niusouti.com

单选题A customer is planning a combined solution of a 2 node SVC and DS8700 with 128x300 GB FC disks. During the TDA the reviewer compares the machine configuration with the customer’s expectations.  Which of the following customer requirements must be consi

题目
单选题
A customer is planning a combined solution of a 2 node SVC and DS8700 with 128x300 GB FC disks. During the TDA the reviewer compares the machine configuration with the customer’s expectations.  Which of the following customer requirements must be considered()
A

the number of SAN ports required by the solution

B

thin provisioning is mandatory

C

the solution needs to support RAID 0

D

the solution needs to be supported by the VMware Site Recovery Manager


相似考题
更多“单选题A customer is planning a combined solution of a 2 node SVC and DS8700 with 128x300 GB FC disks. During the TDA the reviewer compares the machine configuration with the customer’s expectations.  Which of the following customer requirements must be consi”相关问题
  • 第1题:

    A customer is planning to buy a two enclosure Power 770, and will implement 4 LPARs with the following requirements:Each LPAR must have a private, dedicated connection to the network.The adapter for this network connection must be hot-swappable.The customer wants to minimize the number of I/O slots used. Which of the following fulfills the customer requirements?()

    • A、Two dual-port PCIe adapters
    • B、A four-port PCIe Ethernet adapter
    • C、Four separate PCIe Ethernet adapters
    • D、Two embedded Integrated Virtual Ethernet adapters (IVE)

    正确答案:C

  • 第2题:

    An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC storage infrastructure. The customer dissatisfaction has arisen during the installation because according to the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not supported. Which of the following is the most probable cause of the customer dissatisfaction()

    • A、The EMC storage specialist has not participated in the TDA meeting
    • B、The FC HBAs are 4 Gbps technology
    • C、The Technical and Delivery Assessment review actions were not executed
    • D、The customer should have checked that the HBAs are supported according to the HP storage interoperability matrix

    正确答案:C

  • 第3题:

    The customer is planning a new IBM System Storage DS5020 using iSCSI and direct attachedfibre channel connectivity in a redundant configuration. The customer is planning to set up adisaster recovery solution in the near future by using Enhanced Remote Mirroring. Which of thefollowing considerations are critical for this customer?()

    • A、customer must reconfigure aniSCSI port for mirroring
    • B、customer must set up a fabric and dedicate port 4 for disaster recovery
    • C、customer must set up a fabric and dedicate port 2 for disaster recovery
    • D、replication is not possible with the DS5020, they must consider the DS5300

    正确答案:C

  • 第4题:

    A customer is looking at an Oracle eBusiness solution. They would like to know what hardware they will need for the solution. They have some preliminary information from Oracle, including hardware requirements and specifics for their environment. Which of the following should be done next?()

    • A、Configure a 2 node x3950 X5 
    • B、Customer needs a System p server to support Oracle applications 
    • C、Download the Oracle eBusiness sizing questionnaire from IBM, fill out with customer and submit to IBM for System x sizing 
    • D、Configure a system that meets the minimum requirements

    正确答案:C

  • 第5题:

    A customer would like to implement an IBM System Storage DS8000 solution. A Capacity Magic study has determined that 500 drives of 450 GB are required to meet the customer’s capacity requirements. Limited space is available for additional systems in the data center.  Which solution  best meets the customer’s requirements()

    • A、DS8800 system with three frames
    • B、DS8800 system with one frame
    • C、DS8700 system with two frames
    • D、DS8800 system with two frames

    正确答案:D

  • 第6题:

    单选题
    The customer is planning a new IBM System Storage DS5020 using iSCSI and direct attachedfibre channel connectivity in a redundant configuration. The customer is planning to set up adisaster recovery solution in the near future by using Enhanced Remote Mirroring. Which of thefollowing considerations are critical for this customer?()
    A

    customer must reconfigure aniSCSI port for mirroring

    B

    customer must set up a fabric and dedicate port 4 for disaster recovery

    C

    customer must set up a fabric and dedicate port 2 for disaster recovery

    D

    replication is not possible with the DS5020, they must consider the DS5300


    正确答案: C
    解析: 暂无解析

  • 第7题:

    单选题
    A customer is planning to buy a two enclosure Power 770, and will implement 4 LPARs with the following requirements:Each LPAR must have a private, dedicated connection to the network.The adapter for this network connection must be hot-swappable.The customer wants to minimize the number of I/O slots used. Which of the following fulfills the customer requirements?()
    A

