niusouti.com

In a workflow system, a process is specified using the process definition tool. Usually, processes are defined in terms of a ____, which consists of __请作答该选项__ indicated using a circle, and ____ shown as a rectangle. These two components can be linked b

题目
In a workflow system, a process is specified using the process definition tool. Usually, processes are defined in terms of a ____, which consists of __请作答该选项__ indicated using a circle, and ____ shown as a rectangle. These two components can be linked by means of a directed arC.

A.positions
B.resources
C.conditions
D.places

相似考题
更多“In a workflow system, a process is specified using the process definition tool. Usually, processes are defined in terms of a ____, which consists of __请作答该选项__ indicated using a circle, and ____ sh”相关问题
  • 第1题:

    Which background process of a database instance, using Automatic Storage Management (ASM), connects as a foreground process into the ASM instance?()

    A. ASMB

    B. PMON

    C. RBAL

    D.SMON


    参考答案:A

  • 第2题:

    The purpose of the requirements definition phase is to produce a clear,complete,consistent,and testable( )of the technical requirements for the software product.During the requirements definition phase,the requirements definition team uses an iterative process to expand a broad statement of the system requirements into a complete and detailed specification of each function that the software must perform and each( )that it must meet.The starting point is usually a set of high level requirements from the(请作答此空)that describe the project or problem.In either case,the requirements definition team formulates an overall concept for the system and then defines( )showing how the system will be operated publishes the system and operations concept document and conducts a system concept review(SCR).Following the SCR,the team derives( )requirements for the system from the high level requirements and the system and operations concept.using structured or object-oriented analysis.the team specifies the software functions and algorithms needed to satisfy each detailed requirement.

    A.producer
    B.customer
    C.programmer
    D.analyser

    答案:B
    解析:

  • 第3题:

    The __请作答该选项__ is a general description of the architecture of a workflow management system used by the WFMC, in which the main components and the associated interfaces are summarizeD.The workflow enactment service is the heart of a workflow system which consists of several ____.

    A.waterfall model
    B.workflow reference model
    C.evolutionary model
    D.spiral model

    答案:B
    解析:

  • 第4题:

    The ____ is a general description of the architecture of a workflow management system used by the WFMC, in which the main components and the associated interfaces are summarizeD.The workflow enactment service is the heart of a workflow system which consists of several ____. In a workflow system, a process is specified using the process definition tool. Usually, processes are defined in terms of a ____, which consists of ____ indicated using a circle, and __请作答该选项__ shown as a rectangle. These two components can be linked by means of a directed arC.

    A.trasitions
    B.transformations
    C.transmitters
    D.changes

    答案:A
    解析:
    工作流参考模型是WFMC用来对工作流管理系统架构的通用描述,在这个模型中,对主要组件和相关接口进行了概括。工作流例行服务是工作流系统的核心,由几个工作流引擎组成。在工作流系统中,过程是使用过程定义该来加以说明的。通常情况下,过程通过Petri网的术语来进行定义,其中包括位置(用圆圈表示)和变迁(用矩形表示),这两个组件通过带箭头的弧相连。

  • 第5题:

    The ____ is a general description of the architecture of a workflow management system used by the WFMC, in which the main components and the associated interfaces are summarizeD.The workflow enactment service is the heart of a workflow system which consists of several __请作答该选项__.

    A.workflow engines
    B.processes
    C.workflow threads
    D.tasks

    答案:A
    解析:

  • 第6题:

    The workflow enactment service is the heart of a workflow system which consists of several_______.

    A.workflow engines
    B.processes
    C.workflow threads
    D.tasks

    答案:A
    解析:
    工作流参考模型是国际工作流管理联盟WFMC采用的、对工作流管理系统体系结构的一个通用的描述。在这个模型里,概括总结了主要的构件和相互关联的接口。工作流设定的服务是工作流系统的核心,这个核心由若干个工作流引擎驱动。(74) A.瀑布模型 B.工作流参考模型 C.进化模型 D.螺旋模型(75) A.流程引擎 B.过程 C.工作流线程 D.任务两题参考答案:B、A

  • 第7题:

    On AIX systems, where DNS resolution takes precedence over NIS, a particular process needs to resolve names using /etc/hosts first.  Which of the following processes is the best way to accomplish this without affecting the rest of the system’s name resolution?()

    • A、Set the NSORDER environmental variable of the environment which invokes the process to:NSORDER="local,nis,bind"
    • B、Set the NSORDER environmental variable of the environment which invokes the process to:  NSORDER="hosts=auth,nis,bind"
    • C、Edit /etc/netsvc.conf to add a line similar to the following: process /full/path/of/process {hosts=local,nis,dns}
    • D、Unset NSORDER environment variable of the environment which invokes the process

