题目
Change management would typically be composed of the raising and recording of changes, assessing the impact, cost, benefit and risk of proposed changes,developing business justification and obtaining approval, managing and coordinating change implementation, monitoring and reporting on implementation, reviewing and closing ().


A. change reason
B. change model
C. remediation plan
D. change requests


相似考题
更多“Change management would typically be composed of the raising and recording of changes, assessing the impact, cost, benefit and risk of proposed changes,developing business justification and obtaining”相关问题
  • 第1题:

    70 Risk Event Status is defined as _____ .

    A. Risk Probability x Amount At Stake.

    B. the severity of the consequences.

    C. how likely the event is to occur with risk.

    D. (Cost + Benefit + Business Risk) / Insurable Risk.

    E. B and C


    正确答案:A

  • 第2题:

    ● During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised (75)are necessary.

    (75)

    A. proceedings

    B. controls

    C. forecasting’s

    D. prelibations


    正确答案:B

  • 第3题:

    “Cost of quality”is a project management concept that includes cost of( 73)

    A.exceedings requirements

    B.Changes to the requirements

    C.Ensuring conformance to requirements

    D.The quality control requirements


    正确答案:C

  • 第4题:

    During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised(75)are necessary.

    A.proceedings

    B.controls

    C.forecasting's

    D.prelibations


    正确答案:B
    解析:在一个项目的生命期内,有多种原因可以引起对需求的变更。当需要发生变更而工作正在进行时,可导致新的需求产生并迫使现有的需求发生变更。需要快速而有效地管理这些新的需求和新的变更。为了有效地分析这些变更的影响,必须确定每一个需求源,并记录变更的基本过程。无论如何,项目经理希望能追踪有关需求稳定性的、恰当的措施,以判断是否需要新的或修正的控制措施。

  • 第5题:

    The perform Integrated Change Contorl process is the uitimste responsbilityof the( ),Although changes my be intitated verbally,y they should be recorded in writtern form and entered into the(请作答此空)syste.

    A.quality sanagement
    B.configurat ion sanagesent
    C.risk Banagement
    D.scope management

    答案:B
    解析:
    执行综合变更控制过程是(73)的首要责任,尽管口头上对变更进行了说明,但它们应以书面形式记录并输入(74)系统。(73)A.资源管理员B.部门经理C.职能经理D.项目经理
    (74)A.质量管理B.配置管理C.风险管理D.范围管理

  • 第6题:

    If the approved change requests have an effect on the project scope,then the corresponding component documents and cost baselines,and( )of the project management plan are revised and reissued to reflect the approved changes.

    A.developing baselines
    B.testing baselines
    C.schedule base lines
    D.ending baselines

    答案:C
    解析:
    如果批准的变更请求对项目范围的影响,那么相应的组件文件和成本基线,和进度基线的项目管理计划。修订再版反映批准的变更。(75) A.发展基线 B.测试基线 C.进度基线 D.结束基线

  • 第7题:

    A new client of yours is experiencing a growth spurt. The client s IT staff is making network changes manually and, as a consequence, is extremely overworked, You suggest the client implement a network management system, citing which important business benefit?()

    • A、 potential for outsourcing the IT staff
    • B、 provision of an out-of-band managementarchiteture
    • C、 threat mitigation
    • D、 reduction in network downtime

    正确答案:D

  • 第8题:

    Which VPN management feature would be considered to ensure that the network had the least disruption of service when making topology changes?()

    • A、dynamic reconfiguration
    • B、path MTU discovery
    • C、auto setup
    • D、remote management

    正确答案:A

  • 第9题:

    单选题
    Which of the following best describe the customer benefit of assessing for network readiness in the plan phase? Select exactly 1 answer(s) from the following:()。
    A

    reduce unnecessary disruption, delays, rework, and other problems by establishing test cases for use in verifying that the system meets operational, functional, and interface requirements

    B

    improve its ability to make sound financial decisions by developing a business case based on its business requirements and establishing a basis for developing a technology strategy

    C

    reduce operating costs and limit change-related incidents by providing a consistent and efficient set of processes

    D

    improve the return on investment and hasten migration by identifying and planning for necessary infrastructure changes and resource additions, as well as reduce deployment costs by analyzing gaps early in the planning process to determine what is needed to support the system


    正确答案: B
    解析: 暂无解析

  • 第10题:

