processor partitions, but not both simultaneously. Virtual Ethernet comes with AIX 5L, and is supported in AIX 5.2 or AIX 5.3 partitions, but not Linux. 

    C

    Virtual Ethernet can be used in both shared and dedicated processor partitions. Virtual Ethernet can run in an AIX 5.3 or Linux 2.6 Kernel, but not AIX 5.2 partitions. Virtual Ethernet can only connect partitions within a single system. 

    D

    Virtual Ethernet uses the system processors for all communication functions instead of offloading that load to processors on network adapter cards. Virtual Ethernet can connect partitions between systems if the HMC is shared between systems.


    正确答案: A
    解析: 暂无解析

  • 第13题:

    Company.com has four pSeries servers in their data center and wants to deploy multiple Micro-Partitions.  Which of the following data center servers can be used for this purpose?()

    • A、p5-520 running Virtual I/O Server
    • B、p690 running AIX 5L V5.3
    • C、p5-510 running AIX 5L V5.2
    • D、p5-520 running two dedicated processor partitions

    正确答案:A

  • 第14题:

    An IT director is eager to adopt POWER7 servers because of their relative performance ratings and energy efficiency, but is concerned about migrating applications which require AIX 5.3. Which of the following will address his concern?()

    • A、POWER7 servers running AIX 5.3 operate in POWER5+ mode.
    • B、POWER7 servers running AIX 5.3 operate in POWER6 and POWER6+ mode.
    • C、POWER7 servers running AIX 5.3 operate in POWER5 and POWER6 modes.
    • D、POWER7 servers running AIX 5.3 operate in POWER6 and POWER7 modes.

    正确答案:B

  • 第15题:

    Companycom tells the technical sales specialist that recent announcements state that virtual lan in the datacenter is the best option. The customer wants to use interpartition communication to save on adapters and increase performance. The systems are going to have shared and dedicated processor partitions. Some of the partitions will be running AIX 5.2 and some will be running AIX 5.3. The second p5 590 will be running a mixture of AIX 5.3 and Linux partitions with 2.6 kernel. What limitations of vlan/interpartition  communication should be discussed with this customer?()

    • A、Virtual Ethernet uses the system processors for all communication functions instead of offloading that load to processors on network adapter cards. Virtual Ethernet is supported on AIX 5L and Linux 2.5 and above. 
    • B、Virtual Ethernet can be used within groups of shared OR groups of dedicated processor partitions, but not both simultaneously. Virtual Ethernet comes with AIX 5L, and is supported in AIX 5.2 or AIX 5.3 partitions, but not Linux. 
    • C、Virtual Ethernet can be used in both shared and dedicated processor partitions. Virtual Ethernet can run in an AIX 5.3 or Linux 2.6 Kernel, but not AIX 5.2 partitions. Virtual Ethernet can only connect partitions within a single system. 
    • D、Virtual Ethernet uses the system processors for all communication functions instead of offloading that load to processors on network adapter cards. Virtual Ethernet can connect partitions between systems if the HMC is shared between systems.

    正确答案:C

  • 第16题:

    A manufacturing business is presently supporting multiple UNIX platforms and considering the advantages of consolidating environments, adding new applications and standardizing on HP-UX with IA-64. Which advantage should be communicated as the most compelling reason to consider pSeries as the platform of choice?()

    • A、The pSeries family of servers offers many choices from small entry servers to data-center class systems
    • B、pSeries systems support both AIX and Linux operating systems providing a single platform for both environments
    • C、AIX contains the tools and utilities necessary to convert all their UNIX software onto a single pSeries server
    • D、Thousands of AIX operating system-based applications, middleware, and tools are available today and already optimized

    正确答案:D

  • 第17题:

    An HP UNIX server customer running Oracle is interested in knowing more about IBM’s future direction because of the uncertainty of HP hardware platforms changing to Itanium. Which of the following advantages should be communicated as a compelling reason to consider a pSeries server solution?()

    • A、IBM pSeries servers support Oracle on both POWER4 and Itanium
    • B、AIX has Itanium affinity with any ISV application including Oracle
    • C、Oracle and thousands of other ISV applications are already available for AIX on pSeries
    • D、IBM Data Migration Services can migrate the HP UNIX operating system to a pSeries solution

