niusouti.com

单选题Which of the following can occur if the maximum rated load is exceeded on an uninterruptible power supply (UPS)?()A There is a fire hazard potential if a power outage occurs.B The last system plugged into the UPS will not be provided any power.C The UP

题目
单选题
Which of the following can occur if the maximum rated load is exceeded on an uninterruptible power supply (UPS)?()
A

There is a fire hazard potential if a power outage occurs.

B

The last system plugged into the UPS will not be provided any power.

C

The UPS will draw more power from the circuit to compensate.

D

The runtime of the UPS will be insufficient if a power outage occurs.


相似考题
更多“Which of the following can occur if the maximum rated load i”相关问题
  • 第1题:

    When a cargo boom or crane is rated at varying capacities,there will be a table at the controls which relates safe working load to ______.

    A.winch speed

    B.boom strength

    C.load radius

    D.cable strength


    正确答案:C

  • 第2题:

    Given the following expression about TextField which use a proportional pitch font.  TextField t = new TextField("they are good",40);     Which statement is true?() 

    • A、 The displayed string can use multiple fonts.
    • B、 The maximum number of characters in a line will be 40.
    • C、 The displayed width is exactly 40 characters.
    • D、 The user can edit the characters.

    正确答案:D

  • 第3题:

    Which of the following network appliances can BEST be described as allowing multiple servers toshare requests for a website through the same public IP address?()

    • A、VPN concentrator
    • B、Content filter
    • C、Load balancer
    • D、Proxy server

    正确答案:C

  • 第4题:

    Which of the following statements are true when creating NETBIOS names? ()

    • A、 NETBIOS names can only use alphanumeric characters.
    • B、 You can use a ’.’ in a NETBIOS name.
    • C、 You can use an ’_’ (underscore) in a NETBIOS name.
    • D、 NETBIOS names must be UPPERCASE
    • E、 NETBIOS names can be a maximum of 32 characters

    正确答案:B,C

  • 第5题:

    Which of the following cable types is rated to be run through air ducts?()

    • A、STP
    • B、Plenum
    • C、PVC
    • D、UTP

    正确答案:B

  • 第6题:

    Which of the following can occur if the maximum rated load is exceeded on an uninterruptible power supply (UPS)?()

    • A、 There is a fire hazard potential if a power outage occurs.
    • B、 The last system plugged into the UPS will not be provided any power.
    • C、 The UPS will draw more power from the circuit to compensate.
    • D、 The runtime of the UPS will be insufficient if a power outage occurs.

    正确答案:D

  • 第7题:

    Which of the following can be used in conjunction with a Flashback Versions Query to filter the results?()

    • A、 A range of SCN values
    • B、 A list of SCN values
    • C、 A starting and ending timestamp
    • D、 Minimum and maximum sequence values
    • E、 A list of sequence values

    正确答案:A,C

  • 第8题:

    多选题
    Which of the following statements are true when creating NETBIOS names? ()
    A

    NETBIOS names can only use alphanumeric characters.

    B

    You can use a ’.’ in a NETBIOS name.

    C

    You can use an ’_’ (underscore) in a NETBIOS name.

    D

    NETBIOS names must be UPPERCASE

    E

    NETBIOS names can be a maximum of 32 characters


    正确答案: B,C
    解析: 暂无解析

  • 第9题:

    单选题
    An HP customer would like to discuss IBM system advantages. Their current system platform is a partitioned HP rp8400. Which of the following pSeries systems and advantages should be discussed?()
    A

    p630. Maximum partitions, maximum storage, I/O bus speed

    B

    p670. Maximum partitions, maximum memory, number of I/O slots

    C

    p655. Maximum number of CPUs, processor speed, number of I/O slots

    D

    p690. Maximum number of CPUs, peak system bandwidth, peak I/O bandwidth


    正确答案: B
    解析: 暂无解析

  • 第10题:

    单选题
    Maximum horsepower of a diesel engine is attained ().
    A

    when the engine RPM is pulled down by overload

    B

    at rated engine RPM

    C

    at 95 % of rated engine RPM

    D

    at 95 % of a properly adjusted governor RPM with the engine under full load


    正确答案: C
    解析: 暂无解析

  • 第11题:

    单选题
    Which of the following is the maximum number of expansion enclosures that can be attached to anIBM Storwize V7000 Control Enclosure?()
    A

     6

    B

     9

    C

     12

    D

     18


    正确答案: C
    解析: 暂无解析

  • 第12题:

    单选题
    A datacenter has exceeded the load on the central uninterruptible power supply (UPS) for the room and is causing power load problems. Additional power is available, but not using the central UPS. Which of the following is the BEST temporary solution for adding new servers until an upgrade of the central UPS can occur?()
    A

    Continue plugging into the central UPS, but put the UPS on bypass to avoid load problems.

