AddingVMControl will automate processor resource allocation during peak workloads.
Enable Dynamic Symmetric Multithreading in the HMC to balance workloads across processors.
Add processing resources during the times they are required using Utility Capacity on Demand.
Changing the partitions to Uncapped can make use of additional processor cycles during peak workloads.
第1题:
Companycom has purchased a p5 590 with 16 CPUs. To run Simultaneous Multi-Threading (SMT) with a 4-way virtual processor partition with 2.0 processing units of entitlement, how many logical CPUs will be allocated?()
第2题:
Company.com has a single pSeries server with two shared processor logical partitions. The first partition has peak resource requirements during weekdays. The second partition has peak resource requirements during weekends. During the peak times, the total workload between the partitions does NOT exceed the capacity of the server. However, the partitions are not able to utilize the full capacity of the system during peak times, because the necessary CPU and memory resources are not always allocated to the busiest partition. Which of the following options would best balance these resources?()
第3题:
A customer has an HMC-managed Power Systems server with 6 partitions. Four production partitions are subject to varying workloads throughout the day, and two are used for development and testing. The production applications have different licensing limitations on the number of physical cores that may be used. The development partitions can use no more than 1 core. The customer would like to dynamically optimize processor utilization within the licensing limits, with minimal operator intervention. Which of the following meets the customer requirement?()
第4题:
Companycom wants to manage multiple partitions for a p5 590 server using Partition Load Manager (PLM). Some of the partitions are dedicated processors and some of them are shared processors. What information about PLM limitations should be expressed to the customer?()
第5题:
A customer plans to consolidate to high-end enterprise level servers using multiple partitions. They are evaluating an IBM POWER5 solution for their server consolidation environment. Which of the following best describes the value of the IBM solution as compared with the competition?()
第6题:
Adding VMControl will automate processor resource allocation during peak workloads
Enable Dynamic Symmetric Multithreading in the HMC to balance workloads across processors.
Add processing resources during the times they are required using Utility Capacity on Demand.
Changing the partitions to Uncapped can make use of additional processor cycles during peak workloads.
第7题:
Define the production partitions' maximum CPU to the licensing limitations. Define the development/test partition maximums to one core. Configure each partition to be capped.
Define the production partitions' maximum CPU to the licensing limitations. Define the development/test partition maximums to one core. Configure each partition to be uncapped.
Define the production partitions' maximum CPU to the licensing limitations. Define the development/test partitions to use no more than one core. Configure the HMC scheduler to dynamically assign processors among the pools over a day.
Create a shared processor pool for each production partition, with the maximum processor limit set to the licensing limit for the application in the pool. Assign the development and testing partitions to a processor pool with a maximum of 1 core. Configure each partition to use uncapped processing.
第8题:
Create a 32-core shared processor pool for the DB2 partitions.
Limit the number of virtual processors on each DB2 partition to 32.
Use the IBM License Metric Tool to dynamically manage DB2 usage in the partitions.
Set the ‘Desired Processing Units’ in each DB2 partition profile so that the sum of all partitions equals 32.
第9题:
Purchase PowerVM Enterprise Edition.Use System Director to automate Live Partition Mobility to recover from partition failure
Create additional shared processor partitions as standby nodes.Use PowerHA SystemMirror to activate and use CoD resources when a failover occurs
Purchase an additional 32-core Power 750 with PowerHA SystemMirror Standard Edition.Use the new system as standby node with the XD component of PowerHA
Purchase an additional Power 770 system.Locate production and standby database partitions on each system.Use DB2 pureScale to provide automated partition monitoring and failover
第10题:
Configure AIX Workload Manager
Configure Partition Load Manager
Configure eServer Workload Manager
Use DLPAR from the HMC
第11题:
Use micropartitioning for test and QA environments, and DLPAR for the production applications
Use micropartitioning for test and QA environment, and CPU pooling for the production applications
Create standard LPARs for all test, QA, and production applications to keep all partitions separate and isolated.
Create DLPAR partitions for all test, QA, and production applications to keep test from disturbing production environment.
第12题:
Set Multiple Core Scaling (MCS) value of the port group to 8 and set multiple core parameter of the client Ethernet adapters to yes.
