单选题If A customers needed to load-balance across multiple data center. which Cisco product would the customer consider?()A ACE Global Site SelectorB Site BalancerC ISR Wide Area Acceleration ServerD Nexus Site BalancerE ASR Virtual Balanced Network

题目
单选题
If A customers needed to load-balance across multiple data center. which Cisco product would the customer consider?()
A

ACE Global Site Selector

B

Site Balancer

C

ISR Wide Area Acceleration Server

D

Nexus Site Balancer

E

ASR Virtual Balanced Network


相似考题
更多“单选题If A customers needed to load-balance across multiple data center. which Cisco product would the customer consider?()A ACE Global Site SelectorB Site BalancerC ISR Wide Area Acceleration ServerD Nexus Site BalancerE ASR Virtual Balanced Network”相关问题
  • 第1题:

    Which of the following are supported in Cisco Global Site Selector? ()

    • A、 Full DNS functionality as a replacement of a DNS
    • B、 Responds to a DNS query with A-record
    • C、 Forwards queries to a name server
    • D、 Multiple A-records
    • E、 DHCP functionality for the local hosts

    正确答案:B,C,D

  • 第2题:

    A customer has multiple applications on multiple open platforms in their current environment based on IBM System Storage DS8100. They plan to set up a business continuity solution that meets the objective of zero or little data loss for their business critical data. The customer has indicated that cost is a factor.  What should the storage specialist recommend()

    • A、a DS8700 in the Business Continuity site with a Metro Mirror license
    • B、a DS8700 with SAN Volume Controller in the Business Continuity site
    • C、a DS8700 in the Business Continuity site with Global Copy license
    • D、two new DS5300 servers (production and Business Continuity site) with a Global Copy license

    正确答案:A

  • 第3题:

    You are the network consultant from Cisco.com.Your customer has eight sites and will add in thefuture. Branch site to branch site traffic is approaching 30 percent. The customer’s goals are to make iteasier to add branch sites in the future and to reduce traffic through the hub. Which VPN topology should you recommend?()

    • A、 Easy VPN
    • B、 IPsec GRE tunneling
    • C、 Virtual Tunnel Interfaces
    • D、 Dynamic Multipoint VPN

    正确答案:D

  • 第4题:

    If A customers needed to load-balance across multiple data center. which Cisco product would the customer consider?()

    • A、ISR Wide Area Acceleration Server
    • B、Nexus Site Balancer
    • C、ACE Global Site Selector
    • D、ASR Virtual Balanced Network
    • E、Site Balancer

    正确答案:C

  • 第5题:

    A customer has one IBM System Storage DS8700 in their main data center with one DS6800 at a secondary site. They are using the Global Copy feature between the sites. They want to bring up a test image at the secondary site using the primary site data. Which sequence of actions will properly bring up the secondary site?()

    • A、bring up the secondary site on the target disks
    • B、suspend and bring up the secondary site on the target disks
    • C、perform a FlashCopy and bring up the secondary site on the target disks
    • D、"go-to-sync", perform aFlashCopy, and bring up the secondary site on the target disks

    正确答案:D

  • 第6题:

    A customer has an IBM System Storage DS8100 at their primary site and a DS6800 at their recovery site, 9.5 kilometers away. They want to replicate data for disaster recovery backup with the least impact on performance. Which of the following products best accomplishes this task?()

    • A、Global Copy
    • B、Metro Mirror
    • C、Global Mirror
    • D、Metro/Global Mirror

    正确答案:C

  • 第7题:

    单选题
    Where should known problem areas in the site survey be documented?()
    A

    nowhere (but should be discussed with the customer)

    B

    on the site survey map and within the site survey text

    C

    on the customers blueprints

    D

    in the Cisco WCS Planning Tool


    正确答案: D
    解析: 暂无解析

  • 第8题:

    单选题
    The customer would like to replicate their data from site A to site B. This distance is approximately325 meters between the sites. The customer has a DS5000 with 6 DS EXP5000 expansionshelves that hold approximately 40 TB of data. Which method of replication would be supported?()
    A

    HACMP-XD

    B

    SnapMirror

    C

    SyncMirror

    D

    Enhanced Remote Mirroring


    正确答案: C
    解析: 暂无解析

  • 第9题:

    单选题
    An administrator is creating a redundant environment for a current data center. A backup site must be available if the entire data center site should become unavailable. To reduce costs, this backup site does not need to be up and running at all times ready for failover. It must contain equipment and the ability to restore data from the data center.  Which of the following site types should be considered to meet these requirements? ()
    A

     Hot site

    B

     Warm site

    C

     Cold site

    D

     Active failover site


    正确答案: B
    解析: 暂无解析

  • 第10题:

    单选题
    You are the network consultant from Cisco.com.Your customer has eight sites and will add in thefuture. Branch site to branch site traffic is approaching 30 percent. The customer’s goals are to make iteasier to add branch sites in the future and to reduce traffic through the hub. Which VPN topology should you recommend?()
    A

     Easy VPN

    B

     IPsec GRE tunneling

    C

     Virtual Tunnel Interfaces

    D

     Dynamic Multipoint VPN


    正确答案: D
    解析: 暂无解析

  • 第11题:

    单选题
    If A customers needed to load-balance across multiple data center. which Cisco product would the customer consider?()
    A

    ACE Global Site Selector

    B

    Site Balancer

    C

    ISR Wide Area Acceleration Server

    D

    Nexus Site Balancer

    E

    ASR Virtual Balanced Network


    正确答案: D
    解析: 暂无解析

  • 第12题:

    单选题
    A customer has multiple applications on multiple open platforms in their current environment based on IBM System Storage DS8100. They plan to set up a business continuity solution that meets the objective of zero or little data loss for their business critical data. The customer has indicated that cost is a factor.  What should the storage specialist recommend()
    A

    a DS8700 in the Business Continuity site with a Metro Mirror license

    B

    a DS8700 with SAN Volume Controller in the Business Continuity site

    C

    a DS8700 in the Business Continuity site with Global Copy license

    D

    two new DS5300 servers (production and Business Continuity site) with a Global Copy license


    正确答案: D
    解析: 暂无解析

  • 第13题:

    Which of these is a phase of Cisco Lifecycle Service?()

    • A、site readiness assessment
    • B、business requirements development
    • C、design
    • D、site survey
    • E、customer education

    正确答案:C

  • 第14题:

    The customer would like to replicate their data from site A to site B. This distance is approximately325 meters between the sites. The customer has a DS5000 with 6 DS EXP5000 expansionshelves that hold approximately 40 TB of data. Which method of replication would be supported?()

    • A、HACMP-XD
    • B、SnapMirror
    • C、SyncMirror
    • D、Enhanced Remote Mirroring

    正确答案:D

  • 第15题:

    If A customers needed to load-balance across multiple data center. which Cisco productwould the customer consider?()

    • A、ACE Global Site Selector
    • B、Site Balancer
    • C、ISR Wide Area Acceleration Server
    • D、Nexus Site Balancer
    • E、ASR Virtual Balanced Network

    正确答案:A

  • 第16题:

    An administrator is creating a redundant environment for a current data center. A backup site must be available if the entire data center site should become unavailable. To reduce costs, this backup site does not need to be up and running at all times ready for failover. It must contain equipment and the ability to restore data from the data center.  Which of the following site types should be considered to meet these requirements? ()

    • A、 Hot site
    • B、 Warm site
    • C、 Cold site
    • D、 Active failover site

    正确答案:B

  • 第17题:

    A financial customer has three data centers that are four kilometers apart. Their SAP application data needs to be kept synchronized within 10 milliseconds.  Which solution satisfies the customer’s recovery time objective()

    • A、DS8700 systems at each site running Metro Mirror
    • B、DS8700 systems at each site running Global Mirror
    • C、DS5300 systems at each site running Global Mirror
    • D、XIV systems at each site running Remote Mirroring

    正确答案:A

  • 第18题:

    A financial customer has three data centers that are approximately five kilometers apart. Their SAP application data needs to be kept synchronized within 10 milliseconds between the three sites. Which of the following solutions satisfies the customer's recovery time objective?()

    • A、DS8700 systems at each site running Metro Mirror
    • B、DS5300 systems at each site running Metro Mirror
    • C、DS5100 systems at each site running Global Mirror
    • D、XIV systems at each site running synchronous mirroring

    正确答案:A

  • 第19题:

    单选题
    A financial customer has three data centers that are approximately five kilometers apart. Their SAP application data needs to be kept synchronized within 10 milliseconds between the three sites. Which of the following solutions satisfies the customer's recovery time objective?()
    A

    DS8700 systems at each site running Metro Mirror

    B

    DS5300 systems at each site running Metro Mirror

    C

    DS5100 systems at each site running Global Mirror

    D

    XIV systems at each site running synchronous mirroring


    正确答案: A
    解析: 暂无解析

  • 第20题:

    单选题
    A customer has one IBM System Storage DS8700 in their main data center with one DS6800 at a secondary site. They are using the Global Copy feature between the sites. They want to bring up a test image at the secondary site using the primary site data. Which sequence of actions will properly bring up the secondary site?()
    A

    bring up the secondary site on the target disks

    B

    suspend and bring up the secondary site on the target disks

    C

    perform a FlashCopy and bring up the secondary site on the target disks

    D

    go-to-sync, perform aFlashCopy, and bring up the secondary site on the target disks


    正确答案: C
    解析: 暂无解析

  • 第21题:

    单选题
    If A customers needed to load-balance across multiple data center. which Cisco productwould the customer consider?()
    A

    ACE Global Site Selector

    B

    Site Balancer

    C

    ISR Wide Area Acceleration Server

    D

    Nexus Site Balancer

    E

    ASR Virtual Balanced Network


    正确答案: A
    解析: 暂无解析

  • 第22题:

    单选题
    A financial customer has three data centers that are four kilometers apart. Their SAP application data needs to be kept synchronized within 10 milliseconds.  Which solution satisfies the customer’s recovery time objective()
    A

    DS8700 systems at each site running Metro Mirror

    B

    DS8700 systems at each site running Global Mirror

    C

    DS5300 systems at each site running Global Mirror

    D

    XIV systems at each site running Remote Mirroring


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    If A customers needed to load-balance across multiple data center. which Cisco product would the customer consider?()
    A

    ISR Wide Area Acceleration Server

    B

    Nexus Site Balancer

    C

    ACE Global Site Selector

    D

    ASR Virtual Balanced Network

    E

    Site Balancer


    正确答案: A
    解析: 暂无解析

  • 第24题:

    单选题
    An administrator is creating a redundant environment for a current data center. A backup site must be available if the entire data center site should become unavailable. To reduce costs, this backup site does not need to be up and running at all times ready for failover. It must contain equipment and the ability to restore data from the data center. Which of the following site types should be considered to meet these requirements?()
    A

    Hot site

    B

    Warm site

    C

    Cold site

    D

    Active failover site


    正确答案: A