    Two dual-port PCIe adapters

    B

    A four-port PCIe Ethernet adapter

    C

    Four separate PCIe Ethernet adapters

    D

    Two embedded Integrated Virtual Ethernet adapters (IVE)


    正确答案: A
    解析: 暂无解析

  • 第8题:

    单选题
    During the pre-installation planning of a customer’s recently purchased IBM System Storage DS8700 the port configuration, cabling, and disk layout were discussed.  What other topic should be discussed in this solution review()
    A

    LPAR capacity planning

    B

    logical volume configuration

    C

    data migration process

    D

    audit hosts for HBA worldwide port names


    正确答案: B
    解析: 暂无解析

  • 第9题:

    单选题
    The account team is putting together a very complex solution for the customer.  During the solution design phase, many of the customer’s requirements have changed and additional requirements are being identified.  What should the pSeries technical specialist do to ensure the greatest possible customer satisfaction?()
    A

    Use eConfig to configure and validate each pSeries and p5 system.

    B

    Engage Advanced Technical Support to review any outstanding technical issues.

    C

    Confirm with the customer that the solution design meets their requirements.

    D

    Perform a Pre-Install Solution Assurance Review to validate required power requirements.


    正确答案: D
    解析: 暂无解析

  • 第10题:

    单选题
    After putting together a configuration that meets customer’s requirements, a TDA is suggested. The customer is not familiar with the TDA process and asks why this should be done. This of the following is the benefit of TDA?()
    A

     A TDA are recommended only for high end hardware and very large or complex business opportunities

    B

     A TDA will ensure the solution and configuration are complete and technically sound and meet customer requirements

    C

     A TDA will guarantee that the hardware will work in customer’s environment at the volumes projected

    D

     A TDA brings an IBM technician onsite to properly inspect and installed hardware and related software


    正确答案: B
    解析: 暂无解析

  • 第11题:

    单选题
    A storage specialist is proposing a solution consisting of an IBM System Storage TS3200 TapeLibrary and a SAN Volume Controller, both of which are being added to a customer’s existing SANenvironment for the first time. Which of the following should be completed before the proposal ispresented to the customer?()
    A

    TDA

    B

    Capacity Magic

    C

    business case review

    D

    SAN configuration review


    正确答案: B
    解析: 暂无解析

  • 第12题:

    单选题
    A customer would like to implement an IBM System Storage DS8000 solution. A Capacity Magic study has determined that 500 drives of 450 GB are required to meet the customer’s capacity requirements. Limited space is available for additional systems in the data center.  Which solution  best meets the customer’s requirements()
    A

    DS8800 system with three frames

    B

    DS8800 system with one frame

    C

    DS8700 system with two frames

    D

    DS8800 system with two frames


    正确答案: B
    解析: 暂无解析

  • 第13题:

    A customer is interested in obtaining an AIX solution from IBM.  They have two primary global requirements:   ? Availability (although HACMP is not required)   ? Low cost   Which of the following approaches should the pSeries technical specialist use to meet the customer’s requirements and ensure customer satisfaction?()

    • A、Design the least-cost solution to prevent the competition from winning the business.
    • B、Design a disaster recovery (DR) solution and convince the customer why DR is important to their business.
    • C、Use the HACMP specialist to design the solution and include HA SmoothStart services as part of the proposal.
    • D、Design a solution with redundant parts and explain to the customer the incremental cost associated with the redundancy.

    正确答案:D

  • 第14题:

    After putting together a configuration that meets customer’s requirements, a TDA is suggested. The customer is not familiar with the TDA process and asks why this should be done. This of the following is the benefit of TDA?()

    • A、 A TDA are recommended only for high end hardware and very large or complex business opportunities
    • B、 A TDA will ensure the solution and configuration are complete and technically sound and meet customer requirements
    • C、 A TDA will guarantee that the hardware will work in customer’s environment at the volumes projected
    • D、 A TDA brings an IBM technician onsite to properly inspect and installed hardware and related software

    正确答案:B

  • 第15题:

    During the pre-installation planning of a customer’s recently purchased IBM System Storage DS8700 the port configuration, cabling, and disk layout were discussed.  What other topic should be discussed in this solution review()

    • A、LPAR capacity planning
    • B、logical volume configuration
    • C、data migration process
    • D、audit hosts for HBA worldwide port names

    正确答案:C

  • 第16题:

    A UNIX customer has a Symmetrix DMX that has crashed three times in the past six months, causing data loss. The customer is shopping for an enterprise storage solution to provide point-in- time copy functionality without a fixed relationship to its primaries.  Which IBM solution best meets this customer’s requirements()

