单选题A customer plans to deploy a disaster recovery site and requires a complete mirror of their production and test environments. They have an excellent relationship with the business partner who helped them with their initial deployment.  Which of the fol

题目
单选题
A customer plans to deploy a disaster recovery site and requires a complete mirror of their production and test environments. They have an excellent relationship with the business partner who helped them with their initial deployment.  Which of the following will help with a successful implementation?()
A

IBM technical support services

B

IBM Global Financing

C

IBM Global Business Services

D

IBM Solutions Assurance Review


相似考题
更多“单选题A customer plans to deploy a disaster recovery site and requires a complete mirror of their production and test environments. They have an excellent relationship with the business partner who helped them with their initial deployment.  Which of the fol”相关问题
  • 第1题:

    A global customer’s IT strategy is based upon two DS8000 systems and an N series gateway. They want to protect their  business by implementing a disaster recovery solution. The storage specialist has recommended cascaded mirroring.  Which of the following is the business benefit of cascaded replication()

    • A、it is cost efficient, as a single N series or DS8000 can have its controllers split between the  primary and secondary site and use semi- synchronousmirroring while using asynchronous mirroring to a third site
    • B、the second site acts as a repeater station so that greater geographical distances can be achieved
    • C、ITprovides high availability together with disaster recovery by implementing Metro/Global Mirror across three geographically dispersed systems
    • D、it guarantees data protection by implementing two synchronous copies of the primary site data

    正确答案:C

  • 第2题:

    A customer has an IBM System Storage DS8700 at their primary site and an XIV system at their recovery site, which is 9.5 kilometers away. They want to replicate data for disaster recovery backup.  Which factor is a primary consideration when proposing a solution for this customer()

    • A、compatibility of copy functions
    • B、difference in capacities in the two systems
    • C、cache size discrepancies between the two systems
    • D、the necessity of using two storage management products

    正确答案:A

  • 第3题:

    A customer has a large amount of data stored on three database servers and is concerned that at present there is no disaster recovery plan in place.  They have an existing tape backup solution that meets their backup window.  In order to analyze potential disaster recovery plans, which of the following questions is the most important?()

    • A、What is the minimum critical backup window?
    • B、Which server is handling the most critical data?
    • C、How much data is stored on each server?
    • D、What is the throughput of the hard drives?

    正确答案:B

  • 第4题:

    A customer has an IBM System Storage DS8100 at their primary site and a DS6800 at their recovery site, 9.5 kilometers away. They want to replicate data for disaster recovery backup with the least impact on performance. Which of the following products best accomplishes this task?()

    • A、Global Copy
    • B、Metro Mirror
    • C、Global Mirror
    • D、Metro/Global Mirror

    正确答案:C

  • 第5题:

    单选题
    When doing the Solution Assurance for a p5 570 with several LPARs, it is discovered that the customer plans to back the system up using mksysb. The customer would like to do unattended automated system backups and incorporate them into their off-site data recovery system. Which mksysb solution should be implemented?()
    A

    A local DVD-ROM drive

    B

    A NFS mount on a NIM Master

    C

    A SSA disk array and mirror the data

    D

    A local tape drive and use DLPAR to move the tape to each LPAR


    正确答案: C
    解析: 暂无解析

  • 第6题:

    单选题
    You need to test your disaster recovery solution. Which role should you transfer to the disaster recovery location during the test?()
    A

    RID master

    B

    Schema master

    C

    PDC emulator master

    D

    Domain naming master


    正确答案: C
    解析: 暂无解析

  • 第7题:

    单选题
    A customer is considering a second p690 at a second site for Disaster Recovery purposes.  Which of the following On Demand offerings is most applicable in this environment?()
    A

    On/Off CoD

    B

    Reserve CoD

    C

    Permanent CUoD

    D

    Capacity Backup


    正确答案: A
    解析: 暂无解析

  • 第8题:

    单选题
    Which of the following disaster recovery sites requires power and cabling to be run before it can be used?()
    A

