You plan to control the sessions performing a huge number of I/O operations. Your requirement is to kill the session when it exceeds a specified number of I/Os. Which statement describes a solution to the above?()A. Set a threshold for the default system-

题目

You plan to control the sessions performing a huge number of I/O operations. Your requirement is to kill the session when it exceeds a specified number of I/Os. Which statement describes a solution to the above?()

A. Set a threshold for the default system-defined moving window baseline.

B. Add directives to the Automatic Database Diagnostic Monitor (ADDM).

C. Modify the profile for the targeted users for which control needs to be imposed.

D. Implement the database resource manager to add the SWITCH_IO_REQS and SWITCH_GROUP directives.


相似考题
更多“You plan to control the sessions performing a huge number of I/O operations. Your requirem ”相关问题
  • 第1题:

    ( ) – Is Miss White __________ English teacher, Maria?

    – No, she teaches __________ geography.

    A.your;my

    B.you;mine

    C.you;us

    D.your;us


    正确答案:D

  • 第2题:

    I'd very much like to know what your aim in life is.

    A:thought
    B:idea
    C:goal
    D:plan

    答案:C
    解析:
    本句意思:我很想知道你的生活目标是什么。单词goal意思为“目标,目的”,与aim (目的)意思接近。单词thought作名词意思为“见解,思维”;idea意思为“想法,主意”;plan意 思为“计划,方案”。

  • 第3题:

    1、如果有如一些的程序代码 int i =10; int number=i++; number=--i;以下说法正确的是

    A.执行后number为10,i为10

    B.执行后number为10,i为11

    C.执行后number为11,i为10

    D.执行后number为11,i为11


    执行后number为10,i为10

  • 第4题:

    The project schedule is more than a document that lays out the activities over time to represent the time dimension of the project, it is a management tool to be used for decision making. As such , the schedule is used by the project management team to()

    A.Measure, delay, record, distribute, analyze, and direct
    B.Plan, schedule, monitor, control, report, and forecast
    C.Promote, highlight, monitor, control, forecast, and report
    D.Emphasize, visualize, analyze, conceptualize, report and record

    答案:B
    解析:
    项目进度计划不只是一个列出项目规定活动的时间表,而且还是一个用于决策的工具。如:进度计划可以被项目管理团队用来(73)。A.检测,延时,记录,分发,分析和直接B.计划,日程安排,监督,控制,报告和预测C.提升,亮点,监视,控制,预测和报告D.重点化,可视化,分析,概念化,报告和记录

  • 第5题:

    如果有如一些的程序代码 int i =10; int number=i++; number=--i;以下说法正确的是

    A.执行后number为10,i为10

    B.执行后number为10,i为11

    C.执行后number为11,i为10

    D.执行后number为11,i为11


    执行后number为10,i为10

  • 第6题:

    SCOR模型从()方面供应链管理流程。

    A.plan、fulfill、control、feedback

    B.plan、source、make、deliver、return

    C.fulfill、control、feedback

    D.deliver、return


    plan 、 source 、 make 、 deliver 、 return