“索道线路勘测与设计”的英文翻译为()。A、The Development and Design of Strop RopewayB、Basic Theory of Suspension CableC、Surveying and Designing of CablewayD、Installation and Management of Cableway

题目

“索道线路勘测与设计”的英文翻译为()。

  • A、The Development and Design of Strop Ropeway
  • B、Basic Theory of Suspension Cable
  • C、Surveying and Designing of Cableway
  • D、Installation and Management of Cableway

相似考题
更多““索道线路勘测与设计”的英文翻译为()。A、The Development and Design of Strop RopewayB、Basic Theory of Suspension CableC、Surveying and Designing of CablewayD、Installation and Management of Cableway”相关问题
  • 第1题:

    Which phase of the software development requires the most development time?

    A.the design phase

    B.the testing phase

    C.the maintenance phase

    D.the development phase


    正确答案:C

  • 第2题:

    Software engineering is the science and art of specifying, designing, implementing, and(66)with economy, timeliness and elegance, programs,(67)and operating procedures whereby computers can be made useful to humanity.

    This definition implicitly sets(68)the basic goal of software engineering research and development: The basic goal of software engineering is to facilitate specification, design, implementation and evolution of programs, documentation and operating(69)which are useful to humanity in an economic,(70)and elegant manner(using the appropriate science and art).

    A.envelopment

    B.enveloping

    C.evolvement

    D.evolving


    正确答案:D

  • 第3题:

    The stages within the development phase of the software life cycle are( ).
    软件生命周期开发阶段的阶段是

    A.design,analysis,implementation,and testing
    设计、分析、实现和测试
    B.analysis,design,implementation,and testing
    分析、设计、实现和测试
    C.analysis,design,testing,and implementation
    分析、设计、测试和实现
    D.design,analysis,testing,and implementation
    设计、分析、测试和实现

    答案:B
    解析:
    属于软件生命周期中开发阶段的是分析、设计、实施和测试。

  • 第4题:

    在线路勘测设计阶段的测量工作,称为定线测量。


    正确答案:错误

  • 第5题:

    “跑车与索道的附属装置”的英文翻译为()。

    • A、Engineering Ropeway
    • B、Cable and Rigging
    • C、Cableway Yarders
    • D、Carriages and Affiliated Equipments of Cableway

    正确答案:D

  • 第6题:

    “滑索开发与设计”的英文翻译为()。

    • A、The Development and Design of Strop Ropeway
    • B、The Development and Design of Passenger Ropeway
    • C、Surveying and Designing of Cableway
    • D、Installation and Management of Cableway

    正确答案:A

  • 第7题:

    A Company.com developer is designing the presentation tier for a web application that relies on a complex session bean. The session bean is still being developed and the APIs for are NOT finalized. Any changes to the session bean API directly impacts the development of the presentation tier.  Which design pattern provides a means to manage the uncertainty in the API?()

    • A、 View Helper
    • B、 Front Controller
    • C、 Composite View
    • D、 Intercepting Filter
    • E、 Business Delegate
    • F、 Chain of Responsibility

    正确答案:E

  • 第8题:

    Without (), supply chain management doesn’t work.

    • A、logistics information system  
    • B、cable  
    • C、internet  
    • D、computer

    正确答案:C

  • 第9题:

    Which definition best describes the staging plan development service component within the design phase? Select exactly 1 answer(s) from the following:()。

    • A、providing a step-by-step plan that details the installation and service-commission tasks required in order to create a controlled-implementation environment that emulates a customer network
    • B、assessing the ability of site facilities to accommodate proposed infrastructure changes
    • C、developing and executing proof-of-concept tests, validating high-level infrastructure design, and identifying any design enhancements
    • D、improving the network management system and the performance and functionality of infrastructure operations

    正确答案:A

  • 第10题:

    Which of the following statements best describes a Pre-sales Solution Assurance Review?()

    • A、An account team proposal review
    • B、An installation planning meeting
    • C、A solution design development methodology
    • D、A technical inspection of a completed solution design

    正确答案:D

  • 第11题:

    You are planning a Windows 7 deployment infrastructure for a new company.   You have the following requirements:   Three domains  10,000 client computers No user interaction   You need to recommend a deployment infrastructure.   What should you recommend?()

    • A、Deploy Microsoft Deployment Toolkit (MDT) 2010. Design a zero-touch installation.
    • B、Deploy Microsoft System Center Virtual Machine Manager. Design a lite-touch installation.
    • C、Deploy Microsoft System Center Operations Manager 2007 R2. Design a lite-touch installation. 
    • D、Deploy Microsoft System Center Configuration Manager 2007 R2. Design a zero-touch installation.