Set Multiple Core Scaling (MCS) value of the port group to 4 and set multiple core parameter of the client Ethernet adapters to yes.
Set Multiple Core Scaling (MCS) value of one of the physical port groups to 4 and set multiple core parameter of the client Ethernet adapters to yes.
Set Multiple Core Scaling (MCS) value of one of the physical port groups to 8 and set the multiple core parameter of the client Ethernet adapters to yes.
第13题:
Companycom is planning to do server consolidation on POWER5. The customer has a test environment, a QA environment and a production environment for two applications. Both the test and QA environments are very small and are only utilized when new releases are being developed and tested. They require less than 1 CPU each. Both production applications require 2 CPUs for day-to-day operation and can require up to an additional 2 CPUs each during abrupt peak requirements. What is the best design for the LPARs?()
第14题:
A customer wants to run DB2 on a Power 780 with uncapped partitions. They have licensed DB2 for 32 of the 64 active cores, and will use it in multiple partitions. How can the customer ensure that the number of licenses purchased for DB2 is not exceeded?()
第15题:
A customer has an LPAR with 4 dedicated cores on a POWER7 server with SMT4 enabled. How many logical processors are presented to an application running on this LPAR?()
第16题:
A retail customer has an 8-core Power 740 server with 2 partitions. Production has 4 dedicated cores and the test partition has 2 dedicated cores. Both partitions run during the day without problems. At night, batch processing is exceeding the run window. Which solution addresses this problem without requiring additional hardware?()
第17题:
Your company has a Microsoft Hyper-V Server 2008 R2 environment. You manage the virtual environment by using Microsoft System Center Virtual Machine Manager (VMM) 2008 R2. You are creating a virtual test environment by installing two child partitions. The test environment must be completely isolated from all production servers. You need to ensure that the child partitions can communicate with each other. Which connection type should you configure?()
第18题:
8-way logical CPU partition, where each logical CPU has the power of 25% of a logical processor
4-way logical CPU partition, where each logical CPU has the power of 50% of a physical processor
8-way logical CPU partition, where each logical CPU has the power of 25% of a physical processor
16-way logical CPU partition, where each logical CPU has the power of 25% of a physical processor
第19题:
Build the logical partition infrastructure based on 6 or more VLANs.
Build the logical partition infrastructure based on two or more IVEs.
Build the logical partition infrastructure based on Partition Mobility.
Build the logical partition infrastructure based on redundant VIO Servers.
第20题:
The POWER5 system has greater memory and processor granularity and can also run both Linux and AIX at the same time in different LPARs.
The POWER5 system supports more partitions, processors, and memory than any competitor’s solution.
The POWER5 system has the lowest partitioning overhead and can also run both Linux and AIX at the same time in different LPARs.
The POWER5 system supports more partitions and has the lowest partitioning overhead.
第21题:
4
8
16
32
第22题:
All of the partitions can be managed in one group mixing dedicated and shared processors. PLM will move resources in the group as setup in the PLM profiles.
PLM handles memory, dedicated and shared processor partitions. All the partitions in a group must be of the same processor type. PLM moves I/O resources between partitions based on PLM policy files.
PLM handles memory, dedicated and shared processor partitions. The policy file, once loaded, is static and has no knowledge of workload on the managed partitions. PLM is supported for partitions that are running AIX 5.2 or i5OS.
All of the partitions in a group must be the same type, either all dedicated processor partitions or shared processor partitions. One PLM Server can manage multiple groups of partitions. PLM does not move resources between groups.
第23题:
Dedicated processors are fractions of whole processors that are dedicated to a single partition.
Virtual processors are the whole number of concurrent operations that the operating system can use.
Virtual processors and not dedicated processors are processors used in Virtual IO Server partitions.
Virtual processors and dedicated processors are interchangeable concepts, both are whole physical processors used in virtual and dedicated LPARs.
第24题:
Use AIX 5.3 which supports micro-partitioning for both the test and training LPARS
Use DLPAR to move resources from the test LPAR to training when training is active
Install Partition Load Manager to share resources between the test and training environments
Install Advanced Power Virtualization and then use micro-partitioning for both the test and training LPARs