    正确答案:A

  • 第8题:

    A customer has just received three enterprise systems that support a total of 48 LPARs. Which installation method expedite the process?()

    • A、Network installation manager
    • B、Boot from installation media
    • C、A migration install
    • D、Copy the system using the HMC

    正确答案:A

  • 第9题:

    Which background process of a database instance, using Automatic Storage Management (ASM), connects asa foreground process into the ASM instance?()

    • A、ASMB
    • B、PMON
    • C、RBAL
    • D、SMON

    正确答案:A

  • 第10题:

    单选题
    Using the schedtune output, memory is considered over-committed if:()
    A

     more than one process is spinning.

    B

     more than 4 processes become active.

    C

     the system schedules more than 16 processes.

    D

     the pageouts divided by page steals is greater than 1/h.


    正确答案: B
    解析: 暂无解析

  • 第11题:

    单选题
    The()Process Group consists of the processes used to complete the work defined in the project management plan to accomplish the project's requirements.
    A

    Planning

    B

    Executing

    C

    Monitoring and Controlling

    D

    Closing


    正确答案: D
    解析: 该题的关键词为"accomplish the project's requirements",其语句结构为"The()Process Group(主语)consists of(谓语)the processes used to complete the work defined",含义为"用于完成工作的过程组成什么过程组",所以可知重点描述为"完成工作",根据项目管理五个过程组的特点,选择Executing(执行)过程组,其他选项容易排除。

  • 第12题:

    单选题
    A system administrator is in the process of documenting the system. Which of the following commands will provide a list of the devices defined on the system?()
    A

    lsdev -C

    B

    lslpp -C

    C

    lsattr -C

    D

    odmget -C


    正确答案: D
    解析: 暂无解析

  • 第13题:

    The purpose of the requirements definition phase is to produce a clear,complete,consistent,and testable( )of the technical requirements for the software product.During the requirements definition phase,the requirements definition team uses an iterative process to expand a broad statement of the system requirements into a complete and detailed specification of each function that the software must perform and each(请作答此空)that it must meet.The starting point is usually a set of high level requirements from the( )that describe the project or problem.In either case,the requirements definition team formulates an overall concept for the system and then defines( )showing how the system will be operated publishes the system and operations concept document and conducts a system concept review(SCR).Following the SCR,the team derives( )requirements for the system from the high level requirements and the system and operations concept.using structured or object-oriented analysis.the team specifies the software functions and algorithms needed to satisfy each detailed requirement.

    A.criterion
    B.standard
    C.model
    D.system

    答案:A
    解析:

  • 第14题:

    A project is a[temporary](请作答此空)of unique,complex,and connected activities having one goal or purpose and that must be completed by a specific time,within budget,and according to( ).Project management is the process of scoping,planning,staffing,organizing,directing,and controlling the development of a(n)( )system at a minimum cost within a specified time frame.For any systems development project,effective project management is necessary to ensure that the project meets the( ),is developed within an acceptable budget,and fulfills customer expectations and specifications,Project management is a process that starts at the beginning of a project,extends through a project,and doesn't culminate until the project is completed.The prerequisite for good project management is a well-defined system development process.Process management is an ongoing activity that documents,manages the use of,and improves an organization s chosen methodology(the“process”)for system development,Process management is concerned with the activities,deliverables,and quality standards to be applied to( )project(s).

    A.task
    B.work
    C.sequence
    D.activity

    答案:C
    解析:
    表示序列的意思。
    附(参考翻译):一个项目是一个独特的、复杂的、相互关联的活动的[临时]序列,有一个目标或目的,必须在特定的时间、预算内和根据规范完成。项目管理是一个范围界定、计划、人员配置、组织、指导和控制可接受系统开发的过程,在规定的时间内以最低的成本进行。对于任何系统开发项目,有效的项目管理都是必要的,以确保项目在截止日期前完成,在可接受的预算内开发,并满足客户的期望和规范,项目管理是从项目开始时开始的过程,延伸到一个项目中,直到项目完成才达到顶点。良好的项目管理的先决条件是定义良好的系统开发过程。过程管理是一项持续的活动,它记录、管理和改进组织为系统开发所选择的方法(“过程”),过程管理涉及应用于所有项目的活动、可交付成果和质量标准。

  • 第15题:

    In a workflow system, a process is specified using the process definition tool. Usually, processes are defined in terms of a __请作答该选项__, which consists of ____ indicated using a circle, and ____ shown as a rectangle. These two components can be linked by means of a directed arC.

