第1题:
Upon announcement,the specific details surrounding the Virtual I/O Server requirements and performance are still being defined. The customer has engaged IBM to provide a server consolidation solution and would like to take advantage of the VIO Server benefits. How should the pSeries technical specialist best address this?()
第2题:
retail company plans to consolidate 180 existing dual processor Xeon servers, all running a web server application on Windows Server 2003. They are planning consolidating to a single x3950 X5 running vSphere.Which of the following should be discussed with this customer? ()
第3题:
A customer is in the initial stages of implementing a server consolidation project. The Information Technology staff has identified several Microsoft Windows servers that are running single applications on older hardware and averaging under 20% utilization. Part of their server consolidation goal is to lower the number of servers, decrease the operating system license cost, and increase utilization per server. Which of the following IBM Director extensions could be used to satisfy all of these requirements?()
第4题:
The sales team has just sold the first pSeries solution to a Windows NT customer. The team has identified concerns with a non-existent backup strategy and some workable environmental issues. In addition to these concerns,what other major concern should be considered?()
第5题:
All servers on your companys network run Windows Server 2008 R2. All users have thin client computers. You need to recommend a virtualization solution that allows users to use applications that run only on Windows 7. Which technology should you recommend?()
第6题:
Design the solution and present it confidently so the customer does not question it.
Design the solution and ensure the customer understands the unknowns with the new technology.
Explain to the customer that the VIO Server does not benefit them when doing server consolidation so it has not been configured.
Explain to the customer that the details surrounding the VIO Server have not been clearly defined so designing a solution is premature.
第7题:
Consider two servers for redundancy and failover
Web content static or dynamic information
Processor utilization of the existing web servers
SCSI orFibre Channel storage solution
第8题:
Create a single DNS SRV record that contains all servers.
Create a single DNS A record and configure an HTTP host header for each IIS server.
Create five DNS A records with the same name. Point each A record to a different IIS server and disable the round robin option.
Create five DNS CNAME records with the same name. Point each CNAME record to a single IIS server. Disable the netmask ordering option.
第9题:
PowerVM Lx86
PowerVM Express Edition
PowerVM Standard Edition
PowerVM Enterprise Edition
第10题:
Do the web servers require SMP capability?
Is the web content static or dynamic information?
What is the average CPU utilization of the existing web servers?
Will the servers need a SCSI or Fibre Channel storage solution?
What are the expected growth rates for the web servers?
第11题:
Reduction in operating system software licensing and application costs
Reduction in floor space and hardware cost saving
VMWare is licensed per system so no extra charge for SMP support
No single point of failure, reducing downtime
第12题:
Run amepat now on all of the existing LPARs.
Run amepat after consolidation on all LPARs.
Run amepat now on all existing LPARs running on the POWER6 servers.
Run amepat now on all existing LPARs running database applications.
第13题:
A customer is considering replacement of twenty older 4U and 6U rack-based servers with one IBM x366 Server running VMWare ESX attached to one DS4300. Which of the following represents a reduction in Total Cost of Ownership (TCO) for the customer?()
第14题:
An existing IBM customer has some iSeries servers in their environment. The customer is adding an x366 server with an RSA-II installed for their Microsoft Client/Server applications. The customer wants to consolidate the storage and centralize the backup of the iSeries and xSeries platforms. Which of the following will accomplish this?()
第15题:
A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()
第16题:
A retail company plans to consolidate 180 existing dual processor Xeon servers, all running a web server application on Windows Server 2003. They are planning consolidating to a single x3950 X5 running vSphere. Which of the following should be discussed with this customer?()
第17题:
Your company has an Active Directory Domain Services (AD DS) domain. All servers run Windows Server 2008 R2. All portable computers run Windows 7. You virtualize applications by using Microsoft Application Virtualization (App-V). You are deploying servers to five new branch offices. Each branch office has its own subnet, and will stream virtual applications from a local IIS server. Users frequently move between branch offices with their portable computers. You need to ensure that branch office users access virtualized applications only from the local IIS server. What should you do?()
第18题:
Share the data over the Ethernet LAN.
Install the IXA Adapter in the iSeries server.
Install the IXA Adapter in the xSeries server.
Attach both servers to an IXS switch.
第19题:
Aurema Application Workload Manager
Remote Deployment Manager
Virtual Machine Manager
Capacity Manager
第20题:
Can the application use Hot Swap Processor, Memory, and PCI-X technology?
Will the application benefit from larger disk cache and swap space?
Will the application run faster with Microsoft OLTP technology?
What is the application's maximum processor scaling capability?
第21题:
Custom printer third-party software.
APM and Anti-virus software
All Non-Microsoft Products
All 32-bit applications
Third-party video drivers
第22题:
Is the web content static or dynamic information
Consider two servers for redundancy and failover
What is the average CPU utilization of the existing web servers
Will the servers need a SCSI or Fibre Channel storage solution
第23题:
Software Rejuvenation
Capacity Manager
Capacity Workload Manager
Aurema Application Workload Manager
第24题:
z/OS, DS8000, TSM
TSM, LTO-5, VMware
System x, VMware, XIV
System p, VMware, DS5000