    单选题
    Which of the following best describe the customer benefits of change management in the operate phase? Select exactly 1 answer(s) from the following:()。
    A

    reduce unnecessary disruption, delays, rework, and other problems by establishing test cases for use in verifying that the system meets operational, functional, and interface requirements

    B

    improve its ability to make sound financial decisions by developing a business case based on its business requirements and establishing a basis for developing a technology strategy

    C

    reduce operating costs and limit change-related incidents by providing a consistent and efficient set of processes

    D

    improve the return on investment and hasten migration by identifying and planning for necessary infrastructure changes and resource additions, as well as reduce deployment costs by analyzing gaps early in the planning process to determine what is needed to support the system


    正确答案: A
    解析: 暂无解析

  • 第11题:

    单选题
    An example of scope verification is ().
    A

    review the performance ofan installed software module

    B

    managing changes to the project schedule

    C

    decomposing the WBS to a work package level

    D

    performing a benefit/cost analysis to determine if we should proceed with the project


    正确答案: C
    解析: 暂无解析

  • 第12题:

    单选题
    ()assesses the priority of identified risks using their probability of occurring, the corresponding impact on project objectives if the risks do occur, as well as other factors such as the time frame and risk tolerance of the project constraints of cost, schedule, scope, and quality.
    A

    Quantitative Risk Analysis

    B

    Qualitative Risk Analysis

    C

    Enterprise Environmental Factors

    D

    Risk Management Plan


    正确答案: B
    解析: 参考答案:B

  • 第13题:

    ● The purpose of configuration management is to:

    A insure drawings are updated

    B control change throughout the project

    C control change during the production only

    D generate engineering change proposals

    E inform. the project manager of changes


    正确答案:B

  • 第14题:

    ______assesses the priority of identified ri sks using their probability of occurring,the corresponding impact on project objectives if the risks do occur,as well as other factors such as the time frame. and risk tolerance of the project constraints of cost,schedule,scope,and quality.

    A.Quantitative Risk Analysis

    B.Qualitative Risk Analysis

    C.Enterprise Environmental Factors

    D.Risk Management Plan


    正确答案:B
    解析:定性风险分析利用风险发生概率、风险一旦发生对项目产生的影响以及其他因素(如时间框架和项目制约条件,即成本、进度、范围、质量的风险承受度水平),对已识别风险进行优先级的评估。
    选项A是定量风险分析,选项B是定性风险分析,选项C是企业环境因素,选项D是风险管理计划。故B是正确的。

  • 第15题:

    A variety of tools is available to help the analyst to discover the users&39; true needs. These tools are grouped into three broad techniques that are based on the degree of change anticipated in the to-be system - Business process( )is used when the basic business Requirements outlined in the system request focus on employing computer technology in some aspect of the business process. Two popular activities used in the technique are( ). Business process( )means that the basic business requirements target moderate changes to the organization&39; s operations. ( )are three popular activities in the technique. Business process( )means changing the current way of doing business and making major changes to take advantage of new ideas and new technology.

    A.automation B.modeling C.improvement D.reengineering A.duration analysis and outcome analysis B.problem analysis and root cause analysis C.technology analysis and activity elimination D.activity-based costing and informal benchmarking A.automation B.modeling C.improvement D.reengineering A.Duration analysis, activity-based costing and informal benchmarking B.Outcome analysis, technology analysis and activity elimination C.Problem analysis, root cause analysis and critical path analysis D.Cost-benefit analysis, schedule analysis and risk analysis A.automation B.modeling C.improvement D.reengineering


    正确答案:A,B,C,A,D

  • 第16题:

    Configuration management is focused on the specification of both the deliverables and the processes;while( )is focused on identifying,documenting,and approving or rejecting changes to the project documents,deliverables,or baselines.

    A.cost management
    B.change management
    C.configuration management
    D.capacity management

    答案:B
    解析:

  • 第17题:

    A variety of tools is available to help the analyst to discover the users' true needs.These tools are grouped into three broad techniques that are based on the degree of change anticipated in the to-be system . Business process(71) is used when the basic business Requirements outlined in the system request focus on employing computer technology in some aspect of the business process. Two popular activities used in the technique are(72). Business process(73)means that the basic business requirements target moderate changes to the organization' s operations.

    (74)are three popular activities in the technique. Business process (75)means changing the current way of doing business and making major changes to take advantage of new ideas and new technology.