     Hot site

    B

     Cold site

    C

     Warm site

    D

     Failover site


    正确答案: B
    解析: 暂无解析

  • 第9题:

    单选题
    A global customer’s IT strategy is based upon two DS8000 systems and an N series gateway. They want to protect their  business by implementing a disaster recovery solution. The storage specialist has recommended cascaded mirroring.  Which of the following is the business benefit of cascaded replication()
    A

    it is cost efficient, as a single N series or DS8000 can have its controllers split between the  primary and secondary site and use semi- synchronousmirroring while using asynchronous mirroring to a third site

    B

    the second site acts as a repeater station so that greater geographical distances can be achieved

    C

    ITprovides high availability together with disaster recovery by implementing Metro/Global Mirror across three geographically dispersed systems

    D

    it guarantees data protection by implementing two synchronous copies of the primary site data


    正确答案: A
    解析: 暂无解析

  • 第10题:

    多选题
    A Site Administrator is preparing for disaster recovery.  In the case that a hard disk fails, which of the following would he need to do to have a complete backup?()
    A

    A

    B

    B

    C

    C

    D

    D

    E

    E


    正确答案: E,B
    解析: 暂无解析

  • 第11题:

    单选题
    A customer has a mission-critical application with redundant fabrics. The customer plans to replace older EMC Symmetrix 8830 systems with an IBM System Storage DS8700 and an IBM SAN Volume Controller (SVC).  Which statement best describes the way to minimize the impact of data migration on the production environment()
    A

    the production environment does not require an outage

    B

    the production environment requires an outage to install the SVC

    C

    the production environment requires an outage to install the DS8700

    D

    the production environment requires an outage to remove the EMC systems


    正确答案: C
    解析: 暂无解析

  • 第12题:

    单选题
    A System z customer is planning to deploy the IBM System Storage DS6800 in each of threesmall data centers located around a large city. A backup data center with an IBM System StorageDS8100 will serve as the disaster recovery facility. Which advanced function can the customerimplement to meet disaster recovery requirements?()
    A

    Global Mirror for zSeries

    B

    Metro Mirror

    C

    Global Copy

    D

    Metro/Global Mirror


    正确答案: B
    解析: 暂无解析

  • 第13题:

    A customer has two data centers, 500 kilometers apart. The customer requests a proposal for new storage subsystems and a disaster recovery solution that provides consistent data in the event of a disaster at the local site.  Which IBM System Storage DS8000 solution should the storage  specialist propose to the client()

    • A、Metro/Global Mirror
    • B、Metro Mirror
    • C、Global Copy
    • D、Global Mirror

    正确答案:D

  • 第14题:

    A customer has a mission-critical application with redundant fabrics. The customer plans to replace older EMC Symmetrix 8830 systems with an IBM System Storage DS8700 and an IBM SAN Volume Controller (SVC).  Which statement best describes the way to minimize the impact of data migration on the production environment()

    • A、the production environment does not require an outage
    • B、the production environment requires an outage to install the SVC
    • C、the production environment requires an outage to install the DS8700
    • D、the production environment requires an outage to remove the EMC systems

    正确答案:B

  • 第15题:

    A customer plans to deploy a disaster recovery site and requires a complete mirror of their production and test environments. They have an excellent relationship with the business partner who helped them with their initial deployment.  Which of the following will help with a successful implementation?()

    • A、IBM technical support services
    • B、IBM Global Financing
    • C、IBM Global Business Services
    • D、IBM Solutions Assurance Review

    正确答案:D

  • 第16题:

    单选题
    While discussing the customer’s environment the storage specialist discovers that the customerhas both Windows and UNIX servers running various applications. The customer is looking for acost effective 10 TB solution that includes a mirrored site to meet their Disaster Recovery plan.Which of the following solutions should be recommended?()
    A

    DS5020 system running Metro Mirror and Volume Copy

    B

    Storwize V7000 running FlashCopy and Volume Copy

    C

    DS5020 system runningFlashCopy and Enhanced Remote Mirror

    D

    DS5300 system runningFlashCopy and Enhanced Remote Mirror


    正确答案: C
    解析: 暂无解析

  • 第17题:

