问题:单选题A customer plans to add high performance shared storage with three servers and using direct attach. Cost is a minor issue compared to performance. Which of the devices meets this requirement?()A DS3200B EXP3000C DS3300D DS3400...
查看答案
问题:单选题A customer wants to update their system with the lasted drivers. Which the following tool you suggest?()A Bootable Media CreatorB Advanced Settings UtilityC UpdateXpress System Pack InstallerD ServerGuide Scripting Toolkit...
问题:单选题IBM ToolsCenter Bootable Media Creator is used to create bootable media. Which of the following functions can be performed with this tool?()A Update Firmware, Update Drivers, Run Diagnostics Install WindowsB Update Firmware, Update Drivers, Run Diagnos...
问题:单选题Which statements is true about Predictive Failure Analysis (PFA) for System x servers?()A PFA is embedded in selected server components and requires no action for being enabledB PFA is available only when the Server Plus Pack is installed on the server...
问题:单选题Which of the following Blade servers offer hot swap internal hard drives?()A HS21B HS22C HS22VD HX5...
问题:单选题A customer needs maximum performance with fault-tolerance from their disk subsystem. Which RAID level meets this requirement?()A RAID-0B RAID-1C RAID-5D RAID-10...
问题:单选题A retail customers application environment requires 32 memory slots and four processors to run scientific, and technical computing, financial, weather simulation, and life sciences. Which of the following System x server meets these needs at minimum co...
问题:单选题A retail customer has a database server that requires more than 64Gb memory and four or more processors sockets. Which of the following system x servers meets this requirements?()A x3655B x3950 M2C x3755D x3650 M3...
问题:单选题A customer plans to implement a network of x3690 X5 servers. The customer has very limited funds. Which of the following tools would allow installation of firmware updates?()A ToolsCenterB VMware vSphere 4C Tivoli Provisioning Manager (TPM)D Tivoli Sto...
问题:单选题After putting together a configuration that meets customer’s requirements, a TDA is suggested. The customer is not familiar with the TDA process and asks why this should be done. This of the following is the benefit of TDA?()A A TDA are recommended on...
问题:单选题A customer needs to install a rack with six of the x3650 M3 servers with the standard line cords. Each server has redundant power supplies. Which of the following meets this requirement?()A Two of DPI C13 Enterprise PDU 39Y8941B One of DPI Universal ...
问题:单选题A prospective customer has a SCSI installed. The new project requires a large high performance storage and tape network . The customer does not appear to understand the terminology and options of the fiber channel components of the solution. Further di...
问题:单选题A toy manufacturing customer wants to run Microsoft SQL Server. Which category is applicable for such a solution?()A E-mailB DatabaseC Network InfrastructureD Systems Management...
问题:单选题A customers has asked you to investigate their current x86 server environment to determinate if they can achieve a reduction in power and rack consumption. They plan to implement VMware and the local storage shared. Which of the following consolidation...
问题:单选题A customer who is reducing their technical staff has requested an Intel server proposal from various vendors. Which of the following is most relevant to this proposal?()A Systems ManagementB Grid ComputingC Advanced Energy Manager (AEM)D Remote KVM...
问题:单选题What is the maximum amount of memory supported on IBM BladeCenter HS22 (using 4GB DIMMs)?()A 128GBB 32GBC 48GBD 64GB...