    正确答案:C

  • 第18题:

    A customer wants to run a Domino e-mail application,a Business Intelligence database,and a batch processing application on Linux.The workloads have different behaviors and do not have peaks at the same time. What is a benefit of running these applications on a Power Systems server instead of running on separate x86 servers?()

    • A、Each Linux application can run in a Workload Partition, reducing the management efforts.
    • B、Total cost of Linux applications on Power Systems is more cost effective than on x86 because of platform licensing.
    • C、Memory cloning can be used on the Power Systems to have a single image of the Linux kernel shared by all partitions.
    • D、Using micro-partitions on Power Systems allow the workloads to share the processing resources, increasing the overall system utilization.

    正确答案:D

  • 第19题:

    单选题
    A customer wishes to replace 12 older small UNIX systems.  They are running out of floor space in their data center and any solution must take this into consideration.  Assuming that the applications are supported on all AIX versions, which of the following would best meet the customer’s requirements?()
    A

    A p650 running AIX v5.3

    B

    A p5-550 running AIX v5.3

    C

    A p5-570 running Advanced POWER Virtualization

    D

    Multiple rack-mounted p615s running dynamic LPAR


    正确答案: B
    解析: 暂无解析

  • 第20题:

    单选题
    A customer with p615, p630 and p650 pSeries servers installed and running AIX is considering Linux as an additional environment. Which Linux capabilities can the pSeries Sales Specialist present as choices that are available to enhance the existing systems?()
    A

    Linux will be restricted to the p650 system, as it is not supported on the p630.

    B

    The customer can run Linux on all the existing systems with or without the presence of AIX.

    C

    Linux can run in LPARs on the existing systems but Linux will require the presence of AIX in at least one LPAR.

    D

    Linux can be installed on all existing systems but will require the AIX Linux Affinity libraries to boot the systems and run Linux.


    正确答案: C
    解析: 暂无解析

  • 第21题:

    单选题
    A customer has a mixed environment of AIX on POWER4 and POWER5, and x86 based systems running a supported distribution of Linux. There is a total of 7 partitions and three standalone x86 servers. The customer wants to consolidate their applications using a single 4-core POWER6 server.  What is the minimum PowerVM edition that supports the customer requirement?()
    A

     PowerVM Lx86

    B

     PowerVM Express Edition

    C

     PowerVM Standard Edition

    D

     PowerVM Enterprise Edition


    正确答案: B
    解析: 暂无解析

  • 第22题:

    单选题
    Company.com has four pSeries servers in their data center and wants to deploy multiple Micro-Partitions.  Which of the following data center servers can be used for this purpose?()
    A

    p5-520 running Virtual I/O Server

    B

    p690 running AIX 5L V5.3

    C

    p5-510 running AIX 5L V5.2

    D

    p5-520 running two dedicated processor partitions


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    Which of the following lists of items all require an HMC to function with POWER5?()
    A

    Running AIX 5.3 Implementing HACMP Implementing Static LPAR

    B

    Implementing Advanced POWER Virtualization Running Linux Attaching RIO drawers

    C

    Implementing VIO Server Implementing Dynamic LPAR Running with SMT turned On

    D

    Running AIX and Linux on the same system Implementing CoD Implementing Micro-Partitioning


    正确答案: A
    解析: 暂无解析

  • 第24题:

    单选题
    The systems administrator of a large manufacturer has POWER5 and POWER6 servers, each with LPARs running AIX 6.1.  They are running several workloads including SAP, DNS, Oracle, DB2 and WebSphere Application Server, and plan to consolidate onto one POWER7 server.   How can the system administrator determine how much benefit Active Memory Expansion (AME) could provide for the consolidated system?()
    A

    Run amepat now on all of the existing LPARs.

    B

    Run amepat after consolidation on all LPARs.

    C

    Run amepat now on all existing LPARs running on the POWER6 servers.

    D

    Run amepat now on all existing LPARs running database applications.


    正确答案: D
    解析: 暂无解析