    正确答案:D

  • 第12题:

    单选题
    Which of the following statements best describes a Pre-sales Solution Assurance Review?()
    A

    An account team proposal review

    B

    An installation planning meeting

    C

    A solution design development methodology

    D

    A technical inspection of a completed solution design


    正确答案: B
    解析: 暂无解析

  • 第13题:

    The stages within the development phase of the software life cycle are ( 71 ).

    A.design, analysis, implementation, and testing

    B.analysis, design, implementation, and testing

    C.analysis, design, testing, and implementation

    D.design, analysis, testing, and implementation


    正确答案:C

  • 第14题:

    Software engineering is the study and application of engineering to the ( ) , development and maintenance of software.
    软件工程是将工程的研究和应用运用于软件的( )设计、开发和维护。

    A.research研究
    B.management管理
    C.assembly集成
    D.design设计

    答案:D
    解析:

  • 第15题:

    During the systems analysis phase, greater user involvement usually results in better communication, faster development times, and more satisfied users.There are three common team-based approaches that encourage system users to participate actively in various development tasks.1) () is a popular fact-finding technique that brings users into the development process as active participants. The end product of the approach is a requirements model.2) () is a team-based technique that speeds up information systems development and produces a functioning information system. The approach consists of several phases. The () combines elements of the systems planning and systems analysis phases of tbe SDLC.Users, managers, and IT staff members discuss and agree on business needs, project scope, constraints, and system requirements. During (请作答此空), users interact with systems analysts and develop models and prototypes that represent all system processes, outputs, and inputs.3) () attempt to develop a system incrementally by building a series of prototypes and constantly adjusting them to user requirements.

    A.physical architecure design
    物理架构设计
    B.object design
    对象设计
    C.prototypes design
    原型设计
    D.user design phase
    用户设计阶段

    答案:C
    解析:
    在系统分析阶段,重要用户参与通常会导致更好的沟通,更快的开发时间和更满意的用户。有三种常见的基于团队的方法可以鼓励系统用户积极参与各种开发任务.1)(71 Joint application development JAD联合应用开发)作为积极的参与者将用户带入开发过程的流行实况调查技术。该方法的最终产品是一个需求模型.2)(72 Rapid application development RAD)是一种基于团队的技术,可加速信息系统开发并生成功能正常的信息系统。该方法由几个阶段组成。(73 项目范围定义阶段)由生命周期管理(SDLC)中的系统规划和系统分析两个活动组成。用户、管理人员和IT人员讨论并商定业务需求、项目范围、约束和系统要求。在(74 原型设计)期间,用户与系统分析员进行交互,并开发代表所有系统过程,输出和输入的模型和原型.3)(敏捷方法)通过构建一系列原型并不断调整以满足用户需求,试图逐步开发系统。

  • 第16题:

    铁路线路勘测设计的依据是铁道部批准的()。


    正确答案:设计任务书

  • 第17题:

    “工程索道”的英文翻译为()。

    • A、Engineering Ropeway
    • B、Cable and Rigging
    • C、Cableway Yarders
    • D、Carriages and Affiliated Equipments of Cableway

    正确答案:A

  • 第18题:

    A developer is designing the presentation tier for a web application that relies on a complex session bean.The session bean is still being developed and the APIs for it are NOT finalized. Any changes to the sessionbean API directly impacts the development of the presentation tier.  Which design pattern provides a meansto manage the uncertainty in the API?()

    • A、View Helper
    • B、Front Controller
    • C、Composite View
    • D、Intercepting Filter
    • E、Business Delegate

    正确答案:E

  • 第19题:

    Without(), supply chain management doesn’t work.

    • A、A Logistics information system  
    • B、B.cable  
    • C、C.Internet    
    • D、D.computer

    正确答案:A

  • 第20题:

    教学系统系统开发(instructional system design development)


    正确答案: 指一种用于教学的设计、开发、实施和评价的系统化方法模型。对于教学设计,不存在唯一的系统化方法模型。这些设计模型以及它们描述的过程统称为教学系统开发。典型的ISD主要阶段包括:分析、设计、开发、实施和维护。

  • 第21题:

    Which of the following SMIT panel screens are used to configure a system’s basic network parameters for the very first time only?()

    • A、Change System User Interface
    • B、TCP/IP Further Configuration
    • C、TCP/IP Minimum Configuration
    • D、Network Installation Management

    正确答案:C

  • 第22题:

    You are designing a strategy for installing Windows server 2003 on the new domain controllers. Which method should you use?()

    • A、Unattended installation
    • B、Remote Installation Services (RIS)
    • C、Automated Deployment Services (ADS)
    • D、Microsoft Systems Management Server (SMS)

    正确答案:A

  • 第23题:

    单选题
    You are designing a strategy for installing Windows server 2003 on the new domain controllers. Which method should you use?()
    A

     Unattended installation

    B

     Remote Installation Services (RIS)

    C

     Automated Deployment Services (ADS)

    D

     Microsoft Systems Management Server (SMS)


    正确答案: B
    解析: 暂无解析