    B

    Plug the servers directly into the power that is not on the UPS.

    C

    Add stand alone UPSs for new servers not wired off the central UPS.

    D

    Continue plugging into the central UPS because the actual load supported is actually higher than stated


    正确答案: C
    解析: 暂无解析

  • 第13题:

    Which of the following is TRUE about a caching name server?()

    • A、They must have a trusted SSL certificate
    • B、They can be authoritative
    • C、They cannot be load-balanced
    • D、They can be recursive
    • E、They require DHCP

    正确答案:B,D

  • 第14题:

    Which of the following is the maximum number of expansion enclosures that can be attached to anIBM Storwize V7000 Control Enclosure?()

    • A、 6
    • B、 9
    • C、 12
    • D、 18

    正确答案:B

  • 第15题:

    Which of the following services can an administrator use to reduce latency and prioritize the flowof data?()

    • A、Fault tolerance
    • B、RADIUS
    • C、Qos
    • D、Load balancing

    正确答案:C

  • 第16题:

    A small office in which all workstations are using an ISP provided IP range has noticed a consistent decrease in network traffic speed. The decrease does not occur when the gateway to the ISP is disconnected. Which of the following should the administrator implement?()

    • A、Multicast addressing
    • B、Load balancing
    • C、Address translation
    • D、DHCP

    正确答案:C

  • 第17题:

    A datacenter has exceeded the load on the central uninterruptible power supply (UPS) for the roomand is causing power load problems. Additional power is available, but not using the central UPS. Which of the following is the BEST temporary solution for adding new servers until an upgrade of the central UPS can occur?()

    • A、 Continue plugging into the central UPS, but put the UPS on bypass to avoid load problems.
    • B、 Plug the servers directly into the power that is not on the UPS.
    • C、 Add stand alone UPSs for new servers not wired off the central UPS.
    • D、 Continue plugging into the central UPS because the actual load supported is actually higher than stated.

    正确答案:C

  • 第18题:

    Which of the following technologies can provide geographically based load balancing with high availability between two web servers with static content?()

    • A、Multicast
    • B、Active/passive cluster
    • C、Active/active cluster
    • D、DNS round robin

    正确答案:C

  • 第19题:

    多选题
    Which of the following can be used in conjunction with a Flashback Versions Query to filter the results?()
    A

    A range of SCN values

    B

    A list of SCN values

    C

    A starting and ending timestamp

    D

    Minimum and maximum sequence values

    E

    A list of sequence values


    正确答案: B,D
    解析: 暂无解析

  • 第20题:

    多选题
    Which three statements correctly describe the features of the I/O calibration process?()
    A

    Only one I/O calibration process can run at a time

    B

    It automates the resource allocation for the Automated Maintenance Tasks

    C

    It improves the performance of the performance-critical sessions while running

    D

    It can be used to estimate the maximum number of I/Os and maximum latency time for the system

    E

    The latency time is computed only when the TIMED_STATISTICS initialization parameter is set to TRUE


    正确答案: A,B
    解析: 暂无解析

  • 第21题:

    单选题
    Increasing the speed of a rotary pump above its rated speed will result in which of the following conditions to occur?()
    A

    Loss of suction

    B

    Increased clearances

    C

    Decreased clearance

    D

    Decreased slippage


    正确答案: B
    解析: 暂无解析

  • 第22题:

    多选题
    When executing the massload command to load catalog data into a WebSphere Commerce database on a remote DB2 server,which of the following can be used as valid values for the -method command line parameter?()
    A

    create

    B

    import

    C

    load

    D

    sqlimport

    E

    update


    正确答案: B,D
    解析: 暂无解析

  • 第23题:

    多选题
    Which of the following is TRUE about a caching name server?()
    A

    They must have a trusted SSL certificate

    B

    They can be authoritative

    C

    They cannot be load-balanced

    D

    They can be recursive

    E

    They require DHCP


    正确答案: E,C
    解析: 暂无解析

  • 第24题:

    单选题
    Which of the following can occur if the maximum rated load is exceeded on an uninterruptible power supply (UPS)?()
    A

    There is a fire hazard potential if a power outage occurs.

    B

    The last system plugged into the UPS will not be provided any power.

    C

    The UPS will draw more power from the circuit to compensate.

    D

    The runtime of the UPS will be insufficient if a power outage occurs.


    正确答案: C
    解析: 暂无解析