第1题:
77 Since risk is associated with most projects, the best course of action is to:
A. cover all project risks by buying appropriate insurance
B. ignore the risks, since nothing can be done about them and move forward with the project in an expeditious manner.
C. avoid projects with clear and present risks
D. eliminate all known risks prior to the execution phase of the project
E. identify various risks and implement actions to mitigate their potential impact
第2题:
108 Project Risk Management is based on which of the following premises:
A. the future is unknown.
B. unknowns can result in risks or opportunities.
C. we cannot control risk events.
D. project risk impact can be measured and controlled
E. All of the above
第3题:
A OK, then please cover both War Risks and WPA for us. ;
B Well, that rate is acceptable. Thanks. ;
C But the extra premium is for buyer’s account.
第4题:
Banks in international lending face the risks common to all banks: liquidity risk, interest rate risk, credit (asset) risk, and contingent liabilities risk.
A.Right
B.Wrong
C.Doesn't say
第5题:
下列能够获赔的是( )。
A.投保FPA,装船时因吊钩断裂而造成的货损
B.投保WPA,运输途中因船上饮用水管漏水而使货物有水渍,失去商业价值
C.投保ALL RISKS 和WAR RISK,船和货因战争被核武器摧毁
D.投保ALL RISKS 和WAR RISK,货卸在转运港码头被战争双方当作掩体而损失
第6题:
Since risk is associated with most projects,the best course of action is to ( )
A.cover all project risks by buying appropriate insurance
B.ignore the risks,since nothing can be done about them and move forward with the project in an expeditious manner
C.avoid project with clear and present risk
D.identify various risks and implement actions to mitigate their potential impact
第7题:
第8题:
第9题:
第10题:
()assesses the priority of identified risks using their probability of occurring, the corresponding impact on project objectives if the risks do occur, as well as other factors such as the time frame and risk tolerance of the project constraints of cost, schedule, scope, and quality.
第11题:
The partial loss of or damage to the cargo is not recoverable from the insurer resulting from natural calamities under()in PICC Ocean Marine Cargo Clauses.
第12题:
Quantitative Risk Analysis
Qualitative Risk Analysis
Enterprise Environmental Factors
Risk Management Plan
第13题:
15 Total project risk can be defined as:
A. the sum of the probabilities of project risks events times the sum of consequences of those risks
B. the sum of the products of each project risk event times its consequences
C. the sum of the consequences of all project risk events
D. the sum of the probabilities of all project risk events
E. 1 - the sum of the probabilities of all project risk events
第14题:
145 Risks that cannot be identified or evaluated _____ .
A. should be deflected to the contracting officer.
B. should be handled via contingency allowances.
C. should be ignored, since they cannot be identified.
D. should be ignored, since they are not covered in the Risk Assessment.
E. C and D
第15题:
听力原文:M: Can you give an example of types of risks Banks face?
W: Yes. The major type of risks is called credit risk. It means a counterpart fails to perform. according to a contractual arrangement.
Q: What are they talking about?
(13)
A.A contractual arrangement.
B.A counterpart.
C.Many types of risks.
D.Credit risk.
第16题:
中国A与德国B以CIF条件成交一笔出口交易,合同规定采用CIC,但是未规定保险险别,按惯例A应投保( )。
A.FPA
B.WPA
C.ALL RISKS
D.ALL RISKS 和WAR RISK
第17题:
Since risk is associated with most projects,the best course of action is to (71)
A.cover all project risks by buying appropriate insurance
B.ignore the risks,since nothing can be done about them and move forward with the project in an expeditious manner
C.avoid project with clear and present risk
D.identify various risks and implement actions to mitigate their potential impact
第18题:
第19题:
第20题:
第21题:
Risks other()All Risks and War Risk can be covered if the extra pr- enium should be borne by the buyer.
第22题:
As usual,we are going to insure against()for 110% of the invoice value.
第23题:
The general additional risks including()are covered in all risks coverage.
第24题:
risk of shortage
risk of leakage
strikes risk
risk of rust