    A.PERT diagram
    B.DFD
    C.Petri Net
    D.ER diagram

    答案:C
    解析:

  • 第16题:

    During the systems analysis phase, greater user involvement usually results in better communication, faster development times, and more satisfied users.There are three common team-based approaches that encourage system users to participate actively in various development tasks.1) () is a popular fact-finding technique that brings users into the development process as active participants. The end product of the approach is a requirements model.2) () is a team-based technique that speeds up information systems development and produces a functioning information system. The approach consists of several phases. The (请作答此空) combines elements of the systems planning and systems analysis phases of tbe SDLC.Users, managers, and IT staff members discuss and agree on business needs, project scope, constraints, and system requirements. During (), users interact with systems analysts and develop models and prototypes that represent all system processes, outputs, and inputs.3) () attempt to develop a system incrementally by building a series of prototypes and constantly adjusting them to user requirements.

    A.requirements planning phase
    需求计划阶段
    B.business process modeling
    业务流程建模
    C.business process improvement
    业务流程优化
    D.scope definition phase
    范围定义阶段

    答案:D
    解析:
    在系统分析阶段,重要用户参与通常会导致更好的沟通,更快的开发时间和更满意的用户。有三种常见的基于团队的方法可以鼓励系统用户积极参与各种开发任务.1)(71 Joint application development JAD联合应用开发)作为积极的参与者将用户带入开发过程的流行实况调查技术。该方法的最终产品是一个需求模型.2)(72 Rapid application development RAD)是一种基于团队的技术,可加速信息系统开发并生成功能正常的信息系统。该方法由几个阶段组成。(73 项目范围定义阶段)由生命周期管理(SDLC)中的系统规划和系统分析两个活动组成。用户、管理人员和IT人员讨论并商定业务需求、项目范围、约束和系统要求。在(74 原型设计)期间,用户与系统分析员进行交互,并开发代表所有系统过程,输出和输入的模型和原型.3)(敏捷方法)通过构建一系列原型并不断调整以满足用户需求,试图逐步开发系统。

  • 第17题:

    Besides the __请作答该选项_ for process and data of current system, the deliverable from this phase also includes the ____ for the proposed system.

    A.logical models
    B.physical models
    C.design models
    D.implementation models

    答案:A
    解析:

  • 第18题:

    A System p administrator found a process on the server that should be stopped.  Which of the following commands can be used to list all the signal actions defined for this process()

    • A、ps
    • B、pstat
    • C、lssig
    • D、procsig

    正确答案:D

  • 第19题:

    Which background process of a database instance, using Automatic Storage Management (ASM), connects as a foreground process into the ASM instance?()

    • A、ASMB
    • B、PMON
    • C、RBAL
    • D、SMON

    正确答案:A

  • 第20题:

    When an operator is trying to log off the system displays this message: you have running jobs?? What does this mean?()

    • A、One or more processes are running in the background, preventing log off.
    • B、One or more processes are paused, requiring operator input prior to logging off.
    • C、At least one process is running in the background and it will keep running after the operator logs off
    • D、At least one process is running in the background using nohup and it will terminate when the operator logs off

    正确答案:C

  • 第21题:

    多选题
    Identify the two options that can be used to patch WebLogic Server without Incurring application downtime.()
    A

    automated process using the Admin Server

    B

    automated using JDeveloper

    C

    manual process with or without Smart Update

    D

    scripted with WLST

    E

    automated process using Enterprise Manager 12c


    正确答案: C,A
    解析: 暂无解析

  • 第22题:

    单选题
    Which background process of a database instance,using Automatic Storage Management (ASM), connects as a foreground process into the ASM instance?()
    A

     ASMB

    B

     PMON

    C

     RBAL

    D

     SMON


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    On AIX systems, where DNS resolution takes precedence over NIS, a particular process needs to resolve names using /etc/hosts first.  Which of the following processes is the best way to accomplish this without affecting the rest of the system’s name resolution?()
    A

    Set the NSORDER environmental variable of the environment which invokes the process to:NSORDER=local,nis,bind

    B

    Set the NSORDER environmental variable of the environment which invokes the process to:  NSORDER=hosts=auth,nis,bind

    C

    Edit /etc/netsvc.conf to add a line similar to the following: process /full/path/of/process {hosts=local,nis,dns}

    D

    Unset NSORDER environment variable of the environment which invokes the process


    正确答案: A
    解析: 暂无解析