A vessel would be referred to as "stiff" when the weight of the cargo is ______.
A.evenly distributed vertically and the double bottoms are full
B.concentrated low and the double bottoms are empty
C.concentrated low and the double bottoms are full
D.concentrated high and the double bottoms are empty
第1题:
A vessel’s bottom will be subjected to tension when weight is concentrated ______.
A.amidships
B.aft
C.at both ends of the vessel
D.Forward
第2题:
当船舶停靠码头时,为了保证船货安全,有必要24小时值班。()
第3题:
a vessel is equipped with an automatic smoke or fire detecting system
the cargo hatches are of steel construction
the cargo is of a nonflammable type
there is sufficient fire protection located on the main deck adjacent to the cargo hatch
第4题:
poor stowage of cargo in a container
fire caused by lightning
overloading
inherent vice
第5题:
Deep tanks
Lower holds
Lower holds at the ends of the vessel
'Tween-decks
第6题:
cargo
box
cargo and box
rate weight
第7题:
amidships
aft
at both ends of the vesel
forward
第8题:
maximize your deck load
distribute lumber so that those stowing most compactly per unit of weight are in the upper holds
place the heaviest woods in the lower holds
keep the vessel's frame spaces free from lumber
第9题:
A vessel engaged in underwater operations
A vessel engaged in mine clearance
A vessel engaged on pilotage duty
A vessel engaged in survey operations
第10题:
shift weight to the high side
shift weight to the centerline
add weight in the lower holds or double bottoms
remove weight from the lower holds or double bottoms
第11题:
keep the buoy on the vessel's starboard side when approaching a port and on the vessel's port side when leaving
keep the buoy on the vessel's port side when approaching a port and on the vessel's starboard side when leaving
keep the buoy on the vessel's starboard side when approaching and leaving
keep the buoy on the vessel's port side when approaching and leaving
第12题:
for securing a snatch block when snaking cargo into the wings of the hold
to prevent cargo from coming in contact with the vessel's frames or shell plating
tp prevent fittings to which cargo lashing may be secured
to support the dunnage floors which are laid down between tiere of cargo
第13题:
How would you pass a red buoy in the maritime buoyage system “A”?______.
A.keep the buoy on the vessel’s starboard side when approaching a port and on the vessel’s port side when leaving
B.keep the buoy on the vessel’s port side when approaching a port and on the vessel’s starboard side when leaving
C.keep the buoy on the vessel’s starboard side when approaching and leaving
D.keep the buoy on the vessel’s port side when approaching and leaving
第14题:
deadweight scale
deck capacity plan
cubic capacity tables
general arrangement plan
第15题:
Unseaworthiness when sailing
Insufficient packing
Quarantine delays
Mismanagement of the vessel
第16题:
Loaded displacement minus light displacement
Gross tonnage minus net tonnage
Loaded displacement minus net tonnage
Light displacement minus the weight of the vessel
第17题:
transpored to the ships side
transported into the shed
lashed and secured
delivered to the consignor
第18题:
The metacenter will move downward
The GM will increase
The center of buoyancy will move upward
The list of the vessel will become great
第19题:
evenly distributed vertically and the double bottoms are full
concentrated low and the double bottoms are empty
concentrated low and the double bottoms are full
concentrated high and the double bottoms are empty
第20题:
concentrated high and the double bottoms empty
concentrated low and the double bottoms empty
evenly distributed vertically with the double bottoms full
concentrated and with the double bottoms full
第21题:
evenly distributed vertically and the double bottoms are full
concentrated low and the double bottoms are empty
concentrated low and the double bottoms are full
concentrated high and the double bottoms are empty
第22题:
bow
mid-section
stern
All of the above
第23题:
changes berths to expedite loading or discharging
does not load and discharge its cargo in the time specified
is not ready to load or discharge cargo
loads and discharges its cargo in less time than specified