  • 第1题:

    Development is a structured design methodology that proceeds in a sequence from one phase to the next.

    A.Waterfall

    B.Phased

    C.Prototyping

    D.Parallel


    正确答案:A
    解析:本题含义可表述为,瀑布模型是一种结构化设计方法,是一个阶段接着一个阶段的顺序过程。所以应该选择A。

  • 第2题:

    Viruses usually have two phases to their execution, the infection phase and the(75)phase. The later phase is optional, since stone viruses simply reproduce.

    A.reproduce

    B.proliferation

    C.defend

    D.attack


    正确答案:D
    解析:译文:病毒在执行的过程中通常有两个阶段:感染阶段和攻击阶段。有些病毒只进行简单的复制,因此可能没有攻击阶段。

  • 第3题:

    15. From the passage,we can learn _________ .

    A. one shouldn’t criticize others very often

    B. one should often make his windows clean

    C. one must judge himself before he judges others

    D. one must look at others through his dirty window


    正确答案:C
    15.C【解析】最后一段点出文章的主旨,我们在评价别人之前应先看看自己做得如何.

  • 第4题:

    Before operating a non-oceangoing ship greater than 100 gross tons it must have a fixed piping system to discharge oily mixtures ashore. This system must include______.

    A.approved oily-water separating equipment

    B.a fixed or portable containment system at the shore connection

    C.a spare pump in case the main pump is inoperative

    D.at least one outlet accessible from the weather deck


    正确答案:D

  • 第5题:

    The life cycle ofa project is a description of the various phases of the project from the beginning to the end.One of the followings is not a phase of the traditional project life cycle,itis_( )

    A.devclopment
    B.concept
    C.system analysis
    D.implementation

    答案:B
    解析:
    项目的生命周期是对项目各个阶段从开始到结束的描述,下列哪项不是一个阶段的传统项目的生命周期,他的概念阶段。A开发B概念C系统分析D实施

  • 第6题:

    The life cycle of a project is a description of the various phases of the project from the beginning to the end. One of the followings is not a phase of the traditional project life cycle, It is( ).

    A.development
    B.concept
    C.system analysis
    D.implementation

    答案:B
    解析:
    翻译:项目的生命周期是对项目各个阶段从开始到结束的描述。下列哪项不是一个阶段的传统项目的生命周期,它是概念阶段。A.开发 B.概念 C.系统分析 D.实施

  • 第7题:

    Many of the activities performed during the preliminary investigation are still being conducted in ( ), but in much greater depth than before.

    A.analysis phase
    B.design phase
    C.implementation phase
    D.maintenance phase

    答案:A
    解析:
    翻译:在初步调研时完成的许多活动在分析阶段还要继续进行,只是比以前更深入地去做。
    A.分析阶段 B.设计阶段 C.实施阶段 D.维护阶段

  • 第8题:

    --Excuse me, when is the next flight from London due to arrive? --().

    • A、An hour before
    • B、In half anhour.
    • C、Until the next one.
    • D、Before another one.

    正确答案:B

  • 第9题:

    You are a security administrator for your company. The company has one main office and five branch offices. Network administrators work in the main office and each branch office.    Network administrators in the main office frequently create scripts that automate common  administrative tasks. You review each script to ensure it does not introduce security vulnerabilities. Scripts that do not introduce security vulnerabilities are considered approved. Occasionally, branch office administrators modify these scripts and distribute the modified scripts to other  branch office administrators. Branch office administrators often report that they accidentally run a modified version of a script.    You need to ensure that branch office administrators can verify which scripts are approved scripts.  What should you do?()

    • A、 Maintain a list of the dates that the approved scripts were last modified. lnstruct branch office administrators to verif
    • B、 Digitally sign All approved scripts. Instruct branch office administrators to verify the signature before using a script.
    • C、 Distribute all approved scripts to branch office administrators in an e-mail message.
    • D、 Place all approved scripts on a file server in the main office. Assign All branch office administrators only the Allow -the approved scripts. Instruct administrators to copy scripts from this file server.

    正确答案:B

  • 第10题:

    单选题
    In the production of freshwater from seawater through a process of heating and cooling, the cooling phase of production is usually called ().
    A

    evaporation

    B

    distillation

    C

    dehydration

    D

    condensation


    正确答案: A
    解析: 暂无解析

  • 第11题:

    单选题
    Shipboard Oil Pollution Emergency Plans must be reviewed().
    A

    annually by the owner,with a letter submitted six months before expiration

    B

    only once every five years,with a letter submitted six months before expiration

    C

    and the entire plan resubmitted for approval once every five years,six months before expiration

    D

    annually by the owner,with a letter submitted to the Coast Guard within one month of the anniversary date of the plan approval


    正确答案: D
    解析: 暂无解析

  • 第12题:

    单选题
    Small floes of rough,hummocky sea ice capable of damaging a vessel().
    A

    can usually be detected by radar in a smooth sea at a range of 4 to 6 kilometers

    B

    are indistinguishable from sea return on the PPI

    C

    are invisible to radar when covered with a thick layer of snow

    D

    are usually seen at night before they are close enough to provide a radar echo


    正确答案: D
    解析: 暂无解析

  • 第13题:

    Many of the activities performed during the preliminary investigation are still being conducted in(71) , but in much greater depth than before. During this phase, the analyst must become fully aware of the(72) and must develop enough knowledge about the(73) and the existing systems to enable an effective solution to be proposed and implemented. Besides the(74) for process and data of current system, the deliverable from this phase also includes the(75) for the proposed system.