    • A、IBM System Storage DS8700 andVolumeCopy
    • B、IBM System Storage DS8700 andFlashCopy
    • C、IBM System Storage DS8700 andFlashCopy with the NoCopy option
    • D、IBM System Storage DS8700 andFlashCopy with the Persistent option

    正确答案:B

  • 第17题:

    The account team is putting together a very complex solution for the customer.  During the solution design phase, many of the customer’s requirements have changed and additional requirements are being identified.  What should the pSeries technical specialist do to ensure the greatest possible customer satisfaction?()

    • A、Use eConfig to configure and validate each pSeries and p5 system.
    • B、Engage Advanced Technical Support to review any outstanding technical issues.
    • C、Confirm with the customer that the solution design meets their requirements.
    • D、Perform a Pre-Install Solution Assurance Review to validate required power requirements.

    正确答案:C

  • 第18题:

    单选题
    During the implement phase, systems acceptance testing does which of the following for the customer? Select exactly 1 answer(s) from the following:()。
    A

    installation, configuration, and testing, as well as the commissioning of tools and processes in accordance with the operations implementation plan

    B

    provision of information regarding customer-specified design requirements and configuration

    C

    the migration of network services from an existing state to a future state in accordance with the migration plan

    D

    the provision of an objective means of measuring system operability and functionality


    正确答案: B
    解析: 暂无解析

  • 第19题:

    单选题
    A current Sun Solaris customer has just purchased their first p5 590. During the Solution Assurance, the backup requirements were discussed. Which of the following should be recommended to the customer with regards to restoring rootvg?()
    A

    mksysb

    B

    restvg

    C

    AIX install CDs

    D

    Veritas NetBackup


    正确答案: C
    解析: 暂无解析

  • 第20题:

    单选题
    A UNIX customer has a Symmetrix DMX that has crashed three times in the past six months, causing data loss. The customer is shopping for an enterprise storage solution to provide point-in- time copy functionality without a fixed relationship to its primaries.  Which IBM solution best meets this customer’s requirements()
    A

    IBM System Storage DS8700 andVolumeCopy

    B

    IBM System Storage DS8700 andFlashCopy

    C

    IBM System Storage DS8700 andFlashCopy with the NoCopy option

    D

    IBM System Storage DS8700 andFlashCopy with the Persistent option


    正确答案: C
    解析: 暂无解析

  • 第21题:

    单选题
    A customer is interested in obtaining an AIX solution from IBM.  They have two primary global requirements:   ? Availability (although HACMP is not required)   ? Low cost   Which of the following approaches should the pSeries technical specialist use to meet the customer’s requirements and ensure customer satisfaction?()
    A

    Design the least-cost solution to prevent the competition from winning the business.

    B

    Design a disaster recovery (DR) solution and convince the customer why DR is important to their business.

    C

    Use the HACMP specialist to design the solution and include HA SmoothStart services as part of the proposal.

    D

    Design a solution with redundant parts and explain to the customer the incremental cost associated with the redundancy.


    正确答案: C
    解析: 暂无解析

  • 第22题:

    单选题
    A customer has a requirement for a storage solution that meets the following criteria:       (1)Heterogeneous hosts attached       (2)Support for block I/O       (3)High Speed       (4)Scalable  Which solution would satisfy the customer’s requirement?()
    A

    SAN

    B

    NAS

    C

    SCSI

    D

    iSCSI


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    A customer would like to convert their existing IBM System Storage DS8100 to a DS8700 to gain more capacity. During the TDA review the impact on the running production environment during conversion is discussed. Which of the following must be considered?()
    A

    DS8000 model conversions are generally non-disruptive

    B

    a model conversion from DS8100 to DS8700 is disruptive

    C

    the DS8100 base frame needs to be sent back to the factory for upgrade

    D

    during model conversion the logical configuration can be kept, but the system must be rebooted


    正确答案: D
    解析: 暂无解析

  • 第24题:

    单选题
    A customer is planning a combined solution of a 2 node SVC and DS8700 with 128x300 GB FC disks. During the TDA the reviewer compares the machine configuration with the customer’s expectations.  Which of the following customer requirements must be considered()
    A

    the number of SAN ports required by the solution

    B

    thin provisioning is mandatory

    C

    the solution needs to support RAID 0

    D

    the solution needs to be supported by the VMware Site Recovery Manager


    正确答案: D
    解析: 暂无解析