    单选题
    A customer is involved in an IBM critical situation (CritSit). The customer recently installed iDATAPIex. The business partner has been assessed a significant penalty by IBM. Which of the following is the reason for this action by IBM?()
    A

    The business partner was required to perform a TDA and failed to do so

    B

    The business partner recommended a nonworking configuration

    C

    The business partner did not support the customer correctly

    D

    The business partner failed to sell Remote Technical Support (RTS)


    正确答案: C
    解析: 暂无解析

  • 第18题:

    单选题
    You are Cisco Channel Partner Account Manager. Which service component within the preparephase recommends the appropriate technology strategy to address a business requirement of the customer?()
    A

     finding out what a customer requires from a proposed solution

    B

     analyzes the customer’s business requirements and recommends the appropriate Cisco technologies to meet business requirements

    C

     finding out what end-user training a customer requires

    D

     finding out a customer’s physical requirements


    正确答案: C
    解析: 暂无解析

  • 第19题:

    单选题
    A customer plans to deploy a disaster recovery site and requires a complete mirror of their production and test environments. They have an excellent relationship with the business partner who helped them with their initial deployment.  Which of the following will help with a successful implementation?()
    A

    IBM technical support services

    B

    IBM Global Financing

    C

    IBM Global Business Services

    D

    IBM Solutions Assurance Review


    正确答案: B
    解析: 暂无解析

  • 第20题:

    单选题
    A customer has two data centers, 500 kilometers apart. The customer requests a proposal for new storage subsystems and a disaster recovery solution that provides consistent data in the event of a disaster at the local site.  Which IBM System Storage DS8000 solution should the storage  specialist propose to the client()
    A

    Metro/Global Mirror

    B

    Metro Mirror

    C

    Global Copy

    D

    Global Mirror


    正确答案: D
    解析: 暂无解析

  • 第21题:

    单选题
    A customer has a large amount of data stored on three database servers and is concerned that at present there is no disaster recovery plan in place.  They have an existing tape backup solution that meets their backup window.  In order to analyze potential disaster recovery plans, which of the following questions is the most important?()
    A

    What is the minimum critical backup window?

    B

    Which server is handling the most critical data?

    C

    How much data is stored on each server?

    D

    What is the throughput of the hard drives?


    正确答案: B
    解析: 暂无解析

  • 第22题:

    单选题
    A customer has an IBM System Storage DS8100 at their primary site and a DS6800 at their recovery site, 9.5 kilometers away. They want to replicate data for disaster recovery backup with the least impact on performance. Which of the following products best accomplishes this task?()
    A

    Global Copy

    B

    Metro Mirror

    C

    Global Mirror

    D

    Metro/Global Mirror


    正确答案: C
    解析: 暂无解析

  • 第23题:

    单选题
    A customer has an IBM System Storage DS8700 at their primary site and an XIV system at their recovery site, which is 9.5 kilometers away. They want to replicate data for disaster recovery backup.  Which factor is a primary consideration when proposing a solution for this customer()
    A

    compatibility of copy functions

    B

    difference in capacities in the two systems

    C

    cache size discrepancies between the two systems

    D

    the necessity of using two storage management products


    正确答案: C
    解析: 暂无解析

  • 第24题:

    单选题
    A bank has requested proposals for a storage solution to implement disaster recovery processes for their IBM System z configured with Linux, IBM System p configured with AIX, and Microsoft Windows environments. The solution must simulate a multi-site environment and provide the customer the ability to evaluate Metro Mirror, Global Mirror, and FlashCopy. Floor space is limited. What hardware platform provides this native support?()
    A

    IBM XIV Storage System

    B

    IBM System Storage DS5300

    C

    IBM System Storage DS8800

    D

    IBM System Storage DS5020 with SVC


    正确答案: C
    解析: 暂无解析