Integration(73)is the process of verifying that the components of asystem work together as described in the program design and system design specifications.
A.trying
B.checking
C.testing
D.coding
第1题:
A. Fails to express the meaning embodied in ‘selfish-secret-work-together’
B. Is the exact word to describe the situation
C. Is not the right word to describe the situation
D. Is closely related to the rough paraphrase the author started with
第2题:
Integration(73)is the process of verifying that the components of a system work togedler as described in the program design and system design speci6cations.
A.trying
B.checklng
C.testing
D.coding
第3题:
The Estimate Activity Resource process is closely coordinated with the (73)process.
(73)
A. Estimate Costs
B. Sequence Activities
C. Plan Communications
D. Conduct Procurements
第4题:
The Estimate Activity Resource process is closely coordinated with the(73) process.
A.Estimate Costs
B.Sequence Activities
C.Plan Communications
D.Conduct Procurements
第5题:
Accelerated analysis approaches emphasize the construction of (71) to more rapidly identify business and user requirements for a new system. As an accelerated analysis technology,(72) reads the program code and automatically generates the equivalent system model, and the code can be obtained from (73) All system analysis approaches require some form. of (74) which includes those techniques to be used to identify or extract system problems and solution requirements from user community.(75) is a classical set of techniques used to collect information about system problems, opportunities, solution requirements, and priorities.