    A.analysis phase

    B.design phase

    C.implementation phase

    D.maintenance phase


    正确答案:A
    解析:初始调查阶段的许多活动仍然会在分析阶段进行,但会比前面更为深入。在这个阶段,分析师必须认识到根本性问题并且必须获取到足够的关于业务环境和现有系统的知识,以便提出和实现一种有效的解决方案。除了现有系统过程与数据的逻辑模型外,这一阶段的交付品还包括了所建议系统的形式化需求定义。

  • 第14题:

    Software maintenance is to do necessary modification, supplenemt, and completeness during software life circle. Among the following vary kinds of maintenance, which one has the maximum workload in a general way?(73).

    A.relevance maintenance

    B.completeness maintenance

    C.correctness naintenance

    D.other kinds of maintenance


    正确答案:B
    解析:译文:软件生命周期中,软件维护是进行必要的软件修改、补遗、补充。下列各种软件维护工作中哪个具有最大的工作负载?

  • 第15题:

    ● (75) Development is a structured design methodology that proceeds in a sequence from one phase to the next.

    (75)

    A. Waterfall

    B. Phased

    C. Prototyping

    D. Parallel


    正确答案:A

  • 第16题:

    The minimum amount of lifesaving equipment required aboard an 85-foot uninspected towing vessel consists of ______.

    A.One approved flotation cushion for each person on board

    B.One approved life preserver for each person on board and one life ring

    C.One approved inflatable vest for each person on board

    D.Lifeboat capacity equal to 1 1/2 times the number of persons on board


    正确答案:B

  • 第17题:

    Many of the activities performed during the preliminary investigation are still being conducted in ____, but in much greater depth than before.

    A.analysis phase
    B.design phase
    C.implementation phase
    D.maintenance phase

    答案:A
    解析:

  • 第18题:

    The life cycle of aproject is a description of the various phases of the project from thebeginning to the end. One of the followings is not a phase of the traditionalproject life cycle, It is( ).

    A.development
    B.concept
    C.system analysis
    D.implementation

    答案:B
    解析:

  • 第19题:

    Excuse me, when is the next flight from London due to arrive? ()

    AIn half an hour.

    BAn hour before.

    CUntil the next one.

    DBefore another one.


    A

  • 第20题:

    Excuse me, when is the next flight from London due to arrive? ()

    • A、In half an hour.
    • B、An hour before.
    • C、Until the next one.
    • D、Before another one.

    正确答案:A

  • 第21题:

    Which benefit can be obtained by using the CHANGE management service component in the operate phase? Select exactly 1 answer(s) from the following:()。

    • A、reduced operating costs, due to a consistent framework for making necessary changes in an efficient and accountable manner
    • B、greater accuracy, completeness, and timeliness of network configuration information
    • C、notification provided to interested parties regarding problems that have been identified, and a system that scales with customer requirements
    • D、improved system service quality and fewer disruptions

    正确答案:A

  • 第22题:

    单选题
    Excuse me, when is the next flight from London due to arrive? ()
    A

    In half an hour.

    B

    An hour before.

    C

    Until the next one.

    D

    Before another one.


    正确答案: D
    解析: 暂无解析

  • 第23题:

    单选题
    An alternator switchboard has a synchroscope and synchronizing lamps, if the synchroscope is broken, which of the steps listed is the most essential before an alternator can be paralleled with the bus ()
    A

    The breaker should be closed when one synchronizing lamp is dark and the other is bright

    B

    The breaker should be closed when both synchronizing lamps are bright

    C

    The frequency meter should be used to determine that the incoming alternator frequency is slightly higher than the bus

    D

    A portable phase sequence indicator must be used to verify the information from the lamps


    正确答案: C
    解析: 暂无解析

  • 第24题:

    单选题
    () from one phase are usually reviewed for completeness and accuracy and approved before work starts on the next phase.
    A

    Process

    B

    Milestone

    C

    Work

    D

    Deliverables


    正确答案: A
    解析: 该题的关键词为"from one phase. reviewed. the next phase",其语句结构为" ()fromone phase(主语)are usually reviewed(谓语)for completeness and accuracy and approved before work starts on the next phase",含义为"在开始下阶段之前,需要评审前阶段什么的完整性和准确性",结合选项分析,容易排除A和B,选项C过于笼统,因而选择选项D。