    A. Duration analysis,activity-baseD.costing anD.informal bench marking
    B.Outcome analysis, technology analysis anD.activity elimination
    C.Problem analysis, root cause analysis anD.critical path analysis
    D.Cost-benefit analysis, schedule analysis anD.risk analysis

    答案:A
    解析:
    可以使用各种工具来帮助分析师发现用户的真实需求。基于在待系统中预期的变化程度可以将这些工具分为三种。在业务需求中强调采用计算机技术,因此而采用了业务流程(71)技术,该技术使用了两种通用的活动分别是(72)。业务流程(73)意味着基本业务需求针对组织运营的适度变化。(74)是该技术的三大活动。业务流程(75)是利用新思路和新技术来改变商业活动方式。(71) A.自动化 B.建模 C.实施 D.重建(72) A.过程分析和结果分析 B.问题分析和根本原因分析 C.技术分析和作业消除 D.基于活动的成本和非正式的标杆分析法(73) A.自动化 B.建模 C.改进 D.重建(74) A. 持续时间分析,基于活动的成本核算和非正式的基准测试 B.结果分析,技术分析和作业消除 C.问题分析和根本原因分析和关键路径分析 D.成本效益分析, 进度分析和风险分析 (75) A.自动化 B.建模 C.实施 D.重建

  • 第18题:

    Which VPN management feature would be considered to ensure that the network had the leastdisruption of service when making topology changes?()

    • A、 dynamic reconfiguration
    • B、 path MTU discovery
    • C、 auto setup
    • D、 remote management

    正确答案:A

  • 第19题:

    ()assesses the priority of identified risks using their probability of occurring, the corresponding impact on project objectives if the risks do occur, as well as other factors such as the time frame and risk tolerance of the project constraints of cost, schedule, scope, and quality.

    • A、Quantitative Risk Analysis
    • B、Qualitative Risk Analysis
    • C、Enterprise Environmental Factors
    • D、Risk Management Plan

    正确答案:B

  • 第20题:

    Which of following best describes customer benefits in delivering network readiness assessment services in plan phase?()

    • A、improve its ability to achieve business goals by identifying and aligning advanced technologies with business requirements
    • B、improve its return on investment and speed migration by improve its ability to identify,understand, and plan for necessary changes in infrastructure or resource
    • C、ensure that key employees understand all of the implementation steps
    • D、reduce the amount of risk it is exposed to by using proven project management methodologies and risk mitigation strategies

    正确答案:B

  • 第21题:

    单选题
    Which best describes the customer benefit of developing business requirements in the prepare phase?()
    A

    reduce unnecessary disruption, delays, rework, and other problems by establishing test cases for use in verifying that the system meets operational, functional, and interface requirements

    B

    improve its ability to make sound financial decisions by developing a business case based on its business requirements and establishing a basis for developing a technology strategy

    C

    reduce operating costs and limit change-related incidents by providing a consistent and efficient set of processes

    D

    improve the return on investment and hasten migration by identifying and planning for necessary infrastructure changes and resource additions, as well as reduce deployment costs by analyzing gaps early in the planning process to determine what is needed to support the system


    正确答案: B
    解析: 暂无解析

  • 第22题:

    单选题
    A new client of yours is experiencing a growth spurt. The client s IT staff is making network changes manually and, as a consequence, is extremely overworked, You suggest the client implement a network management system, citing which important business benefit?()
    A

     potential for outsourcing the IT staff

    B

     provision of an out-of-band managementarchiteture

    C

     threat mitigation

    D

     reduction in network downtime


    正确答案: B
    解析: 暂无解析

  • 第23题:

    单选题
    During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised()are necessary.
    A

    proceedings

    B

    controls

    C

    forecastings

    D

    Prelibations


    正确答案: C
    解析: 该题的关键词为"appropriate measures、 requirements volatility",其语句结构为"The project manager(主{吾) may, however, want to track(谓{吾) appropriate measures of requirements volatility(宾语) to judge whether new or revised()are necessary(目的状语从句)",含义为"项目经理也许会跟踪需求变化的相关度量,以判断是否应该调整的或者新的什么",因为整段文字讨论的内容都集中于需求变更管理,所以只分析最后一句即可,根据题意,应该在空白处填写"措施"一类的词汇,排除之后只有选项B比较适合,选项A、C和D都可以排除,尤其是选项D是一个很生僻的词汇,含义为"尝试"。