A Catalyst 2950 needs to be reconfigured. What steps will ensure that the old configuration is erased?()A. Erase flash.B. Restart the switch.C. Delete the VLAN database.D. Erase the running configuration.E. Erase the startup configuration.F. Modify the co

题目
A Catalyst 2950 needs to be reconfigured. What steps will ensure that the old configuration is erased?()

A. Erase flash.

B. Restart the switch.

C. Delete the VLAN database.

D. Erase the running configuration.

E. Erase the startup configuration.

F. Modify the configuration register.


相似考题
更多“A Catalyst 2950 needs to be reconfigured. What steps will ensure that the old configuration is erased?() ”相关问题
  • 第1题:

    What kind of cable should be used to establish a trunked line between two Catalyst 2950 switches?()

    A. a straight-through cable

    B. an EIA/TIA-232 serial cable

    C. an auxiliary cable

    D. a modem cable

    E. a cross-over cable


    参考答案:E

  • 第2题:

    下述哪种交换机使用模块化的体系结构().

    • A、Catalyst 6500
    • B、Catalyst 2950
    • C、Catalyst 3750.3550
    • D、Catalyst 2960

    正确答案:A

  • 第3题:

    A customer with IPCC Express Standard reports that a script using the Database steps is not working. What is the most likely root cause?()

    • A、The script probably has an error in the DSN configuration.
    • B、IPCC Express Standard is not licensed for Database steps.  
    • C、The script probably has an error in the query string.  
    • D、There is probably an interoperability problem between IPCC Express and the database.

    正确答案:B

  • 第4题:

    You just purchased a refurbished router that contains a configuration from a previous deployment. What should you do, before entering a new configuration into the router?()

    • A、RAM should be erased and the router restarted.
    • B、Flash should be erased and the router restarted.
    • C、NVRAM should be erased and the router restarted.
    • D、The new configuration should be entered and saved.

    正确答案:D

  • 第5题:

    What is the function of the no switchport catalyst switch interface configuration command?()

    • A、Disables the interfaces to prevent traffic flow
    • B、Clears all the configurations on the interface
    • C、Switches the port from access mode to trunk mode
    • D、Converts the port from physical Layer 2 port to physical Layer 3 port

    正确答案:D

  • 第6题:

    Catalyst switches utilize a special technology to identify and prevent topology loops and ensure that data flows properly through a single network path. What is the name of this technology?()

    • A、VTP
    • B、ISL
    • C、802.1Q
    • D、STP
    • E、None of the above

    正确答案:D

  • 第7题:

    The network administrator has discovered that the power supply has failed on a switch in the company LAN and that the switch has stopped functioning. It has been replaced with a Cisco Catalyst 2950 series switch. What must be done to ensure that this new switch becomes the root bridge on the network?()

    • A、Lower the bridge priority number.
    • B、Change the MAC address of the switch.
    • C、Increase the VTP revision number for the domain.
    • D、Lower the root path cost on the switch ports.
    • E、Assign the switch an IP address with the lowest value.

    正确答案:A

  • 第8题:

    单选题
    You are developing a Windows Communication Foundation (WCF) service. The service needs to access out-of-process resources.You need to ensure that the service accesses these resources on behalf of the originating caller. What should you do?()
    A

    Set the value of ServiceSecurityContext.Current.WindowsIdentity.ImpersonationLevel to TokenlmpersonationLevel.Impersonation

    B

    Set the value of ServiceSecurityContext.Current.Windowsldentity.ImpersonationLevel to TokenlmpersonationLevel.Delegation

    C

    Set the PrincipalPermissionAttribute on the service contract and update the binding attribute in the endpoint element of the configuration file to wsHttpBinding

    D

    Set the PnncipalPermissionAttribute on the service contract and update the bindingConfiguration attribute in the endpoint element of the configuration file to wsHttpBinding


    正确答案: B
    解析: 暂无解析

  • 第9题:

    单选题
    You just purchased a refurbished router that contains a configuration from a previous deployment. What should you do, before entering a new configuration into the router?()
    A

    RAM should be erased and the router restarted.

    B

    Flash should be erased and the router restarted.

    C

    NVRAM should be erased and the router restarted.

    D

    The new configuration should be entered and saved.


    正确答案: D
    解析: 暂无解析

  • 第10题:

    单选题
    The network administrator has discovered that the power supply has failed on a switch in the company LAN and that the switch has stopped functioning. It has been replaced with a Cisco Catalyst 2950 series switch. What must be done to ensure that this new switch becomes the root bridge on the network?()
    A

     Lower the bridge priority number.

    B

     Change the MAC address of the switch.

    C

     Increase the VTP revision number for the domain.

    D

     Lower the root path cost on the switch ports.

    E

     Assign the switch an IP address with the lowest value.


