    85 Project tradeoffs are usually made by comparing _____ and constraints.

    A. Time, cost, and quality

    B. Time, risk, and quality

    C. Risk, quality, and manpower availability

    D. Cost, quality, and technical performance

    E. Cost, quality, and risk


    正确答案:D

  • 第2题:

    ● Project tradeoffs are usually made by comparing _____ and constraints.

    A Time, cost, and quality

    B Time, risk, and quality

    C Risk, quality, and manpower availability

    D Cost, quality, and technical performance

    E Cost, quality, and risk


    正确答案:D

  • 第3题:

    Earned value management(EvM) integrates the scope baseline with the( )baseline, along with schedule baseline, to form the performance baseline, which helps the project management team assess and measure project performance and progress.挣值管理(evm)将范围基线与( )基线以及进度基线结合起来,形成绩效基线,帮助项目管理团队评估和衡量项目绩效和进度。

    A.qulity质量
    B.risk风险
    C.change变更
    D.cost成本

    答案:D
    解析:

  • 第4题:

    154 Project trade-offs vary between

    A. risk, cost and schedule.

    B. direct cost, indirect cost, and resource availability

    C. quality, schedule and time

    D. cost, quality and schedule

    E. contract terms, scope and budget


    正确答案:D

  • 第5题:

    The _____ of blood always makes him feel sick.

    (A) sight (C) look

    (B) view (D) form

     

     


    选A

    look 一般有这样两层含义:对视觉器官的使用,即“朝……看”;看的行为所产生的印象,用于人时指“神态”或“样子”,用于物时指“面貌”
    sight指“情景”“奇观”,强调看到处于视野以内或为视力可及的东西
    view意为视野,指用特殊的方式观看事物或有目的地进行观察;(从特定的处所看到的)景色
    scene意为“景象”,“风光”