niusouti.com

Please kindly arrange for shore workers to do ______ during loading the heavy cargo on deck as soon as possible.A.the work of using lines and chains to secure the cargo on boardB.the lash workC.the work of putting dunnage,keeping the cargo in position and

题目

Please kindly arrange for shore workers to do ______ during loading the heavy cargo on deck as soon as possible.

A.the work of using lines and chains to secure the cargo on board

B.the lash work

C.the work of putting dunnage,keeping the cargo in position and not move when the ship is rolling and pitching

D.the lashing work


相似考题
更多“Please kindly arrange for shore workers to do ______ during loading the heavy cargo on dec ”相关问题
  • 第1题:

    During the process of loading,damages to cargo can be reduced to minimum by ______.

    A.Shippers who deliver the cargo to the ship on time

    B.Stevedores who handle the cargo with caution

    C.Ship's crew members who check the cargo in regular intervals

    D.Consignees who take good care of the cargo


    正确答案:B

  • 第2题:

    Bonding cables are used during cargo transfer to ______.

    A.provide safe electrical power connection to barge equipment

    B.keep the vessel from surging excessively

    C.prevent an accidental discharge of static electricity

    D.secure the cargo hose to a hatch when loading overall


    正确答案:C

  • 第3题:

    The ()(笨重货) must be handled by jumbo boom or shore crane.

    • A、awkward cargo
    • B、drummed cargo
    • C、cased cargo
    • D、heavy cargo

    正确答案:A

  • 第4题:

    Some general cargo is handled by ().

    • A、shore cranes
    • B、heavy derricks
    • C、containers
    • D、equipment

    正确答案:B

  • 第5题:

    单选题
    During the process of loading, damages to cargo can be reduced to minimum by().
    A

    shippers who deliver the cargo to the ship on time

    B

    stevedores who handle the cargo with caution

    C

    ship's crew members who check the cargo in regular intervals

    D

    consig ees who take goo care of the cargo


    正确答案: B
    解析: 暂无解析

  • 第6题:

    单选题
    It’s possible to()out some cargo during loading.
    A

    bang

    B

    shut

    C

    lock

    D

    close


    正确答案: C
    解析: 暂无解析

  • 第7题:

    单选题
    Before any loading takes place any signs of the previous cargo should do().
    A

    kept

    B

    removed

    C

    replaced

    D

    recycled


    正确答案: A
    解析: 暂无解析

  • 第8题:

    单选题
    Concentrated heavy loads are involved in loading a LASH vessel. What does NOT require close attention due to such loads while working cargo?() .
    A

    GM - available and required

    B

    Longitudinal stress numeral

    C

    Tons per inch immersion numeral

    D

    Draft


    正确答案: C
    解析: 暂无解析

  • 第9题:

    单选题
    ()is known as a long hatch during loading operation.
    A

    The largest hatch of a ship

    B

    The hatch that is double rigged

    C

    The hatch where a disproportionate amount of cargo is atowed

    D

    The hatch where the most cargo is stowed


    正确答案: B
    解析: 暂无解析

  • 第10题:

    单选题
    Please arrnge for the workers to do the()work during loading the trucks and heavy cargo on the ship, and also supply the necessary materials for the work.
    A

    lashing

    B

    shifting

    C

    lifting

    D

    tallying


    正确答案: B
    解析: 暂无解析

  • 第11题:

    单选题
    Please kindly arrange for shore workers to do()during loading the heavy cargo on deck as soon as possible.
    A

    the work of using lines and chains to secure the cargo on board

    B

    the lash work

    C

    the work of putting dunnage,keeping the cargo in position and not move when the ship is rolling and pitching

    D

    the lashing work


    正确答案: C
    解析: 暂无解析

  • 第12题:

    单选题
    The most important principle in the cargo stowage is().
    A

    to avoid the rearrangement of the cargo loaded on board

    B

    to ensure the safety of the ship and cargo

    C

    to reject the damaged cargo during loading operation

    D

    to prevent the spontaneous combustion of the coal and grain


    正确答案: C
    解析: 暂无解析

  • 第13题:

    ______ refers to the stowage of cargo in a block of two or more adjoining cargo holds with the cargo holds adjacent to the block of loaded cargo holds empty.

    A.Alternate hold loading condition

    B.Block hold loading condition

    C.Part hold loading condition

    D.Homogeneous hold loading condition


    正确答案:B

  • 第14题:

    We are loading dangerous cargo, no (), please.

    • A、smoke
    • B、smoked
    • C、smoking
    • D、to smoke

    正确答案:C

  • 第15题:

    The ()(重吊杆) can lift heavy cargo.

    • A、heavy cargo derrick
    • B、heavy deck
    • C、jumbo boom
    • D、heavy block

    正确答案:C

  • 第16题:

    单选题
    You are kindly requested to supply the necessary tallymen to do()on board the ship during the discharging of the cargo.
    A

    the tallying work

    B

    the lashing work

    C

    the clean work

    D

    the work of opening and closing hatches


    正确答案: A
    解析: 暂无解析

  • 第17题:

    单选题
    Please arrange()a cleaning gang to sweep out all the ship’s cargo holds to enable her to receive cargo at this port.
    A

    to

    B

    with

    C

    by

    D

    for


    正确答案: D
    解析: 暂无解析

  • 第18题:

    单选题
    We are loading dangerous cargo, no (), please.
    A

    smoke

    B

    smoked

    C

    smoking

    D

    to smoke


    正确答案: B
    解析: 暂无解析

  • 第19题:

    单选题
    It would be possible that part of the cargo got()as great change in the weather during the voyage caused heavy()in the hold.
    A

    damp/water

    B

    dampness/sweater

    C

    wet/condensation

    D

    wetness/dew


    正确答案: B
    解析: 暂无解析

  • 第20题:

    单选题
    Connentrated heavy loads are involved in loading a lash vessel. What does not require close attention due to such loads while working cargo?().
    A

    GM-available and required

    B

    Longitudinal stress numberal

    C

    Tons per inch immersion numeral

    D

    Draft


    正确答案: B
    解析: 暂无解析

  • 第21题:

    单选题
    The expenses for the loading of trucks and heavy cargo and the necessary materials for lashing thereof will be charged to()account.
    A

    the supercargo's

    B

    the shipper's

    C

    the shipowner's

    D

    carrier's


    正确答案: B
    解析: 暂无解析

  • 第22题:

    单选题
    Please arrange for the workers to do the()work during loading the trucks and heavy cargo on the ship,and also supply the necessary materials for the work.
    A

    lashing

    B

    shifting

    C

    lifting

    D

    tallying


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    Bonding cables are used during cargo transfer to().
    A

    provide safe electrical power connection to barge equipment

    B

    keep the vessel from surging excessively

    C

    prevent an accidental discharge of static electricity

    D

    secure the cargo hose to a hatch when loading overall


    正确答案: B
    解析: 暂无解析