Connect to the network,power on the server,Micro-Partition the server
Connect to the HMC,power on the server,Micro-Partition the server,connect to the network
Power on server,connect to the network,Micro-Partition the server,connect to the HMC
Power on the server,connect to the HMC,Micro-Partition the server,connect to the network
第1题:
Company.com has recently received a new p5-570 in the data center and intends to Micro-Partition the server. In which order should installation steps be taken?()
第2题:
Companycom currently has three p650 servers in their environment and they are implementing a p5 595. The p650 servers are running in an SMP environment, but are connected to a pair of HMCs. In order to follow best practices in the enterprise server environment and maintain HMC connectivity to the p650s, what else will needs to be ordered in addition to the p5 595?()
第3题:
ompany.com has recently received a new p5-570 in the data center and wants to connect it to an existing HMC environment where each of the existing POWER5 servers has been assigned a static IP address. Which of the following actions should the technical specialist perform to set the service processor network address for a static IP?()
第4题:
You work as the enterprise exchange administrator at Company.com.The Company.com network consists of a single Active Directory domain named Company.com.Company.com has an Exchange Server 2010 organization.the Company.com contains an exchange server 2010 server named -ex10 that has imap4 installed.The users of .com use imap4 via the internet to connect to -ex10.you have received instructions from the cio to make sure that the can use -ex10 to connect to the internet.What should you do?()
第5题:
Which of the following should be done FIRST when setting up a new p5-520 to be managed by a new HMC via a private network?()
第6题:
Connect to the network,power on the server,Micro-Partition the server
Connect to the HMC,power on the server,Micro-Partition the server,connect to the network
Power on server,connect to the network,Micro-Partition the server,connect to the HMC
Power on the server,connect to the HMC,Micro-Partition the server,connect to the network
第7题:
Include a new HMC in the order to connect to the p5 595
Include a pair of new HMCs in the order to connect to the p5 595
Include a media set for POWER5 HMC in the order to upgrade one of the existing HMC’s to POWER5 capabilities
Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC to POWER5 capabilities Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC? To POWER5 capabilities
第8题:
Purchase a second HMC and use this to manage the new servers.
Connect all of the new servers to the existing private HMC network.
Configure a second private network on their existing HMC for the new servers.
Connect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.
第9题:
Configure the IP address through the first client partition.
Configure the IP address through the ASMI menus.
Configure the POWER5 service processor for DHCP from the HMC DHCP server.
Configure the HMC to use the default IP address on the service processor when acquiring the managed server.
第10题:
Verify the configuration of the connected port on the network switch.
Reboot the server.
Install a new NIC on the server.
Verify that network cables are connected.
第11题:
Create a dedicated LPAR for the existing workload and a Micro-Partition for the Web server.
Create a dedicated LPAR for the existing workload and a dedicated LPAR for the Web server.
Create a Micro-Partition for the existing workload and a dedicated LPAR for the Web server.
Create a Micro-Partition for the existing workload and a Micro-Partition for the Web server.
第12题:
In order to make sure that the virtual host can connect to the physical network, the Multipath I/O feature should be enabled on the host server.
In order to make sure that the virtual host can connect to the physical network, you should perform the installation of the Microsoft Loopback adapter on the virtual machine.
In order to make sure that the virtual host can connect to the physical network, you should perform the installation of Microsoft Hyper-V Integration Components on the virtual machine.
In order to make sure that the virtual host can connect to the physical network, you should perform the installation of the Microsoft Loopback adapter on the host server.
第13题:
Companycom recently ordered a p5 570 and an HMC. Prior to delivery, two additional p5 570 servers were added to the order. Upon installation, the system administrator noticed that they do not have a method to connect the p5 570 servers to the HMC. Which of the following will allow them to connect all servers to the HMC?()
第14题:
A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()
第15题:
A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems. They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems. What is a key requirement that they need to plan for with the new HMC?()
第16题:
A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers. The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server. How can the specialist help the customer?()
第17题:
Change passwords in ASMI
Add the managed system to the HMC
Connect the p5-520 to a power source
Connect the HMC and the p5-520 server’s HMC1 port to the same network
第18题:
Order a POWER5 HMC
Connect to the existing HMC
Install an 8-port asynchronous card in the managed server to connect to the existing HMC
Install an additional network card to the existing HMC and connect to the POWER5 service processor
第19题:
An 8-port adapter to the HMC
A hub for the private network
An additional Ethernet card to the HMC
An additional Ethernet card for each partition
第20题:
Explain to the customer that they need an additional HMC for the POWER5 system.
Obtain a PO from the customer to purchase additional serial connections to the HMC.
Obtain a PO from the customer to purchase additional Ethernet connections to the HMC.
Explain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.
第21题:
Download the latest drivers from EMC for Red Hat Advanced Server.
Ensure that the EMC storage server is configured properly and has the latest firmware levels.
Verify the equipment is on the ServerProven list and complete a Solution Assurance Review (SAR).
Ensure that the systems are connected to the EMC SAN controller.
第22题:
Connect to the network,power on the server,Micro-Partition the server
Connect to the HMC,power on the server,Micro-Partition the server,connect to the network
Power on server,connect to the network,Micro-Partition the server,connect to the HMC
Power on the server,connect to the HMC,Micro-Partition the server,connect to the network
第23题:
you should consider running the test-imapconnectivity cmdlet from -ex10.
You should consider using Telnet to connect to TCP port 587 from a client computer.
You should consider using Telnet to connect to TCP port 143 from a client computer.
you should consider running the test-outlookconnectivity cmdlet from -ex10.
第24题:
A desk, as it not rack mountable
Ethernet connections to the POWER5 systems
Serial connections to the POWER5 systems
USB connections for the keyboard and mouse