    正确答案: E
    解析: 暂无解析

  • 第11题:

    单选题
    You are at a client site. It is a medium-sized business and needs a Cisco Catalyst switch that offers high availability and security. What type of Catalyst switches would you recommend?()
    A

     Catalyst 2960 Series

    B

     Catalyst 3750 Series

    C

     Catalyst 4900 Series

    D

     Catalyst 6500 Series


    正确答案: A
    解析: 暂无解析

  • 第12题:

    多选题
    A Catalyst 2950 needs to be reconfigured. What steps will ensure that the old configuration is erased?()
    A

    Erase flash.

    B

    Restart the switch.

    C

    Delete the VLAN database.

    D

    Erase the running configuration.

    E

    Erase the startup configuration.

    F

    Modify the configuration register.


    正确答案: F,E
    解析: 暂无解析

  • 第13题:

    A Catalyst 2950 needs to be reconfigureD.What steps will ensure that the old configuration is erased?()

    A.Erase flash.

    B.Restart the switch.

    C.Delete the VLAN database.

    D.Erase the running configuration.

    E.Erase the startup configuration.

    F.Modify the configuration register.


    参考答案:B, C, E

  • 第14题:

    You are at a client site. It is a medium-sized business and needs a Cisco Catalyst switch that offers high availability and security. What type of Catalyst switches would you recommend?()

    • A、 Catalyst 2960 Series
    • B、 Catalyst 3750 Series
    • C、 Catalyst 4900 Series
    • D、 Catalyst 6500 Series

    正确答案:A

  • 第15题:

    A Catalyst 2950 needs to be reconfigureD.What steps will ensure that the old configuration is erased?()

    • A、Erase flash.
    • B、Restart the switch.
    • C、Delete the VLAN database.
    • D、Erase the running configuration.
    • E、Erase the startup configuration.
    • F、Modify the configuration register.

    正确答案:B,C,E

  • 第16题:

    A Catalyst 2950 needs to be reconfigured. What steps will ensure that the old configuration is erased?()

    • A、Erase flash.
    • B、Restart the switch.
    • C、Delete the VLAN database.
    • D、Erase the running configuration.
    • E、Erase the startup configuration.
    • F、Modify the configuration register.

    正确答案:B,C,E

  • 第17题:

    The network administrator has discovered that the power supply has failed on a switch in the company LAN and that the switch has stopped functioning. It has been replaced with a Cisco Catalyst 2950 series switch.What must be done to ensure that this new switch becomes the root bridge on the network?()

    • A、One router is running RIPv1.
    • B、RIP neighbor is 224.0.0.9.
    • C、The network contains a loop.
    • D、Network 10.10.1.0 is reachable.

    正确答案:A

  • 第18题:

    What kind of cable should be used to establish a trunked line between two Catalyst 2950 switches?()

    • A、a straight-through cable
    • B、an EIA/TIA-232 serial cable
    • C、an auxiliary cable
    • D、a modem cable
    • E、a cross-over cable

    正确答案:E

  • 第19题:

    The following Cisco Catalyst Series switches fit in the access area. Which switches also utilize StackWise technology to address the needs of companies with growing networks by allowing them to connect?()

    • A、 Cisco Express Catalyst 500 Series switches
    • B、 Cisco Catalyst 2900 Series switches
    • C、 Cisco Catalyst 3560 switches
    • D、 Cisco Catalyst 3700 Series switches
    • E、 Cisco Catalyst 4500 Series switches
    • F、 Cisco Catalyst 6500 Series switches

    正确答案:D

  • 第20题:

    多选题
    A Catalyst 2950 needs to be reconfigureD.What steps will ensure that the old configuration is erased?()
    A

    Erase flash.

    B

    Restart the switch.

    C

    Delete the VLAN database.

    D

    Erase the running configuration.

    E

    Erase the startup configuration.

    F

    Modify the configuration register.


    正确答案: B,E
    解析: 暂无解析

  • 第21题:

    单选题
    局域网的网关地址为192.168.0.1,现在想在Cisco Catalyst2950交换机上配置网关地址,你应采取的步骤是()。
    A

    C2950#conftC2950(config-iF.#ipaddress192.168.0.1

    B

    C2950>enableC2950#ipdefault-gateway192.168.0.1

    C

    C2950#conftC2950(config-iF.#ipdefault-gateway192.168.0.1255.255.255.0

    D

    C2950#conftC2950(config)#ipdefault-gateway192.168.0.1


    正确答案: D
    解析: 暂无解析

  • 第22题:

    单选题
    What kind of cable should be used to establish a trunked line between two Catalyst 2950 switches?()
    A

    a straight-through cable

    B

    an EIA/TIA-232 serial cable

    C

    an auxiliary cable

    D

    a modem cable

    E

    a cross-over cable


    正确答案: B
    解析: 暂无解析

  • 第23题:

    单选题
    What form of AutoQoS is supported on Cisco Catalyst 2950 switches with the Enhanced Image?()
    A

    AutoQos Enterprise

    B

    AutoQoS Campus

    C

    AutoQoS VoIP

    D

    AutoQoS LAN


    正确答案: C
    解析: 暂无解析